1950559
CONDITIONALDonegal - Donegal County Council
Proposed Development
DEMOLITION OF EXISTING DERELICT HOUSE AND ERECTION OF NEW REPLACEMENT DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM
View the full application file on the council's planning portal →Application Timeline
Application received
17 Apr 2019
Decision: CONDITIONAL
7 Jun 2019
Decision due
11 Jun 2019
Grant issued
10 Jul 2019
Application Details
- Location
- GOLDRUM , TERMON , LETTERKENNY P.O.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.43 ha
- Floor Area
- 278 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 17 April 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 7 June 2019
- Grant Date
- 10 July 2019
- Permission Expires
- 9 July 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
EXTENSION TO THE REAR OF EXISTING DWELLING HOUSE AND UPGRADING OF EXISTING SEPTIC TANK SYSTEM
GOLDRUM , LETTERKENNY , CO DONEGAL
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE
GOLDRUM , TERMON , LETTERKENNY PO
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE
GOLDRUM , TERMON , LETTERKENNY PO
ERECTION OF A NEW DWELLING HOUSE AND DOMESTIC GARAGE WITH SEWAGE TREATMENT SYSTEM INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
GOLDRUM , TERMON , LETTERKENNY PO
ERECTION OF A NEW DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
GOALDRUM , TERMON , LETTERKENNY
ERECTION OF A DWELLING HOUSE WITH WASTEWATER TREATMENT SYSTEM, A DOMESTIC GARAGE AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
FAWNS , TERMON , LETTERKENNY PO
REVISIONS TO PREVIOUSLY APPROVED PLANNING REF. NO. 21/50825 INCLUDING PROPOSED CHANGE OF HOUSE TYPE, RELOCATION OF ENTRANCE AND ALL ASSOCIATED SITE WORKS
FAWANS , TERMON , LETTERKENNY
CONSTRUCTION OF A NEW DWELLING WITH SEPARATE DOMESTIC GARAGE AND SEWAGE TREATMENT SYSTEM WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
FAWANS , TERMON , CO. DONEGAL
(1) SITE LAYOUT CHANGES INCLUDING REDUCTION IN ROAD AND HARDSTANDING AREAS, REPOSITIONING OF THE ON-SITE WASTE WATER TREATMENT UNIT, REPOSITIONING OF GENERATOR HOUSING AND OMISSION OF EXTERNAL OIL TANK AND FENCE ENCLOSURE AND REVISED PARKING LAYOUT (2) REDUCTION IN THE FOOTPRINT OF THE WATER TREATMENT PLANT BUILDING AND REVISED INTERNAL AND EXTERNAL CHANGES TO THIS BUILDING (3) REDUCTION IN THE FOOTPRINT OF THE SLUDGE BUILDING BY AND REVISED INTERNAL AND EXTERNAL CHANGES TO THIS BUILDING (4) MODIFICATIONS TO THE RAW WATER BALANCING TANK STRUCTURE, INCLUDING REDUCING ITS HEIGHT (5) MODIFICATIONS TO THE CLEAR WATER TANK, INCLUDING REDUCING THE TANK HEIGHT AND RAISING THE LEVEL OF THE TANK WITH A RESULTANT MEAN INCREASE IN FINISHED GROUND LEVEL OF 1:48M (6) REPOSITIONING OF, AND ALTERATIONS TO, THE SLUDGE TREATMENT FACILITIES INCLUDING; INCREASING THE NUMBER OF TANKS FROM 6 TO 8, REPLACING THE SINGLE WASH WATER RECOVERY TANK WITH TWO CIRCULAR WASH WATER RECOVERY TANKS AND INSTALLATION OF AN ADDITIONAL UNDERGROUND STORAGE TANK (PROCESS WATER SUMP) (38.5 M2) (7) ALL ASSOCIATED SITE WORKS AND PERMISSION FOR MODIFICATIONS TO THE LANDSCAPING, GROUND LEVELS AND ASSOCIATED SITE WORKS TO ALLOW COMPLETION OF THE DEVELOPMENT.
GOLDRUM , TERMON , LETTERKENNY PO
MODIFICATIONS TO THE WATER TREATMENT PLANT DEVELOPMENT PERMITTED UNDER PLANNING PERMISSION REFERENCE 15/51355 INVOLVING (1) SITE LAYOUT CHANGES INCLUDING REDUCTION IN ROAD AND HARDSTANDING AREAS, REPOSITIONING OF THE ON-SITE WASTEWATER TREATMENT UNIT, REPOSITIONING OF GENERATOR HOUSING AND EXTERNAL OIL TANK, OMISSION OF GENERATOR SHED ENCLOSURE AND REVISED PARKING LAYOUT; (2) REDUCTION IN THE FOOTPRINT OF THE WATER TREATMENT PLANT BUILDING AND REVISED INTERNAL AND EXTERNAL CHANGES TO THIS BUILDING; (3) REDUCTION IN THE FOOTPRINT OF THE SLUDGE DEWATERING BUILDING AND REVISED INTERNAL AND EXTERNAL CHANGES TO THIS BUILDING; (4) REDUCTION TO THE RAW WATER BALANCING TANK HEIGHT, INCLUDING OMISSION OF OUTLET CHAMBERS; (5) MODIFICATIONS TO THE CLEAR WATER TANK, INCLUDING REDUCING THE TANK DEPTH, REDUCTION IN FOOT PRINT, AND RAISING THE ROOF LEVEL OF THE TANK BY 1.48M (6) REPOSITIONING OF, AND ALTERATIONS TO, THE SLUDGE TREATMENT FACILITIES INCLUDING; INCREASING THE NUMBER OF TANKS FROM 6 TO 8, REPLACING THE SINGLE WASH WATER RECOVERY TANK WITH TWO CIRCULAR WASH WATER RECOVERY TANKS AND INSTALLATION OF AN ADDITIONAL UNDERGROUND STORAGE TANK (PROCESS WATER SUMP) (38.5 M2); (7) ALL SITE WORKS ASSOCIATED WITH CHANGES TO DEVELOPMENT
GOLDRUM , TERMON , LETTERKENNY
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?