The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

1926

CONDITIONAL

Offaly - Offaly County Council

Proposed Development

CONSTRUCTION OF 1 NO DWELLING, GARAGE, WASTE WATER TREATMENT SYSTEM AND ASSOCIATED POLISHING FILTER & ALL ASSOCIATED SITE WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Jan 2019

  2. Further information requested

    21 Mar 2019

  3. Further information received

    25 Mar 2019

  4. Decision: CONDITIONAL

    17 Apr 2019

  5. Decision due

    21 Apr 2019

  6. Grant issued

    29 May 2019

Application Details

Location
BALLYKILLEEN , HORSELEAP , CO OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
0.34 ha
Floor Area
246.6 sq m
Residential Units
1

Timeline

Registration Date
28 January 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 April 2019
Grant Date
29 May 2019
Permission Expires
28 May 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

391m
2560111CONDITIONAL4 Apr 2025

Construction of a four bedroom dwelling and garage. The application will also include an effluent treatment unit, percolation area, new domestic entrance and all associated site works and drainage

Ballykilleen , Horseleap , Co Offaly

546m
20196CONDITIONAL28 May 2020

THE DWELLING HOUSE AND GARAGE AS CONSTRUCTED (PREVIOUS PLANNING REFS:98-187 & 98-1043). PERMISSION IS ALSO BEING SOUGHT TO CONSTRUCT A SINGLE STOREY EXTENSION TO THE REAR AND SOUTH ELEVATION. IT IS ALSO PROPOSED TO CONVERT THE EXISTING STORAGE AREA IN THE ATTIC TO ADDITIONAL LIVING SPACE. THE APPLICATION WILL ALSO INCLUDE ALL ASSOCIATED SITE-WORKS, DRAINAGE AND MINOR CHANGES TO EXISTING HOUSE FINISHES

BALLYKILLEEN , CLARA , CO. OFFALY

881m
17184CONDITIONAL23 May 2017

CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE SIDE OF THE EXISTING DWELLING HOUSE, RELOCATION OF THE EXISTING FRONT AND BACK DOORS, ALTERATIONS TO THE EXISTING ELEVATIONS ALONG WITH ASSOCIATED INTERNAL ALTERATIONS AND EXTERNAL SITE WORKS

RUSSAGH , HORSELEAP , CO OFFALY

1.3km
18201CONDITIONAL4 May 2018

AN EXTENSION TO PROTECTED STRUCTURE, COMPRISING PROVISION OF ACCESSIBLE SHOWER-ROOM, RELOCATION OF BACK DOOR, ENLARGEMENT OF EAST GABLE PATIO-DOOR AND ADDITION OF VELUX WINDOWS TO 20TH CENTURY SIDE EXTENSION, THERMAL UPGRADE AND SUNDRY INTERNAL ALTERATIONS

WOODFIELD HOUSE , WOODFIELD (CURRAGHBOY) , CLARA CO OFFALY

1.3km
18161N/A10 Apr 2018

AN EXTENSION TO A PROTECTED STRUCTURE, COMPRISING AN ACCESSIBLE SHOWER-ROOM, THE RELOCATION OF THE BACK DOOR, ENLARGEMENT OF EAST GABLE PATIO-DOOR AND ADDITION OF VELUX WINDOWS TO 20TH CENTURY SIDE EXTENSION, THERMAL UPGRADES AND SUNDRY INTERNAL ALTERATIONS

WOODFIELD (CURRAGHBOY) , CLARA , CO OFFALY

1.4km
17476CONDITIONAL30 Nov 2017

THE CONSTRUCTION OF AN AGRICULTURAL SHED INCLUDING 2 NO. UNDERGROUND SLURRY TANKS, CATTLE PENS, CUBICLE AREA, BEDDED AREAS, CONCRETE APRONS AND ALL OTHER ASSOCIATED SITE WORKS

KILMALADY LITTLE TOWNLAND , HORSELEAP , CO. OFFALY

1.4km
1990CONDITIONAL4 Mar 2019

THE CONSTRUCTION OF AN AGRICULTURAL SHED INCLUDING AN UNDERGROUND SLURRY TANK, CATTLE PENS, BEDDED AREAS, CONCRETE APRON AND ALL OTHER ASSOCIATED SITE WORKS

KILMALADY LITTLE TOWNLAND , HORSELEAP , CO. OFFALY

1.6km
2360054CONDITIONAL8 Aug 2023

Construction of an extension to the north & west of existing dwelling. The application will also include the renovation of existing derelict dwelling, new biofilter treatment system to replace existing septic tank all associated site works and drainage

Curraghboy/Woodfield , Clara , Co. Offaly

1.7km
2560615REFUSED3 Dec 2025

• 4 no. playing pitches (Pitch 1 and 2: synthetic all-weather playing pitches with floodlighting, and Pitch 3 and 4: grass playing pitches); • 1 no. grass training/warm-up pitch;• A single level facilities building (approximately 865 sq m gross floor space) with rooftop photovoltaic solar panel array (224 sq m) and associated building signage (4.5 sq m), to incl. entrance lobby, function room with servery and reception area, office/meeting room, weight/training room, multipurpose community room, medical/first aid room with toilet, equipment store, 5 no. spectator toilets (3 no. universal accessible), circulation corridor, universal access toilet, universal access change room with shower and toilet, plant room, storage/kit room, 2 no. referee facilities with shower and toilet, 2 no. change rooms with showers and toilets, and 6 no. change rooms with toilets; • 123 no. vehicle parking spaces arranged in 2 no. car parking areas with site lighting (12 no. EV, 6 no. disabled, 105 no. regular), dedicated vehicle set down area, dedicated coach/bus set down area, and coach/bus parking area; and • Hard and soft landscaping (incl. enhanced boundary treatment planting and ecological buffer biodiversity corridors), access road and vehicle circulation, pedestrian walkways, site lighting, services (incl. tertiary waste water treatment system comprising of proprietary secondary wastewater treatment plant with pumped discharged to raised tertiary treatment modules polishing filter bed, and SuDS based surface water management system comprising permeable paving, grasscrete, a series of stormwater bioretention swales/detention basins located on the site, hydrocarbon interceptor, flow control hydrobrake controlled outflow discharge to drainage ditch within site, and ultimately the Gageborough River), and all other ancillary and associated site development works above and below ground level. Access will be via a new vehicular entrance from the L6045 Local Road with associated road upgrade works to accommodate development related traffic movements at this site of approximately 11 hectares

Townland of Curraghboy , or Woodfield , Clara Co. Offaly

1.7km
2560593N/A26 Nov 2025

development at this site of approximately 11 hectares located in the Townland of Curraghboy or Woodfield, Clara, Co. Offaly. The development will consist of: • 4 no. playing pitches (Pitch 1 and 2: synthetic all-weather playing pitches with floodlighting, and Pitch 3 and 4: grass playing pitches); • 1 no. grass training/warm-up pitch; • A single level facilities building (approximately 865 sq m gross floor space) with rooftop photovoltaic solar panel array (224 sq m) and associated building signage (4.5 sq m), to incl. entrance lobby, function room with servery and reception area, office/meeting room, weight/training room, multipurpose community room, medical/first aid room with toilet, equipment store, 5 no. spectator toilets (3 no. universal accessible), circulation corridor, universal access toilet, universal access change room with shower and toilet, plant room, storage/kit room, 2 no. referee facilities with shower and toilet, 2 no. change rooms with showers and toilets, and 6 no. change rooms with toilets; • 123 no. vehicle parking spaces arranged in 2 no. car parking areas with site lighting (12 no. EV, 6 no. disabled, 105 no. regular), dedicated vehicle set down area, dedicated coach/bus set down area, and coach/bus parking area; and• Hard and soft landscaping (incl. enhanced boundary treatment planting and ecological buffer biodiversity corridors), access road and vehicle circulation, pedestrian walkways, site lighting, services (incl. tertiary waste water treatment system comprising of proprietary secondary wastewater treatment plant with pumped discharged to raised tertiary treatment modules polishing filter bed, and SuDS based surface water management system comprising permeable paving, grasscrete, a series of stormwater bioretention swales/detention basins located on the site, hydrocarbon interceptor, flow control hydrobrake controlled outflow discharge to drainage ditch within site, and ultimately the Gageborough River), and all other ancillary and associated site development works above and below ground level. Access will be via a new vehicular entrance from the L6045 Local Road with associated road upgrade works to accommodate development related traffic movements

Townland of Curraghboy , or Woodfield , Clara Co. Offaly

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?