1950357

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

CONSTRUCTION OF A 6MW BATTERY ENERGY STORAGE SYSTEM (BESS) PROVIDED WITHIN A COMPOUND AREA CONSISTING OF ASSOCIATED PLANT, EQUIPMENT AND BUILDINGS INCLUDING : 2 NO. BESS CONTAINER BUILDINGS OF 2.6M IN HEIGHT, 12.2M IN LENGTH AND 2.5M IN WIDTH, 2 NO. TRANSFORMERS (EQUIPMENT) OF 2.5M IN HEIGHT, 2M IN LENGTH AND 2M IN WIDTH; A GRP SWITCHGEAR KIOSK (PLANT) OF 4.1M IN HEIGHT, 5.5M IN LENGTH AND 5.5M IN WIDTH; COMPOUND MESH FENCE OF 2.75M IN HEIGHT; AREA OF HARDSTANDING; 50M UNDERGROUND CABLE CONNECTING THE DEVELOPMENT TO THE EXISTING WINDFARM SUBSTATION; AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS TO FACILITATE THE DEVELOPMENT. ACCESS TO THE SITE WILL BE VIA THE EXISTING BARNESMORE WINDFARM PRIVATE LANEWAY WHICH ACCESSES ONTO THE LOCAL ROAD (L20151-1) WITHIN THE EXISTING BARNESMORE WINDFARM SITE

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Mar 2019

  2. Decision: CONDITIONAL

    10 May 2019

  3. Decision due

    13 May 2019

  4. Grant issued

    12 Jun 2019

Application Details

Location
CULLIONBUOY , BARNESMORE , DONEGAL PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
4.962 ha

Timeline

Registration Date
19 March 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
10 May 2019
Grant Date
12 June 2019
Permission Expires
11 June 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1.3km
2051040N/A31 Jul 2020

UPGRADING OF EXISTING INFRASTRUCTURE TO PROVIDE AN EXTERNAL TRANSFORMER AT TURBINE NO.22 AT THE EXISTING BARNESMORE WINDFARM SITE, THE DEVELOPMENT WILL CONSIST OF UPGRADING OF EXISTING INFRASTRUCTURE INCLUDING A GRP TRANSFORMER ENCLOSURE HOUSING, TRANSFORMER EQUIPMENT, TRANSFORMER PLINTH AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS. THE PROPOSED TRANSFORMER ENCLOSURE WILL BE 2 METRES IN HEIGHT, 3.55 METRES IN LENGTH AND 2.44 METRES IN WIDTH. THE TRANSFORMER ENCLOSURE WILL BE LOCATED ON A NEW TRANSFORMER CONCRETE PLINTH ON THE EXISTING WIND TURBINE HARD STAND AREA. DUCTING WILL BE INSTALLED BETWEEN THE PROPOSED PLINTH AND THE EXISTING TURBINE

BARNESMORE WINDFARM SITE , CULLIONBUOY , CLOGHER BARNESMORE

1.3km
2051295CONDITIONAL15 Sept 2020

UPGRADING OF EXISTING INFRASTRUCTURE INCLUDING A GRP TRANSFORMER ENCLOSURE HOUSING TRANSFORMER EQUIPMENT, TRANSFORMER PLINTH AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS TO FACILITATE THE DEVELOPMENT. THE PROPOSED TRANSFORMER ENCLOSURE WILL BE 2 METRES IN HEIGHT, 3.55 METRES IN LENGTH AND 2.44 METRES IN WIDTH. THE TRANSFORMER ENCLOSURE WILL BE LOCATED ON A NEW TRANSFORMER CONCRETE PLINTH ON THE EXISTING WIND TURBINE HARD STAND AREA. DUCTING WILL BE INSTALLED BETWEEN THE PROPOSED PLINTH AND THE EXISTING TURBINE

BARNESMORE WINDFARM SITE , CULLIONBUOY , BARNESMORE

1.3km
2050935N/A14 Jul 2020

UPGRADING OF EXISTING INFRASTRUCTURE TO PROVIDE AN EXTERNAL TRANSFORMER AT TURBINE NO.22 AT THE EXISTING BARNESMORE WINDFARM SITE, THE DEVELOPMENT WILL CONSIST OF UPGRADING OF EXISTING INFRASTRUCTURE INCLUDING A GRP TRANSFORMER ENCLOSURE HOUSING TRANSFORMER EQUIPMENT, TRANSFORMER PLINTH AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS. THE PROPOSED TRANSFORMER ENCLOSURE WILL BE 2 METRES IN HEIGHT, 3.55 METRES IN LENGTH AND 2.44 METRES IN WIDTH. THE TRANSFORMER ENCLOSURE WILL BE LOCATED ON A NEW TRANSFORMER CONCRETE PLINTH ON THE EXISTING WIND TURBINE HARD STAND AREA. DUCTING WILL BE INSTALLED BETWEEN THE PROPOSED PLINTH AND THE EXISTING TURBINE

BARNESMORE WINDFARM SITE , KEADOW UPPER , CLOGHER BARNESMORE

1.9km
1951446CONDITIONAL23 Sept 2019

DEVELOPMENT OF A MODULAR BATTERY ENERGY STORAGE SYSTEM (BESS) FACILITY FOR A PERIOD OF 10 YEARS CONSISTING OF UP TO 27 NO. BATTERY STORAGE MODULES (UP TO 14M LENGTH, 2.44M WIDE AND 2.9M HIGH) AND ANCILLARY EQUIPMENT INCLUDING UP TO 27 NO. TRANSFORMERS (UP TO 2.5M LENGTH, 2.5M WIDE AND 2.9M HIGH), 27 NO. POWER CONDITIONING UNIT BLOCK AREAS (UP TO 8.0M LENGTH, 1.5M WIDE AND 2.3M HIGH), 27 NO. SWITCHGEAR UNITS (UP TO 1.5M LENGTH, 1.5M WIDE AND 2.2M HIGH), SUBSTATION CONTAINER (UP TO 4.5M LENGTH, 4.5M WIDE AND 3.0M HIGH); INTERNAL PERMEABLE ACCESS ROAD JOINING THE FACILITY WITH THE EXISTING MEENADREEN WIND FARM ROAD NETWORK AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS, INCLUDING FENCING, DRAINAGE AND UNDERGROUND ELECTRICAL CONNECTIONS, REQUIRED TO FACILITATE THE DEVELOPMENT AND USE OF EXISTING ACCESS ARRANGEMENTS. A NATURA IMPACT STATEMENT ACCOMPANIES THIS APPLICATION

MEENADREEN , STRANESS , CO. DONEGAL