1950178
CONDITIONALDonegal - Donegal County Council
Proposed Development
(1) RETENTION OF A STRAW STORAGE AGRICULTURAL SHED WITHIN THE EXISTING FARMYARD COMPLEX AND (2) DEMOLITION OF AN OUTHOUSE, CONSTRUCTION OF AN AGRICULTURAL DRY BEDDED/SLATTED CALF SHED WITH UNDERGROUND SLURRY STORAGE TANK TO THE SIDE AND REAR OF AN EXISTING STRAW STORAGE SHED WITH ALL ASSOCIATED SITE WORKS WITHIN THE EXISTING FARMYARD COMPLEX
View the full application file on the council's planning portal →Application Timeline
Application received
13 Feb 2019
Decision: CONDITIONAL
4 Apr 2019
Decision due
9 Apr 2019
Grant issued
8 May 2019
Application Details
- Location
- BALLYLIN , RAMELTON , LETTERKENNY PO
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Donegal County Council
- Site Area
- 0.505 ha
Timeline
- Registration Date
- 13 February 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 4 April 2019
- Grant Date
- 8 May 2019
- Permission Expires
- 7 May 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCTION OF A DWELLING HOUSE WITH DETACHED DOMESTIC GARAGE AND SEPTIC TANK WITH PERCOLATION AREA
BALLYLIN , RAMELTON , CO DONEGAL
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
BALLYLIN , RAMELTON , LETTERKENNY PO
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
BALLYLIN , RAMELTON , LETTERKENNY PO
CHANGE OF HOUSE DESIGN FOR DWELLING HOUSE PREVIOUSLY PERMITTED UNDER PLAN. REG. REF. NO. 21/52022
BALLYLIN , RAMELTON , LETTERKENNY PO
CONSTRUCTION OF A NEW DWELLING, DOMESTIC GARAGE, SEWAGE TREATMENT SYSTEM & ANCILLARY SITE WORKS
BALLYLIN , RAMELTON , LETTERKENNY PO
CONSTRUCTION OF A NEW DWELLING, DOMESTIC GARAGE, SEWAGE TREATMENT SYSTEM & ANCILLARY SITE WORKS
BALLYLIN , RAMELTON , LETTERKENNY PO
ERECTION OF 260M2 OF PHOTOVOLTAIC SOLAR PANELS AT GROUND LEVEL AT THE REAR OF THE OAKWELL HOLIDAY VILLAGE SITE AND ANCILLARY SITE WORKS
BALLYLIN , RAMELTON , LETTERKENNY PO
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
BALLYLIN , RAMELTON , LETTERKENNY PO
CONSTRUCTION OF RURAL TOURIST ACCOMMODATION IN ACCORDANCE WITH THE DEPARTMENT OF HOUSING, PLANNING, COMMUNITY AND LOCAL GOVERNMENTS RURAL DEVELOPMENT PROGRAMME (LEADER) 2014-2020, THEME 1; COMPRISING COMMUNAL KITCHEN/DINING AREA IN CONVERTED STONE BUILDING, TIMBER FRAME COMMUNAL SHOWER/SERVICES BLOCK, 6 BEDROOM & 2 NO. 2 BEDROOM TIMBER FRAME BLOCKS, 2 BEDROOM BLOCK IN CONVERTED STONE BUILDING, 2 NO. SHEPHERD HUT ACCOMMODATION UNITS, SPA RECEPTION UNIT, STAND-ALONE HOT TUB, SAUNA BLOCK AND 4 NO. DESIGNATED SINGLE TENT CAMPING AREAS
BALLYLIN , RAMELTON , LETTERKENNY PO
CONSTRUCTION OF 6 ADDITIONAL TIMBER LOG CABIN STYLE ACCOMMODATION UNITS TO THE OAKWELL HOLIDAY VILLAGE, CHILDRENS PLAY AND ADULT SEATING AREAS, WASTEWATER TREATMENT PLANT, EXTENSION TO EXISTING PERCOLATION AREA AND ANCILLARY SITE SERVICES
BALLYLIN , RAMELTON , LETTERKENNY PO
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?