1938264
CONDITIONALCork - Cork City Council
Proposed Development
Permission for the conversion of an existing storage and office building to 1 no. dwelling house and all associated ancillary development works including access, parking, landscaping and private amenity area at Boherboy Road, Lotabeg, Mayfield, Cork.
View the full application file on the council's planning portal →Application Timeline
Application received
19 Feb 2019
Decision: CONDITIONAL
19 Jun 2019
Decision due
24 Jun 2019
Grant issued
30 Jul 2019
Application Details
- Location
- Boherboy Road , Lotabeg , Mayfield
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork City Council
Timeline
- Registration Date
- 19 February 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 June 2019
- Grant Date
- 30 July 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
permission to convert existing vacant cold store to dormer type domestic dwelling and all ancillary works
Boherboy Road , Lotabeg , Mayfield
Permission to demolish existing kitchen and outhouse and construct a rear two storey and ground floor side extension with a dry dash finish to the entire dwelling and all associated site works at No.12 Lotabeg Terrace, Mayfield.
No.12 Lotabeg Terrace , Mayfield , Cork
permission for the construction of a 3-storey apartment building consisting of 15 no. residential units and all ancillary site development works. The proposed development consists of 4 no. 1 bedroom apartments, 6 no 2-bedroom apartments, 4 no. 2-bedroom duplex apartments and 1 no. 2-bedroom maisonette. Ancillary site works to include provision of car parking spaces, communal open space landscaping, bin enclosure and covered bike stands. Access to the site will be via a new entrance to Boherboy Road.
Boherboy Road , and North Ring Road , Mayfield
Permission for the construction of a single storey,1 bedroom residential dwelling and all ancillary site development works
Silverheights Road and North Ring Road , Mayfield , Cork
Permission to construct a single storey residential dwelling and all associated site works.
Silverheights Road and , North Ring Road , Mayfield
Permission is sought for the removal of an existing window on the front façade (east elevation) and replace with a cash ATM and surround with all associated site works.
Our Lady Crowned Credit Union Ltd. , 11C Silversprings Road , Mayfield
Permission for development at Our Lady Crowned Credit Union, 11C Silversprings Road, Mayfield, Cork. The development will consist of the alteration and extension of the existing credit union building comprising new ground floor extension on eastern elevation to provide lobby and ATM/ Express Lodgment space; demolition of existing bay window on eastern elevation at first floor level and construction of replacement bay window; alterations to door and window opes on western, southern and northern elevations; internal alterations comprising reconfiguration of banking hall, office and other support spaces and provision of new lift and disabled toilet. The proposed development includes amendments and extension to the existing car parking layout to improve access and circulation, and all ancillary site development, including drainage and landscaping works.
Our Lady Crowned Credit Union , 11C Silversprings Road , Mayfield
Permission for development at 14 Silverheights Avenue, Mayfield, Cork. The development will consist of modifications and extension to the existing dwelling house, namely; (A) Removal of existing 12.01sq.m/129.27sq.ft. single-storey extension to the rear of the existing dwelling, (B) Removal of existing 16.26sq.m./175.02 sq.ft. single-storey attached garage to the side of existing dwelling, (C) Construction of a 67.17 sq.m./723.01 sq.ft. single-storey extension to the rear and side of the existing dwelling, (D) Construction of a 13.00 sq.m. /139.93 sq.ft. single-storey detached domestic garage, (E) Upgrading and widening of existing entrance, and (F) All ancillary works.
14 Silverheights Avenue , Mayfield , Cork
Permission to convert existing attic space of single storey dwelling to habitable accommodation, with new rooflights to front and rear elevations, dormer window to rear elevation and all ancillary site development works
7 Wilmar , Shamrock Park (Silversprings Road) , Mayfield
permission for retention is sought for three velux windows on front elevations
18 Byefield Park , Mayfield , Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?