194500
N/ACork - Cork City Council
Proposed Development
The development of 1no. single storey CNG (compressed natural gas) compressor installation with a floor area of 23m2, 1no. covered shelter with a floor area of 12m2 and 57m of 2.9m high boundary wall and associated ground works.
View the full application file on the council's planning portal →Application Timeline
Application received
1 Mar 2019
Decision due
25 Apr 2019
Application Details
- Location
- Kinsale Road Industrial Estate , Kinsale Road Curraghconway , Ballyphehane
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork City Council
Timeline
- Registration Date
- 1 March 2019
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
- Decision Due
- 25 April 2019
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development of 1no single storey CNG (compressed natural gas) compressor installation with a floor area of 21m2, 1no covered shelter with a floor area of 12m2 and 57m of 2.9m high boundary wall and associated ground works.
Kinsale Road Industrial Estate , Kinsale Road , Curraghconway
Permission for development at this site Unit 5, 15, and 18 Kinsale Road Industrial Estate, Kinsale Road, Cork, for: The change of use of the unit 5, 15 and 18 (which is a single unit), from light industrial to a warehouse with ancillary trade counters (for the sale of building related products principally to trade). The application also includes the inclusion of trade counters; mechanical plant; and signage. All ancillary and other minor works to facilitate the development.
Unit 5 15 and 18 , Kinsale Road Industrial Estate , Kinsale Road
The development will comprise of one no. light industrial/warehouse building (5459 sqm) (capable of subdivision up to three no. units) including ancillary office space, car parking, 10m high site signage substation and associated site works. The proposed building will be capable of accommodating warehousing/distribution (logistics)/light industrial.
Progressive Commercial Construction Ltd , Blackash Road , Curraghconway
The development will comprise of one no. light industrial/warehouse building (5459 sqm) (capable of subdivision upto three no. units) including ancillary office space, car parking, 10m high site signage substation and associated site works. The proposed building will be capable of accommodating warehousing/distribution (logistics)/light industrial.
Blackash Road , Curraghconway , South Link Road
A part single-storey, part two-storey building (c. 4,378m2 in area) with ancillary workshop and offices. The building is to be constructed in two phases, with Phase 1 comprising part single-storey, part two-storey building (c. 1,929m2) to be used for the hire and sale of plant and/ or machinery and/or tools; and Phase 2 comprising a single-storey building to be used as a warehouse (c.2449m2). The proposed development also includes an external yard for the storage of plant/machinery; palisade fence/wall to boundaries; signage, including stand-alone totem sign; car parking; replacement new access from Blackash Road; and all associated site development, drainage and landscaping works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Blackash Road , Curraghconway , South Link Road
A part single-storey, part two-storey building (c. 4,378m2 in area) with ancillary workshop and offices. The building is to be constructed in two phases, with Phase 1 comprising part single-storey, part two-storey building (c. 1,929m2) to be used for the hire and sale of plant and/ or machinery and/or tools; and Phase 2 comprising a single-storey building to be used as a warehouse (c.2449m2). The proposed development also includes an external yard for the storage of plant/machinery; palisade fence/wall to boundaries; signage, including stand-alone totem sign; car parking; replacement new access from Blackash Road; and all associated site development, drainage and landscaping works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Blackash Road , Curraghconway , South Link Road
The development will consist of a Roof Mounted Solar PV Array of 1107 number PV Panels (c. 2400m2) and all associated works, on the roofs of our offices and factory
Kinsale Road , Cork City , T12K7XR
Permission is sought for the construction of an 8m high clad structure to house 2 no. fabric filtration units with an adjacent 16m high stack which are all relocating from elsewhere on the site and all ancillary works.
Irish Pioneer Works LTD , Kinsale Road , Cork
Construction of a first floor extension and changes to the elevations of ground floor store.
Unit 30-32 , Kinsale Road Commercial Centre , Ballycurreen Kinsale Road
Construction of first-floor extension to provide an office at existing carpet retail store, alterations to elevations and signage
Unit 30-32 , Kinsale Road Commercial Centre , Ballycurreen Kinsale Road
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?