The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

194152

N/A

Cork - Cork City Council

Proposed Development

1. Alterations to existing windows on the North and West Elevations and create new door, 2. Install new porthole type first floor window on the North gable, 3. Install two new velux roof lights and modify entrance porch on North Elevation, 4. Install two new velux roof lights and entrance door on South Elevation, 5. Replace all existing PVC windows, doors and frames with new units, 6. Carry out all associated site works, 7. Retention of existing first floor balcony, stairs and access doors on the Western gable.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Jan 2019

  2. Decision due

    21 Mar 2019

Application Details

Location
Three Gables , Lehenagh More , Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork City Council

Timeline

Registration Date
25 January 2019
Status
INCOMPLETED APPLICATION
Decision
N/A
Decision Due
21 March 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
194375CONDITIONAL18 Feb 2019

Works will consist of: 1. Alterations to existing windows on the north and west elevations and create new door. 2. Install new porthole type first floor window on the north gable. 3. Install two new velux roof lights and modify entrance porch on north elevation. 4. Install two new velux roof lights and entrance door on south elevation. 5. Replace all existing PVC windows, doors and frames with new units. 6. Carry out all associated site works. 7. Retention is also sought for existing first floor balcony, stairs and access doors on the western gable.

Three Gables , Lehenagh More , Co. Cork

143m
2543579REFUSED17 Jan 2025

Permission for the construction of a new two storey dwelling, new vehicular entrance and all associated site works

Lehenagh More , Togher , Cork

143m
2443501N/A13 Dec 2024

Permission for the construction of a new two storey dwelling, new vehicular entrance and all associated site works

Lehenagh More , Togher , Cork

143m
2442744REFUSED8 Mar 2024

Permission for the construction of a 4-bed two-storey dwelling and attached domestic garage, wastewater treatment system, new vehicular entrance and all associated site works.

Lehenagh More , Togher , Cork

158m
176352CONDITIONAL12 Sept 2017

A storey and a half extension (including a first floor) and changes to elevations to existing dwelling.

Lehenagh Cottage , Lehenagh More , Togher

193m
2039438CONDITIONAL31 Jul 2020

Permission...for the replacement of approximately 127m of existing 2.4m high chainlink fencing and associated gates with 127m of new 2.4m high green palisade security fencing/gates and all associated site works at an existing above ground Natural Gas Installation.

Lehenaghmore AGI , Lehenagh More , Cork City

391m
174223CONDITIONAL3 Feb 2017

The construction of a single storey lawn bowls pavilion along with relocation of lawn bowls green and associated siteworks

Leghenamore Park , Leghenagh More , Togher

613m
184082CONDITIONAL16 Jan 2018

Construction of a cattle underpass and effluent holding tank under the public road and associated works.

Ashgrove , Gortagoulane , Togher

614m
177085N/A28 Nov 2017

Construction of a cattle underpass and effluent holding tank under public road and associated works.

Ashgrove , Gortagoulane Togher , Co. Cork

614m
177281N/A15 Dec 2017

The construction of a cattle underpass and effluent holding tank under the public road and associated works

Ashgrove , Togher , Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?