← Back to search

NO. 4 Cuirt Cheirin , Circular Road , Galway

CONDITIONAL

Planning application 1939

Galway - Galway City Council

Proposed Development

Permission for development which consists of the addition of roof lights to the front of proposed dwelling (previously granted planning permission under planning applications Ref No. 16/18 and 14/240) including all associated services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Feb 2019

  2. Decision due

    11 Apr 2019

  3. Decision: CONDITIONAL

    11 Apr 2019

  4. Grant issued

    23 May 2019

Application Details

Location
NO. 4 Cuirt Cheirin , Circular Road , Galway
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Galway City Council
Site Area
0.165 ha
Floor Area
100 sq m
Residential Units
1

Timeline

Registration Date
15 February 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
11 April 2019
Grant Date
23 May 2019
Permission Expires
22 May 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

54m
18367CONDITIONAL14 Nov 2018

Permission for: (1) change of house plan & all associated site works (Previously approved under GCC Planning Reference 14/240 & An Bord Pleanála Reference PL 61.221622) and (2) Permission to construct a domestic garage on a serviced site

No 5 Cúirt Cheirin , Circular Road , Galway

63m
2364CONDITIONAL20 Mar 2023

Permission for development which consists of (A) Change of house design, previously granted under planning file references 06/322, 07/933, 14/240 and extended under planning duration extension file reference number 19/351(14/240) to construction of a two-storey dormer type dwelling. (B) Construction of a single storey domestic garage with storage loft. (C) Provision of solar panels on the rood of the proposed garage and on the stand-alone racking system in the rear garden. (D) All associated building works and site works

Site 11 Cuirt Cheirin , Circular Road , Galway

70m
2560050CONDITIONAL20 Feb 2025

Permission for development which consists of: Patrick Joe and Phil Kearns are applying to Galway City Council for permission to construct 3 no. detached dwellings at Circular Road, Galway. The Permission sought includes an access road/driveway and street carparking with all associated site services & landscaping including amendments to the existing road access.”

Circular Road , Galway , Galway City

79m
19351UNCONDITIONAL17 Dec 2019

EOD 14/240 Permission for the construction of 24 No. detached 1½ storey dwellinghouses on existing serviced sites (as previously permitted under Pl. Ref. Nos. 06/322 and 07/933

Sites 7 & 11 , Cuirt Cheirin , Circular Road

94m
17268CONDITIONAL15 Sept 2017

Permission for (1) change of house plan (previously approved under planning reg. ref. no. 14/240 and An Bord Pleanala Ref. no. Pl 61.221622) and (2) permission to erect domestic garage

6 Cuirt Cheirin , Circular Road , Dangan Upper

105m
18154CONDITIONAL11 May 2018

Permission for retention for basement extension and alterations to dwelling house, studio building and wood pellet fuel store with all associated works and ancillary services

Upper Dangan , Circular Road , Galway

116m
2660101CONDITIONAL25 Mar 2026

Permission for development which consists of; subdivision of residential site to construct two detached houses with detached garages and additional driveway access

No 7 Cuirt Cherin , Circular Road , Galway

150m
18361CONDITIONAL9 Nov 2018

Permission for an extension and alterations to studio building with all associated works and ancillary services

Upper Dangan , Circular Road , Galway

153m
22222CONDITIONAL5 Aug 2022

Permission for development which consists of proposed new rooflights ; retention of existing rooflights and façade variations; proposed use of existing garden shed as home office

1 The Heath , Circular Road , Galway

175m
2660270N/A27 Jul 2026

Permission for development which consists of: the development will consist of the construction of a new two-storey, four-bedroom detached dwelling house; a covered carport; a single-storey garden studio to the rear, ancillary to the use of the main dwelling; a new vehicular entrance onto Kearn's Lane; connection to the public watermain and public foul sewer; on-site surface-water drainage incorporating sustainable drainage measures (SuDS); landscaping, boundary treatments and all associated site development works

Dangan Upper , Circular Road , Galway

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?