19441
CONDITIONALClare - Clare County Council
Proposed Development
for the following development which will consist of (1) full planning permission for a change of use of the previously granted extension ( ref P17-499 ) from storage to industrial, (2) full planning permission for new boundary fencing and gates, (3) RETENTION of planning permission of an additional factory extension ( 409m2) to the previously granted extension ( ref P17-499), (4) RETENTION of planning permission of a new ( 1252m2) external yard area, (5) RETENTION of planning permission of the demolition of existing external sheds, (6) RETENTION of planning permission of fenestration changes from the previously granted extension ( ref P17-499), and all associated civil, site development, site services and landscaping works
View the full application file on the council's planning portal →Application Timeline
Application received
31 May 2019
Further information requested
22 Jul 2019
Further information received
3 Oct 2019
Decision due
7 Nov 2019
Decision: CONDITIONAL
7 Nov 2019
Grant issued
8 Dec 2019
Application Details
- Location
- Shannon Industrial Estate , Caherteige , Shannon
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Clare County Council
Timeline
- Registration Date
- 31 May 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 7 November 2019
- Grant Date
- 8 December 2019
- Permission Expires
- 7 December 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for development at Precision Engineering Ltd., Block O109, Shannon Industrial Estate, Shannon, Co. Clare. The development will consist of proposed roof-mounted photovoltaic, PV, panels on the existing profiled metal roof and all associated siteworks
Shannon Industrial Estate , Shannon , Co. Clare
to remove a temporary structure and to construct an extension to its existing facility in order to create additional storage and office space
Shannon Industrial Estate , Caherteige , Shannon
for the installation of smart traffic lights and pedestrian crossings with all associated site works, at the four-way junction between Blocks N, O, Q & P
Airport Avenue , Shannon Free Zone , Shannon Co Clare
to extend existing industrial unit into adjoining unit ( unit No. 118A), the change of use of this unit from gymnasium to industrial use, the construction of new common front entrance lobby and conversion of existing first floor flat roofed area to new open seated balcony area at existing units Nos. 118 and 118A
Units Nos 118 and 118A , Shannon Industrial Estate , Shannon
for development which will consist of a rear extension to the existing warehouse storage area including all ancillary site works
Bays 103 and 104 , Shannon Industrial Estate , Shannon
for development which will consist of a rear extension to the existing warehouse storage area, including all ancillary site works.
Bays 103 and 104 , Shannon Industrial Estate , Shannon
for development which will consist of the provision of, overall c.521 Sq. M. or 145. kWp output of roof mounted Solar PV array. A glint and glare assessment will be submitted with the application
Bay 104 Shannon Industrial Estate , Shannon , Co Clare
for an extension to the existing metal fabrication workshop together with all ancillary works. A Natura Impact Statement (NIS) will be lodged as part of this application
Block N Bay 114-115 , Shannon Free Zone Shannon , Co. Clare
for the construction of works to include, reconfiguration of the existing South West elevation to provide an external canopy, signage on the building, roof level plant enclosure, a new pedestrian door to northwest elevation and a single storey switchroom and substation to rear of building in the yard space with all associated site works
Shannon Free Zone , Shannon , Co Clare
to construct a first floor extension to the existing ground floor offices on the Front Elevation of Bay 102,
Shannon Industrial Estate , Shannon , Co Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?