The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

19343

N/A

Sligo - Sligo County Council

Proposed Development

for development consisting of the construction of a dwelling house, construct domestic garage, install effluent treatment system with percolation area and to carry out all associated ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Aug 2019

  2. Application withdrawn

    26 Sept 2019

Application Details

Location
Rathglass , Enniscrone , Co. Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.4 ha
Floor Area
274.16 sq m
Residential Units
1

Timeline

Registration Date
19 August 2019
Status
WITHDRAWN
Decision
N/A
Withdrawn
26 September 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

18m
2360201CONDITIONAL3 Aug 2023

development consisting of the following: construct dwelling house, construct domestic garage, install effluent treatment system with percolation area and to carry out all associated ancillary site works

Rathglass , Enniscrone , Co. Sligo

315m
2660213N/A5 Jun 2026

to Retain: (1) the additional first-floor windows to the front elevation, (2) a ground floor front bay window, (3) the altered window configurations to northwest and southeast gables, (4) the location and design of the domestic garage and lean-to shed, (5) the revised entrance and driveway location, (6) the revised location and design of the raised percolation area and intermittent filter modules and, (7) the carrying out of all ancillary site works

Rathglass Td. , Enniscrone , Co. Sligo.

317m
2560307REFUSED25 Jul 2025

(1) Construction of a new detached dwelling house, (2) Domestic garage and (3) Proposed secondary treatment system and soil polishing filter with all associated site works

Attichree , , Co. Sligo

388m
2560216CONDITIONAL26 May 2025

intend to apply for planning permission for (1) the construction of a new waste water treatment system and percolation area (2) and all associated site works all at Rathglass, Enniscrone, County Sligo.

Rathglass , Enniscrone , Co Sligo

590m
197CONDITIONAL15 Jan 2019

Development consisting of construction of a 6 bay slatted cubicle shed (526 sq. m. plan floor area) with underground slurry storage tank, concrete apron and associated site works.

Attichree , Enniscrone , Co Sligo

665m
21289CONDITIONAL23 Jul 2021

Development consisting of the construction of a new detached dwelling house and domestic garage, together with effluent treatment system, percolation area and all associated site works

Attichree , Enniscrone , Co Sligo

668m
256CONDITIONAL28 Apr 2025

single storey dwelling house with roof/attic space accommodation, complete with separate garage, boundary fencing, septic system and percolation area, complete with all associated site works

Rathglass , Enniscrone , Co. Sligo

751m
2560234CONDITIONAL4 Jun 2025

CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING DWELLING, ALTERATIONS TO EXISTING WINDOWS/DOORS INCLUDING A NEW WINDOW TO THE REAR ELEVATION, THE REFURBISHMENT/EXTENSION OF AN EXISTING DERELICT OUTBUILDING INCLUDING ALTERATIONS TO THE EXISTING WINDOWS AND DOORS, TOGETHER WITH ALL ASSOCIATED ANCILLARY WORKS.

Fiddaun , Inniscrone , Sligo

1.1km
20388CONDITIONAL16 Nov 2020

Development consisting of the construction of a new single storey extension to the rear of the existing dwelling house together with all ancillary site works and services

Ballymoghany , Enniscrone , Co Sligo

1.2km
19128CONDITIONAL8 Apr 2019

Development consisting of construction of a storage shed and slatted cubicle shed with underground slurry storage tank along with all associated site works.

Ballymoghany , Enniscrone , Co. Sligo

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?