19184

REFUSED

Carlow - Carlow County Council

Proposed Development

a single storey bungalow, along with garage, incorporating a waste water treatment system and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 May 2019

  2. Decision: REFUSED

    2 Jul 2019

  3. Decision due

    4 Jul 2019

Application Details

Location
Straboe , Killerig , Co. Carlow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Carlow County Council
Floor Area
221.75 sq m
Residential Units
2

Timeline

Registration Date
10 May 2019
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
2 July 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
19115N/A26 Mar 2019

for a single storey bungalow along with garage incorporating a waste water treatment system and all associated site works

Straboe , Kilerig , Co. Carlow

0m
1963N/A19 Feb 2019

a single storey bungalow along with garage incorporating a waste water treatment system and all associated site works

Straboe , Killerig , Co. Carlow

547m
22393N/A18 Nov 2022

alteration and extension to existing dwelling and all associated site works

Straboe , Killerig , Co. Carlow

548m
2360007CONDITIONAL23 Jan 2023

alteration and extension to existing dwelling and all associated site works

Straboe , Killerig , Co. Carlow

681m
2460355CONDITIONAL7 Nov 2024

Retention permission for a single storey extension to the front and side of existing two storey dwelling house and all associated site works

Straboe Lane , Killerig , Co. Carlow

778m
2660253N/A11 Aug 2026

construction of a proposed part 1.5 storey, part single storey dwelling, detached shed, new vehicular entrance off existing agricultural lane, upgrade works to part of existing agricultural lane, wastewater treatment system, landscaping and all associated site works

Killerrig , Carlow , Co. Carlow

788m
2660100N/A8 Apr 2026

the construction of a proposed part 1.5 storey, part single storey dwelling, detached shed, new vehicular entrance, wastewater treatment system, landscaping and all associated site works

Killerrig , Carlow , Co. Carlow

816m
2460196REFUSED11 Jul 2024

a 10 year planning permission on lands including Straboe and Killerig, Carlow, Co. Carlow. The development will consist of permission for a Solar PV Energy Development with associated Battery Energy Storage System Compound with a total site area of c. 132.28ha, to include solar panels mounted on steel support structures, associated cabling and ducting, inverters, transformers, switchgear substations, auxiliary transformer, permanent storage containers, monitoring houses, composting toilet, BESS customer substation, battery blocks, BESS inverters and PCS (twin skid), BESS interface cabinets (BIC), backup generator, temporary construction compounds, tracks, boundary security fencing and security gates, CCTV, landscaping and ancillary works, with a 40year operational period. It is proposed that the Proposed Development will be accessed from four separate access points which will include (i) a new access created off the R726; (ii) a new entrance off Straboe Lane; (iii) a widened and improved existing entrance off Straboe lane; and (iv) use of an existing and previously consented entrance off the R418. A Natura Impact Statement (NIS) has been submitted to the Planning Authority with the Application

lands including Straboe and Killerrig , Carlow , Co. Carlow

816m
2460160N/A11 Jun 2024

the development will consist of permission for a Solar PV Energy Development with associated Battery Energy Storage System Compound with a total site area of c. 132.28ha, to include solar panels mounted on steel support structures, associated cabling and ducting, inverters, transformers, switchgear substations, auxiliary transformer, permanent storage containers, monitoring houses, composting toilet, BESS customer substation, battery blocks, BESS inverters and PCS (twin skid), BESS interface cabinets (BIC), backup generator, temporary construction compounds, tracks, boundary security fencing and security gates, CCTV, landscaping and ancillary works, with a 40year operational period. It is proposed that the Proposed Development will be accessed from four separate access points which will include (i) a new access created off the R726; (ii) a new entrance off Straboe Lane; (iii) a widened and improved existing entrance off Straboe lane; and (iv) use of an existing and previously consented entrance off the R418. A Natura Impact Statement (NIS) has been submitted to the Planning Authority with the Application

On lands including Straboe and , Killerrig , Carlow

816m
2460409CONDITIONAL13 Dec 2024

a new single-storey kitchen, dining area and solarium and a new waste water treatment system

Killerig , Co. Carlow , R93 W308

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?