The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

19195

CONDITIONAL

Galway - Galway County Council

Proposed Development

and full permission. Retention Planning Permission is sought for replacement of 5 no. car parking bays with existing courtyard lounge, under and to rear of existing hotel. Full planning permission is sought for reassignment of a number of car parking spaces to create an additional disabled parking space. Full permission is also sought for a new single storey extension (47m2) to existing ground floor hotel kitchen, at ground floor parking area, under and to the rear of existing hotel. Extension comprises delivery/storage/prep space, and server. Development includes any works to landscaping and site services. Gross floor space of proposed works: 47 sqm

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Feb 2019

  2. Further information requested

    5 Apr 2019

  3. Further information received

    10 Jun 2019

  4. Decision: CONDITIONAL

    5 Jul 2019

  5. Decision due

    7 Jul 2019

  6. Grant issued

    12 Aug 2019

Application Details

Location
Átl an Ghlugain ,
Applicant
N/A
Application Type
RETENTION
Planning Authority
Galway County Council
Site Area
0.02 ha

Timeline

Registration Date
14 February 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
5 July 2019
Grant Date
12 August 2019
Permission Expires
11 August 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

64m
21514REFUSED1 Apr 2021

chun bloc dhá stór go leith do 4 árasán a thógáil le leagan amach páirceála athbhreithnithe agus na hoibreacha láithreáin gaolmhara go léir. Spás urláir comhlán na n-oibreacha beartaithe: 374.8 sqm

Áth an Ghlugair ,

78m
171872CONDITIONAL22 Dec 2017

Is eárd a bheid sa bhforbairt seo ná (1) Cead d'athrú úsáide ar an urlár na talún, ó mhiondíol go bialann ina suí. (2) Cead le haghaidh athrú úsáide ar an gcéad urlár ó limistéar miondíola coimhdeach go limistéar stórála bialann. (3) Cead le haghaidh páirceála dromchla breise ar chúl an tsuímh agus (4) Cead maidir le comharthaíocht athbhreithnithe ar an t-ingearchló, mar aon leis na hoibreacha agus na seirbhísí láithreáin a bhaineann leo. Spás urláir comhlán na n-oibreacha beartaithe 198.9sqm.

Bearna ,

78m
181553CONDITIONAL1 Nov 2018

chun iarratas a dhéanamh ar chead ag Unit 1B, Áth an Ghlugair. Beidh athruíthe ar an mBialann ceadaithe roimhe seo (arna dheonú faoi Pl. Uimh. 17/1872) lena n-áirítear; (1) Páirceáil a athsholáthar os comhair an áitribh le limistéar suíocháin lasmuigh (2) Soláthar páirceála dromchla breise ar chúl an láithreáin (3) Tógáil staighre agus stóráil bruscair ar chúl an fhoirgnimh agus (4) Cead le haghaidh athbhreithnithe comharthaíocht chun tosaigh ingearchló, mar aon leis na hoibreacha agus na sierbhísí láithreáin a bhaineann leo

Áth an Ghlugair ,

82m
191337CONDITIONAL27 Aug 2019

chun umair gáis a choinneál ar chúl an bhialann reatha

Áth an Ghlugair Bearna ,

90m
18148CONDITIONAL13 Feb 2018

le haghaidh Forbairt Cónaithe ar shuíomh sa Phríomhshráid (R336). Is éard a bheidh sa fhorbairt ná tógáil na nithe seo a leanas: (1) Comhshó athruithe agus síneadh scioból leath-thréigthe chun freastal ar 1 uimh. (2 leaba), (2) Foirgneamh dhá stór a thógáil chun freastal ar 2 uimh (3 leaba) agus (3) Tógáil 6 uimh. dhá theach agus dhá urláir (3 leaba) teorainneacha (4) Cóireálacha Teorainneacha Athbhreithnithe agus (5) Dúnadh ar bhealaí isteach láithreach agus tógáil bóithre rochtana nua ón bpríomhshráid agus (6) le seirbhísí draenála agus uisce reatha, mar aon le na hoibreacha agus na seirbhísí ar fad a bhaineann leo. Tá RPS Uimh. 748. Struchtúr faoi Chosaint, suite ar an suíomh. Gross floor space of proposed works 1165.6 sqm.

Bearna ,

90m
19527REFUSED9 Apr 2019

chun athbreithnithe a dhéanamh ar an bhforbairt a bhí ceadaithe faoi uimhir thagartha pleanála 18/148 ar shuíomh ar an bPríomhshráid (R336). Is éard atá i gceist leis an bhforbairt na athrú úsáide óna aonaid cónaithe uimhrithe 2 go dtí 9 a ceadú roimhe seo, go dtí tithe saoire gear-thréimhseach, féinfhreastail, chomh maith le na hoibreacha agus na seirbhísí uileag a bhaineann leo. Tá RPS Uimh. 748. Strchtúr faoi Chosaint, suite ar an suíomh. Spás urláír comhlán na n-oibreacha beartaithe: 1114 sqm

Rinn na Mara ,

90m
23376UNCONDITIONAL18 Sept 2023

le haghaidh forbairt cónaithe ar shuíomh sa phríomhshráid (R336). Is éard a bheidh sa fhorbairt ná tógáil na nithe seo a leanas: (1) comhshó athruithe agus síneadh scioból leath-thréigthe chun freastal ar 1uimh. (2 leaba), (2) foirgneamh dhá stór a thógáil chun freastal ar 2uimh. (3 leaba) agus (3) tógáil 6uimh. dhá theach agus dhá urláir (3 leaba) teorainneacha (4) cóireálacha teorainneacha athbhreithnithe agus (5) dúnadh ar bhealaí isteach láithreach agus tógáil bóithre rochtana nua ón bpríomhshráid agus (6) le seirbhísí draenála agus uisce reatha, mar aon le na hoibreacha agus na seirbhísí ar fad a bhaineann leo. Tá RPS Uimh. 748. Struchtúr faoi cosaint, suite ar an suíomh

Bearna ,

90m
2460160CONDITIONAL16 Feb 2024

for revisions to previously permitted development granted under PI. Ref. No. 18/148 (as extended under PI. Ref. No. 23/376). The development will consist of: (1)retention and completion of revisions to ground floor and rear elevation of rear building block (units 4-9), to provide for an additional 50sqm gross floor area, (2) permission for change of use of use of units (4-9), to provide for short stay self-catering holiday homes, (3) permission for change of roof plans and alterations to external elevations to units 1-9, together with all associated site works and services. RPS NO. 748, a Protected Structure, is located within the application site. Gross floor space of proposed works: 308 sqm & 846.2 sqm. Gross floor space of work to be retained: 50 sqm

Rinn na Mara , Bearna , Co. Galway

91m
2560693CONDITIONAL30 May 2025

for revisions to previously permitted development granted under Pl. Ref. No. 18/148 (as extended under Pl. Ref. No. 23/376), as amended under Pl. Ref. No. 24/60160. The development will consist of Retention and completion of ; alterations of external elevations to rear building block (House Unit No.’s 4-9), and alterations to external elevations to front building blocks, Apartment Unit No.’s 1, 2 & 3, together with all associated site works and services. RPS No. 748, a Protected Structure, is located within the application site

Rinn na Mara , Bearna , Co. Galway

91m
2660747REFUSED14 May 2026

permission for further revisions to previously permitted development granted under Pl. Ref. No. 18/148 (as extended under Pl. Ref. No. 23/376), as amended under Pl. Ref. No.’s 24/60160 & 25/60693. The development consists of retention and completion of Revisions to layout to include revised parking and internal footpath arrangements, revised communal open space provision, revised internal boundary treatments, and revised private open space provision to residential unit No. 1; retention of alterations to the 6 no. terraced units to the rear (Unit No.’s 4-9), to become 6 no. 4 bed units, by providing an additional ground floor bedroom to each unit in lieu of garage parking, with revisions to ground floor elevations, together with all associated site works and services. RPS No. 748, a Protected Structure, is located within the application site

Rinn na Mara , Bearna , Co. Galway

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?