← Back to search

Aghamore (E.D. Roosky) Td , Rooskey , Co. Leitrim

CONDITIONAL

Planning application 19247

Leitrim - Leitrim County Council

Proposed Development

construct a new dwelling house, domestic garage with new connection to public sewer, new entrance onto the public road and all associated site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Nov 2019

  2. Decision: CONDITIONAL

    16 Jan 2020

  3. Decision due

    23 Jan 2020

  4. Grant issued

    19 Feb 2020

Application Details

Location
Aghamore (E.D. Roosky) Td , Rooskey , Co. Leitrim
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Leitrim County Council
Floor Area
232.35 sq m
Residential Units
1

Timeline

Registration Date
20 November 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
16 January 2020
Grant Date
19 February 2020
Permission Expires
18 February 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

357m
17118CONDITIONAL21 Jun 2017

construct a new dwelling house, domestic garage with connection to public sewer, new entrance onto the public road and all associated site development works

Aghnahunhsin Td , Rooskey , Co. Leitrim

428m
1980N/A10 Apr 2019

development consisting of (a) demolition of the existing storey and half 6-bedroom detached house; (b) construction of two storey and attic 6-bedroom detached house; (c) external and internal changes to the existing granny house; and (d) all ancillary site works

Shannon River House , Aghnahunshin , Rooskey

429m
2221CONDITIONAL21 Feb 2022

( involving alterations to that previously granted under Planning Ref. P19/115 ) for (a) demolition of the existing storey and half 6 bedroom detached house; (b) construction of two storey and attic 6 bedroom detached house; (c) external and internal changes to the existing granny house; (d) all ancillary site works

Shannon River House , Aghnahunshin , Rooskey

438m
19115CONDITIONAL23 May 2019

development consisting of (a) demolition of the existing storey and a half 6-bedroom detached house; (b) construction of two storey and attic 6-bedroom detached house; (c) external and internal changes to the existing granny house and (d) all ancillary works

Shannon River House , Aghnahunshin , Rooskey

443m
2460046CONDITIONAL13 Mar 2024

conversion of the existing attic room at first floor level to a recreation / music room ancillary to the enjoyment of the existing dwellinghouse including the provision of permanent stairs and 3 No. roof windows to the Front elevation of the dwellinghouse including all necessary alterations and associated ancillary works. 2.Retention permission is sought for alterations to the existing dwellinghouse and alterations to the site layout plan, with reference to previous Grant of Permission P.2445, as per drawings and documents lodged to Leitrim County council.

Aghnahunshin , Rooskey , Co. Leitrim

503m
2360133CONDITIONAL14 Sept 2023

as constructed of an existing single storey extension to the side of existing single storey type dwelling house together with the retention of an existing vehicular entrance to service this dwelling house

Tomisky , Roosky , Co. Longford

547m
2560043REFUSED13 Mar 2025

the proposed construction of a bungalow type dwelling house, garage, entrance, boundary fence/wall, connection to existing foul sewerage network mains and all ancillary site works

Tomisky , Bornacoola , Co. Longford

550m
2460045CONDITIONAL13 Mar 2024

(A) Retention of existing dwelling single storey type house as constructed; (B) Retention of existing 2 no. shed/garage type structures as constructed; (C) Retention of an existing vehicular entrance to service this dwelling house and all ancillary works

Tomisky , Bornacoola , Co. Longford

622m
1872N/A26 Apr 2018

development consisting of (a) the installation of 70m of floating mooring including a 6m length lower free-board for canoes and small boats, access gangway and service bollards providing lighting and water supply, and (b) Construction of a new access plinth and new access path. An Appropriate Assessment Screening and Ecological Impact Assessment has also been prepared in respect of the proposed development.

River Shannon , Gorteenoran , Roosky

663m
18281CONDITIONAL19 Dec 2018

development consisting of (a) the installation of 70m of floating mooring including a 6m length with lower free-board for canoes and small boats, access gangway and service bollards providing lighting and water supply. (b) construction of a new access plinth and new access path. A Natura Impact Statement and Ecological Impact Assessment has also been prepared in respect of the proposed development

River Shannon , Gorteenoran , Roosky

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?