19229
N/ALeitrim - Leitrim County Council
Proposed Development
construction of a residential development consisting of 37 no. units (total) including 18 no. 2- bedroom apartments, 3 no. 2-bedroom and 16 no. 3-bedroom dwelling houses, in the form of 3 no. 2-storey terraced blocks, creation of new vehicular entrances, associated access roads and parking, site boundaries, connections to the public water main, foul & surface water drainage systems, footpaths, refuse storage areas, landscaping and all necessary and ancillary site works to complete the development
View the full application file on the council's planning portal →Application Details
- Location
- Cannaboe , Ballinamore , Co. Leitrim
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Leitrim County Council
- Floor Area
- 1846 sq m
- Residential Units
- 19
Timeline
- Registration Date
- 7 November 2019
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of a residential development consisting of 35 no. units (total) including 18 no. 2- bedroom apartments, 2 no. 2-bedroom and 15 no. 3-bedroom dwelling houses, in the form of 3 no. 2-storey terraced blocks, creation of new vehicular entrances, associated access roads and parking, site boundaries, connections to the public water main, foul & surface water drainage systems, footpaths, refuse storage areas, landscaping and all necessary and ancillary site works to complete the development in lieu of Permission for construction of a residential development consisting of 37 no. units (total) including 18 no. 2- bedroom apartments, 3 no. 2-bedroom and 16 no. 3-bedroom dwelling houses, in the form of 3 no. 2-storey terraced blocks, creation of new vehicular entrances, associated access roads and parking, site boundaries, connections to the public water main, foul & surface water drainage systems, footpaths, refuse storage areas, landscaping and all necessary and ancillary site works to complete the development
Cannaboe , Ballinamore , Co Leitrim
development comprising of a three-storey office building over the existing basement car park, incorporating the partially constructed ground floor of a previously permitted development (Plan File No. P07/585) and provides 2,467m2 (gross) of office accommodation. The proposal also includes alterations to the existing ground floor footprint, provides alternative fire escape arrangements from the existing adjoining structure. Permission is further sought for all necessary & ancillary site development works to facilitate the development. connection to the existing basement car park is to be maintained.
Cannaboe , Ballinamore , Co. Leitrim
proposed development comprising alterations to the existing entrance (north) to the Rock Quarter and the construction of a single storey café with ancillary facilities and a public accessible WC within the existing open concourse. The new café includes the footprint of a previously permitted retail unit, adjacent to the main entrance under Plan file No. P.07/585. Permission is further sought for a new canopy over the existing concourse with glazed sliding doors and screens at the main entrance (north) to centre, glazed infill of existing openings to the street, relocation of existing signage and the provision of new signage. Permission is further sought for all necessary & ancillary site development works to facilitate the development
Cannaboe , Ballinamore , Co. Leitrim
proposed development comprising of single- storey pharmacy with ancillary facilities within the partially complete ground floor previously permitted as "Retail Unit No. 06" under Plan File No. P.07/585, Public access is proposed from both the existing open concourse and from the existing doorway to the rear elevation (south). Service access is also from the second existing doorway to the rear elevation(south). Permission is further sought for the provision of new internal and external signage and all necessary & ancillary site development works to facilitate the development
Cannaboe , Ballinamore , Co. Leitrim
Demolish two-storey extension to rear of existing building and construct three storey extension comprising 3 no. shower rooms, one per floor to service conversion of commercial building to 3 no. apartments (Exempted Development)
'Delahoide' High Street , Ballinamore , Co. Leitrim
1. To change the use of the 2nd floor storage space to livable accommodation in roof space. 2. To construct 2 number Veluxes and all ancillary works.
High St. , Ballinamore , CO. LEITRIM
To convert an existing commercial 1st floor into the following tourism type accommodation. (1). 5 no ensuite bedrooms. (2). Communal kitchen dining living space. (3). Allow for amendments to the external elevations as necessary to accommodate the revised floor plan layouts and all ancillary works
High Street , Cannaboe , Ballinamore Co Leitrim
I, Bryan Cribbin, intend to apply for Permission for works to High Street, Ballinamore, Co. Leitrim, N41 EK85 as follows:(1) part demolition of Southwest rear return; (2) change of use from mixed office/ retail and residential use as ground floor pharmacy use (233sqm) with residential use overhead; (3) residential extension at first floor level to rear Southwestern elevation (9.1sqm); (4) 1 no. 1-bedroom apartment at first floor level (47.63 sqm) ;1 no. 1-bedroom apartment at second floor level (45.36 sqm); 1 no. 2-bedroom duplex apartment over first and second floor levels (69.70 sqm); (5) internal alterations to suit; (6) alterations to front elevation including new shop front; (7) external works include the provision of car parking and cycle spaces and service area to the rear and all necessary site works.
High Street , Ballinamore , Co. Leitrim
(a) change of use of former retail / light hardware store to use as bar & lounge which is an extension of the original bar; (b) part basement incorporating stores and extension over incorporating bar & lounge; (c) external balcony structure with canopy and external escape stairs to rear; (d) alterations to floor plans and elevations; (e) external canopies to front and associated site works
Prior's Bar , High Street , Ballinamore
construction of retail unit, gross floor area 946 M. Sq., connection to existing services, signage and site development works
The Rock Quater , Cannaboe & Tully , Ballinamore
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?