19189

CONDITIONAL

Sligo - Sligo County Council

Proposed Development

for development consisting of (i) The construction of an ESB sub-station, (ii) The construction of an external yard/plant area to the rear of the existing building, (iii) The provision of a bicycle storage shed, (iv) The provision of a smoking hut, (v) Extension to, and completion of access roads to the site, (vi) Demolition of small out-building, (vii) The provision of public lighting on the site, (viii) An underground surface water sewer network including on-site attenuation and petrol/oil interceptor(s) and connections to existing surface water infrastructure, (ix) Corporates signage, (x) 3 no.flagpoles, (xI) 2 no. automated traffic barriers & site fencing/gates, (xii) Elevational changes to existing industrial unit, (xiii) Additional floor space to first floor, (xiv) Porches, and connections to services and all ancillary works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 May 2019

  2. Decision: CONDITIONAL

    27 Jun 2019

  3. Decision due

    10 Jul 2019

  4. Grant issued

    30 Jul 2019

Application Details

Location
Site Number 2 , IDA Finisklin Business Park , Finisklin
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
1.468 ha

Timeline

Registration Date
16 May 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 June 2019
Grant Date
30 July 2019
Permission Expires
29 July 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

107m
18458CONDITIONAL27 Nov 2018

Development consisting of the demolition of a cold store extension (217 sqm gross floor area) to the rear of existing mixed use building (1,426 sqm gross floor area) with elevation alterations including a new entrance, reconfigured existing entrance with new canopies over both, new window opes, and new exterior finishes to the mixed use building, site works to include reconfigured surface car park to front and rear of building with proposed total of 42 no. car park spaces and 20 no cycle spaces along with all associated site development and landscaping works.

Unit 10 , Saint Colm's Centre , Finisklin Business Park

108m
21386CONDITIONAL24 Sept 2021

development consisting of a Sub-division of a part of unit 10 and change of use from light industrial to warehouse with the inclusion of ancillary trade counters (for the sale of building related products principally to trade) the remainder of the building will remain light industrial. Proposed works are as follows: internally the mezzanine level in the rear return will be removed. There would be trade counters inserted along with a proposed new access to the south of the unit. Externally and to the north of the building new bollards on "goods in" entrance; new mechanical plant area; on the south elevation new opening and access doors to service the trade counters and some levelling works along the footpath as well as remarking parking spaces to create a " clear area" and disabled space to the south of the building; block up the entrance on the east elevation. Proposed signage on the south elevation. All other ancillary works to complete the development

Unit 10 St. Colm's Centre , Finisklin Business Park , Sligo

110m
2063CONDITIONAL2 Mar 2020

development consisting of the construction of a new link road at the IDA Finisklin Business Park, in the townland of Finisklin, Sligo, Co. Sligo. The works will consist of the construction of a new section of road that will link two existing cul de sacs with all ancillary works including footpaths, street lighting, ducting and drainage

Finisklin Business Park , Finisklin , Sligo

133m
2358CONDITIONAL24 May 2023

development consisting of: 1.The demolition of a portion of the existing industrial units (B & C)(810SQM) to facilitate the construction, in their place, of a new portal frame unit (unit B), similar in height to the main retained unit (A). 2. The re-cladding of the retained industrial unit (A) along with new glazed openings and access doors. The building will be clad with profiled insulated metal cladding. 3. The resurfacing and upgrading of the associated service yard, the access route from Finisklin road and existing car parking to facilitate the new development and the provision of secure and sheltered bicycle parking with additional staff car parking spaces to the rear of the site. 4. All associated site and civil works including rainwater attenuation.

Finisklin Road , Finisklin Business Park , Sligo

137m
2360205CONDITIONAL8 Aug 2023

free standing canopy at the loading bay at the east side of Unit No 1 St Colms Centre

Unit No 1 St Colms Centre , Finisklin , Sligo

160m
20284REFUSED24 Aug 2020

Development consisting of: (1) demolition of existing dwelling house and associated outbuildings, (2) construction of a four-storey Secondary Care and Education Centre comprising of education, counselling, rehabilitation and training rooms, reception area and toilets together with 25 No. supported independent living/bedroom units. Total floor area of the centre to be approx. 1160 sq. m. (3) associated site development works including upgrading of existing entrance, landscaping and on-site car parking

Finisklin Road , Finisklin , Co Sligo

161m
2560269N/A30 Jun 2025

change of use of existing residential house to office space with store and for alterations and extension to existing building including relocation of existing site entrance, new site signage and all associated site works

Finisklin Road , Finisklin , Co. Sligo

223m
185CONDITIONAL11 Jan 2018

for development consisting of 1. Construction of new 2 storey office / light Industrial building (floor area - 1297m2) Provision of connection to foul, storm & waterman services 3. Provision of street lighting and signage. 4. Provision of car parking located beside subject building and additional car parking on lands to the southeast of the access road and all associated site works

Finisklin Business & Technology Park , Finisklin , Sligo

223m
21406CONDITIONAL8 Oct 2021

PP - development consisting of the following: 1. Removal of existing small store and construction of a new three-bay extension to the rear of our existing factory for Assembly Area/Storage use (floor area - 487.7m2), 2. Connection to existing foul, storm and watermain services, 3. Provision of additional carparking, landscaping and all associated site works

Finisklin Business & Technology Park , Finisklin , Sligo

230m
21186CONDITIONAL11 Jan 2022

PP - development consisting of redevelopment at this site of our existing school. Part of the site is in the curtilage of the Ursuline Convent, a protected structure (FPS 43). The proposed development will consist of: - Demolition of ca. 1,556m2 of existing additions, extensions and temporary accommodation buildings; - Construction of New 4,357 m2 part 3-, and 2-, secondary school building, connected to existing 2006 2-storey extenion and Sports Hall building which is to be reconfigured, upgraded and its roof replaced; - Demolition of ca. 341m2 of additions and extensions adjoining historic buildings to be retained; - Refurbishment of and alterations to existing 1,506m2 1930 3-storey building with new lift extension and accessibility interventions; - Conservation works to existing 1860's Chapel and its repurposing as a music room; - Holding works for future use to 1860's building elements adjoining the Convent, a protected structure; - Holding works for future use to the 1860's building, which is proposed to return to being a stand-alone building after demolitions of additions and extensions thereto; - Separate staff car-park with vehicular access from existing northern gate to be modified and associated traffic works; - Upgrade to existing student vehicular drop-off, set-down and parking provisions to east; - Associated hard-surface play areas, landscaping, boundary treatments; - Associated surface water attenuation, foul and surface water drainage connections, site works and ancillary services; - Associated phased construction proposals to facilitate continuance of eduation provision during the works

Finisklin , Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?