The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

19413

CONDITIONAL

Carlow - Carlow County Council

Proposed Development

for the construction of a residential dwelling, including rooflights and a detached domestic garage. Other works as part of the development include: septic tank and percolation area; soakway; borehole well; vehicular entrance; landscaping; boundary treatment and all associated site works to facilitate the development.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Oct 2019

  2. Decision due

    10 Dec 2019

  3. Decision: CONDITIONAL

    10 Dec 2019

  4. Grant issued

    21 Jan 2020

Application Details

Location
Oldtown , Nurney , Co. Carlow
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Carlow County Council
Floor Area
254 sq m
Residential Units
2

Timeline

Registration Date
16 October 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 December 2019
Grant Date
21 January 2020
Permission Expires
20 January 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

53m
20409CONDITIONAL20 Nov 2020

Construction of a residential dwelling; and a detached domestic garage. Other works as part of the development include: on-site EPA compliant wastewater treatment system and percolation area; soakaways; borehole well; vehicular entrance; landscaping; boundary treatment; and all associated works to facilitate the development.

Oldtown , Nurney , Co. Carlow

218m
18207CONDITIONAL24 May 2018

the construction of a new 2 storey detached dwelling, new site entrance, boundary treatments, on-site treatment system and all ancillary site works.

Oldtown , Nurney , Co. Carlow

218m
1926N/A5 Feb 2019

amendments to originally granted planning permission PL Ref: 18/207 (which consisted of the construction of a new 2 storey detached dwelling, new site entrance, boundary treatments, on-site treatment system and all ancillary site works). The proposed amendments consist of changes in setting out and site levels

Oldtown , Nurney , Co. Carlow

218m
1976CONDITIONAL26 Feb 2019

for amendments to originally granted planning permission PL18/207 (which consisted of the construction of a new 2 storey detached dwelling, new site entrance, boundary treatments, on-site treatment system and all ancillary site works). The proposed amendments consist of changes in setting out and site levels

Oldtown , Nurney , Co. Carlow

433m
2560380CONDITIONAL20 Nov 2025

as-built extensions to side of existing dwelling. Planning permission is sought for the construction of a single storey extension to side and rear of same dwelling, revisions to front elevation, upgrade of on-site wastewater treatment system and all associated site works

Oldtown , Nurney , Co. Carlow

460m
2560187CONDITIONAL30 Jun 2025

the construction of a dairy washings tank, a straw bale shed and associated site works

Oldtown , Nurney , Co. Carlow

519m
2285CONDITIONAL7 Mar 2022

for the development of a dry store, concrete yard and ancillary works at this site

Oldtown House , Oldtown , Nurney

714m
19328CONDITIONAL23 Aug 2019

of a partially complete domestic shed as built. Planning permission for the completion of same shed and for all other associated ancillary site development works

Garryhundon , Milford , Co. Carlow

1.0km
20109CONDITIONAL26 Mar 2020

to construct a two storey dwelling house, garage, septic tank and associated percolation area, bored well, new site entrance off existing private laneway, all ancillary site works

Garryhundon , Milford , Co. Carlow

1.0km
20192CONDITIONAL18 Jun 2020

the temporary placement of a mobile home on site for the duration of the construction of dwelling house as granted under PL Ref. 19/491 and temporarily connect to services as granted under same, all ancillary site works at services

Garryhundon , Milford , Co. Carlow

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?