19418

N/A

Clare - Clare County Council

Proposed Development

to construct a 20 metre high free standing monopole communication structure and its associated antennae communication dishes and ground equipment, within a 2.4m high palisade fence compound at ESB's Kilkee 38kV substation

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 May 2019

  2. Further information requested

    17 Jul 2019

  3. Application withdrawn

    11 Feb 2020

Application Details

Location
Kilrush Road , Dough , Co. Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council

Timeline

Registration Date
24 May 2019
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
11 February 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

133m
17874CONDITIONAL16 Nov 2017

to RETAIN mobile home to rear of existing Garage/Filling station for use as a temporary managers/security accommodation with connection to existing services, plus all ancillary site works

Dough , Kilrush Road , Kilkee

226m
18812CONDITIONAL16 Oct 2018

to construct an extension to the existing clubhouse building to consist of a new main entrance, referees room, gym and storage facilities, along with all associated site works

Kilrush Road , Dough , Kilkee

252m
22563REFUSED27 Jun 2022

for development at a 1.33 hectare site at Dough, Kilkee, Co Clare, located north of Moonin Estate. The development will consist of a Caravan Park together with all associated and ancillary works including site access from an unnamed road to the south, site services, boundary treatment, landscaping and visitor amenities in a single storey block on the site

Dough , Kilkee , Co Clare

252m
2460003N/A3 Jan 2024

for development at a 1.35 hectare site at Dough Kilkee Co Clare located North of Moonin Estate. The site is accessed from an unnamed local road to the south of the site. The development will consist of: a) Construction of 38 no. 2 storey dwellings consisting of 28 no. 3-bed and 10 no. 2-bed houses. Semi-detached and terraced dwellings are proposed. b) Provision of a new vehicular and pedestrian entrance to the south; c) Provision of footpath to northern side of the local road along the site’s southern boundary; and d) All associated site clearance & development works, provision of internal access road and potential future connections to neighbouring sites, public open space, relocated and upgraded pumping station, drainage and hard & soft landscaping, car and bike parking, bin storage, and all other ancillary works.

Dough , Kilkee , Co. Clare

252m
23603N/A1 Dec 2023

for development at a 1.33 hectare site at Dough Kilkee, Co Clare, located north of Moonin estate. The site is accessed from an unnamed local road to the south of the site. the development will consist of: a) Construction of 38 no. 2 storey dwellings consisting of 28 no 3-bed and 10 no. 2-bed houses. Semi-detached and terraced dwellings are proposed. b) Provision of a new vehicular and pedestrian entrance to the south; c) Provision of footpath to northern side of the local road along the site's southern boundary; and d) All associated site clearance and development works, provision of internal access road and potential future connections to neighbouring sites, public open space, relocated and upgraded pumping station, drainage and hard and soft landscaping, car and bike parking, bin storage, and all other ancillary works

Dough , Kilkee , Co Clare

253m
211343REFUSED17 Dec 2021

for development at a 1.33 hectare site at Dough, Kilkee, Co Clare located north of Moonin estate. The development will consist of a Caravan Park / Camp Site / Motor Home Park (Tourist uses) / Glamping Use together with all associated ancillary works including site access from an unnamed road to the south, site services, boundary treatment, landscaping, and visitor amenities in a single storey block on the site.

Dough , Kilkee , Co Clare

266m
17387CONDITIONAL22 May 2017

to alter existing dwelling along with associated site works. The works involve a) converting the existing garage, contained within the dwelling structure, into a bedroom. b) to construct a new front porch c) to alter the front, right side and rear elevations by replacing/installing new windows and doors d) to alter the internal floor layout of the existing dwelling e) to construct a new front boundary wall.

Circular Rd , Kilkee , Co Clare

271m
2560446CONDITIONAL17 Jul 2025

for the following development (a) to change the use of part of the existing building from hair salon to private residential; (b) to demolish the existing rear extension; (c) to construct a new rear extension; (d) to make elevational changes to the existing building; (e ) all associated siteworks and services

Circular Road , Kilkee , Co. Clare

271m
2660478N/A23 Jul 2026

to demolish the existing sub-standard dwelling house and to construct a replacement dwelling house along with all associated site works and services

Circular Road , Kilkee , Co. Clare

290m
17509UNCONDITIONAL28 Jun 2017

to Extend the Appropriate Period of Planning Permission P12-229 for a new dwelling house with all necessary ancillary services

Circular Road , Dough , Kilkee

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection