19288

CONDITIONAL

Carlow - Carlow County Council

Proposed Development

the construction of a two storey residential dwelling, detached garage, packaged wastewater treatment system and soil polishing filter, bored well and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Jul 2019

  2. Further information requested

    10 Sept 2019

  3. Further information received

    18 Jun 2020

  4. Decision: CONDITIONAL

    6 Jul 2020

  5. Decision due

    15 Jul 2020

  6. Grant issued

    10 Aug 2020

Application Details

Location
Straboe Lane , Killerig , Co. Carlow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Carlow County Council
Floor Area
198.03 sq m
Residential Units
2

Timeline

Registration Date
19 July 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
6 July 2020
Grant Date
10 August 2020
Permission Expires
9 August 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

355m
19370CONDITIONAL20 Sept 2019

to construct a part single, part two storey dwelling, garage, bored well, septic tank & percolation area, new domestic entrance and all associated site works

Straboe Lane , Killerig , Co Carlow

535m
2460355CONDITIONAL7 Nov 2024

Retention permission for a single storey extension to the front and side of existing two storey dwelling house and all associated site works

Straboe Lane , Killerig , Co. Carlow

580m
2460196REFUSED11 Jul 2024

a 10 year planning permission on lands including Straboe and Killerig, Carlow, Co. Carlow. The development will consist of permission for a Solar PV Energy Development with associated Battery Energy Storage System Compound with a total site area of c. 132.28ha, to include solar panels mounted on steel support structures, associated cabling and ducting, inverters, transformers, switchgear substations, auxiliary transformer, permanent storage containers, monitoring houses, composting toilet, BESS customer substation, battery blocks, BESS inverters and PCS (twin skid), BESS interface cabinets (BIC), backup generator, temporary construction compounds, tracks, boundary security fencing and security gates, CCTV, landscaping and ancillary works, with a 40year operational period. It is proposed that the Proposed Development will be accessed from four separate access points which will include (i) a new access created off the R726; (ii) a new entrance off Straboe Lane; (iii) a widened and improved existing entrance off Straboe lane; and (iv) use of an existing and previously consented entrance off the R418. A Natura Impact Statement (NIS) has been submitted to the Planning Authority with the Application

lands including Straboe and Killerrig , Carlow , Co. Carlow

580m
2460160N/A11 Jun 2024

the development will consist of permission for a Solar PV Energy Development with associated Battery Energy Storage System Compound with a total site area of c. 132.28ha, to include solar panels mounted on steel support structures, associated cabling and ducting, inverters, transformers, switchgear substations, auxiliary transformer, permanent storage containers, monitoring houses, composting toilet, BESS customer substation, battery blocks, BESS inverters and PCS (twin skid), BESS interface cabinets (BIC), backup generator, temporary construction compounds, tracks, boundary security fencing and security gates, CCTV, landscaping and ancillary works, with a 40year operational period. It is proposed that the Proposed Development will be accessed from four separate access points which will include (i) a new access created off the R726; (ii) a new entrance off Straboe Lane; (iii) a widened and improved existing entrance off Straboe lane; and (iv) use of an existing and previously consented entrance off the R418. A Natura Impact Statement (NIS) has been submitted to the Planning Authority with the Application

On lands including Straboe and , Killerrig , Carlow

797m
22393N/A18 Nov 2022

alteration and extension to existing dwelling and all associated site works

Straboe , Killerig , Co. Carlow

797m
2360007CONDITIONAL23 Jan 2023

alteration and extension to existing dwelling and all associated site works

Straboe , Killerig , Co. Carlow

1.1km
22290CONDITIONAL6 Sept 2022

for renovation and extension to existing dwelling and all associated site works

Straboe , Killerig , Co. Carlow

1.1km
2660091N/A31 Mar 2026

a proposed Solar Farm and Battery Energy Storage System. The development that will consist of: (i) Construction and operation solar PV panels on ground mounted steel supported structures with associated string inverters; (ii) Construction of a 50 MW Battery Energy Storage System (BESS) compound consisting of BESS units, integrated cabinets, spare parts containers, independent power producer (IPP) building (c. 64sqm) and security fencing (c. 2.6m in height); (iii) Installation of 13 no. transformer stations at various points across the site; (iv) Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical inverters/transformers; (v) Provision of 1 no. new site entrance from the L6003 and provision of 2 no. passing bays along the L6003; (vi) Provision of internal access tracks and watercourse/drain crossings, perimeter fencing, pole mounted CCTV cameras; (vii) 1 no. temporary construction compound; (viii) All associated site development, landscaping, drainage arrangements and ancillary works. The proposed solar farm development spans a total site area measuring c. 126.4ha, of which c. 61.3ha, the subject of this application, is located in Co. Carlow and c. 65.1ha is located in Co. Kildare. A separate planning application is being lodged with Kildare County Council. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of solar PV panels on the entire development, including Carlow and Kildare, is estimated to be c. 120MW. A Natura Impact Statement (NIS) has been prepared and was submitted as part of this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Straboe , Ballyhacket Lower and Ballycook , Co. Carlow

1.1km
19184REFUSED10 May 2019

a single storey bungalow, along with garage, incorporating a waste water treatment system and all associated site works

Straboe , Killerig , Co. Carlow

1.1km
19115N/A26 Mar 2019

for a single storey bungalow along with garage incorporating a waste water treatment system and all associated site works

Straboe , Kilerig , Co. Carlow