The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

19167

CONDITIONAL

Sligo - Sligo County Council

Proposed Development

for development consisting of the erection of an agricultural machinery storage shed and carry out all ancillary site works (this site is adjacent to the Thatch Cottage that is listed as RPS 226 on the Sligo record of protected structures 2011--2017)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Apr 2019

  2. Decision: CONDITIONAL

    14 Jun 2019

  3. Decision due

    23 Jun 2019

  4. Grant issued

    17 Jul 2019

Application Details

Location
Halfquarter Td , Ballysadare , Co. Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.47 ha

Timeline

Registration Date
29 April 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
14 June 2019
Grant Date
17 July 2019
Permission Expires
16 July 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

329m
2460189REFUSED28 May 2024

a) The construction of 1 no. warehousing building made up of 4 no. units totalling 1,200 m2. b) New site entrance via existing business park, waste water treatment system, associated car parking, service connections and all associated site works

Abbeytown Ballisodare Co. Sligo ,

330m
21235CONDITIONAL16 Jun 2021

development consisting of the retention of alterations to previously granted dwelling planning register reference PL1623. alterations consisting of reduction of glazing on north and south elevations, 2 windows removed, 2 instances of 2 windows reduced to 1 window, 2 additional windows, a change from a door to a window, bay window changed to a flat roofed corner window, a window instead of a roof window and an overall increase of floor area of 21.68sqm

Abbeytown , Ballisodare , Co. Sligo

427m
2288N/A7 Mar 2022

development consisting of the following: (a) Construction of a new 520sqm single storey building, comprising of retail area with ancillary off-licence use, 2 no. ancillary food offer counters, seating area, toilets, manager's office and ancillary storage and food preparation areas; (b) 'drive thru' take away facility associated with the food offer including ordering/collection windows; (c) Construction of a new forecourt with 4 no. pump islands and canopy over; (d) Installation of 4 no. 40,000L underground fuel storage tanks, associated pipeworks and overground fill points; (e) Installation of 1 no. truck pump island and associated storage tanks, pipework and overground fill points. (f) Installation of 1 No. jet wash facility; (g) Installation of 1 No. main totem sign and (h) Installation of on-site wastewater treatment system (i) Construction of all ancillary site features including screened bin compound, screened refuse compound, signage, boundary treatments, drainage systems, landscaping and car parking And associated site works.

Ballina Rd , Abbeytown , Ballysadare

463m
20402CONDITIONAL23 Nov 2020

development comprising of the following; a) The construction of 2 no. warehousing units totalling 1,363 m2 and associated carparking. B) replacement of existing septic tank and percolation area and all associated site works

Ballina Road , Abbeytown , Ballysadare

465m
2076N/A10 Mar 2020

development consisting of the following a) The construction of 2 no. warehousing units totalling 1,183m2, associated carparking, and associated site works

Ballina Rd. , Abbeytown , Ballysadare

465m
2054N/A24 Feb 2020

Development consisting of the following: a) the construction of 2 no. warehousing units totaling 1,183 m2, associated carparking. And associated site works

Ballina Road , Abbeytown , Ballisodare

682m
1850CONDITIONAL23 Feb 2018

PP - for development consisting of the continued use and operation of the existing quarry and quarry extension area (19 hectares) permitted under Plan Reg. Ref. No. PL02/299 (ABP Ref. No. PL21 .201367) including the existing concrete batching plant and block making facility (in its current location at the eastern end of the site); the existing access onto the N59 road; existing weighbridges; existing wheel wash; existing crushing and screening plant; existing washing plant and closed circuit washwater management system; revisions to the permitted quarry extraction area along the northern boundary; provision of a landscaped screening berm along the northern boundary; existing landscaped screening berms and associated landscaping works; and for final restoration of the quarry all within an application area of c.45 hectares

Abbeytown and Kilboglasy towlands , Ballysadare , Co Sligo

826m
22278CONDITIONAL11 Aug 2022

development consisting of: 1. Partial demolition of an existing rear extension (floor area approx 15m2); 2. Partial demolition of an existing rear shed (floor area approx. 53m2); 3. Construction of a new, rear, two storey extension to the existing dwelling house; together with all associated ancillary site works and services

Abbeytown , Ballisodare , Co Sligo

854m
22341CONDITIONAL14 Oct 2022

development consisting of construction of: (1) two number, two storey detached dwelling houses: (2) a new vehicular access via an existing entrance on adjoining lands; together with all associated ancillary site works and service connections

Abbeytown , Ballisodare , Co. Sligo

883m
19497CONDITIONAL11 Dec 2019

development consisting of the retention of alterations to previously approved plans for renovation and extension of an existing dwelling, Planning Register Reference PL 15/302 and PL 16/87, consisting of; a first floor window to west gable; west facing window to dormer to Bedroom 4 at the first floor; amended first floor footprint to include former attic space with 10.8 sq m of additional gross floor area and ground floor rear window adjustments

Abbeytown , Ballisodare , Co. Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?