The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

1950903

N/A

Donegal - Donegal County Council

Proposed Development

CONSTRUCTION OF A NEW DWELLING HOUSE TOGETHER WITH INSTALLATION OF AN ONSITE SEPTIC TANK

View the full application file on the council's planning portal →

Application Details

Location
CROCKAHENNY , ILLIES , BUNCRANA
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
1.2 ha
Floor Area
270.54 sq m
Residential Units
1

Timeline

Registration Date
13 June 2019
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
1950975N/A25 Jun 2019

CONSTRUCTION OF A NEW DWELLING HOUSE TOGETHER WITH INSTALLATION OF AN ONSITE SEPTIC TANK

CROCKAHENNY , ILLIES , BUNCRANA

2m
1951164REFUSED29 Jul 2019

CONSTRUCTION OF A NEW DWELLING HOUSE TOGETHER WITH INSTALLATION OF ONSITE SEPTIC TANK

CROCKAHENNY , ILLIES , BUNCRANA

2m
1951111N/A18 Jul 2019

CONSTRUCTION OF A NEW DWELLING HOUSE TOGETHER WITH INSTALLATION OF AN ONSITE SEPTIC TANK

CROCKAHENNY , ILLIES , BUNCRANA

130m
2150288CONDITIONAL22 Feb 2021

ERECTION OF A DWELLING WITH EFFLUENT TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

CROCKAHENNY , ILLIES , CO DONEGAL

337m
2661260CONDITIONAL7 Jul 2026

A PERIOD OF 10 YEARS FOR A LONG DURATION ENERGY STORAGE FACILITY WHICH WILL CONSIST OF THE FOLLOWING ELEMENTS: INSTALLATION AND OPERATION OF 1 NO. ENERGY STORAGE SYSTEM COMPOUND CONTAINING ENERGY STORAGE CONTAINERS, CONNECTED TO THE NATIONAL GRID SYSTEM VIA C. 50M OF UNDERGROUND CABLE TO THE CUSTOMER SUBSTATION, UPGRADES TO THE EXISTING CUSTOMER SUBSTATION, ELECTRICAL TRANSFORMERS AND INVERTER UNITS, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES, CCTV, INTERNAL ACCESS ROADS, ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFESPAN OF THE DEVELOPMENT WILL BE 35 YEARS AND THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C. 0.54 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

CROCKAHENNY , INISHOWEN , CO. DONEGAL

337m
2661220CONDITIONAL1 Jul 2026

A PERIOD OF 10 YEARS FOR THE PROPOSED DEVELOPMENT WHICH WILL CONSIST OF THE FOLLOWING ELEMENTS: INSTALLATION AND OPERATION OF 1 NO. NEW 38KV SUBSTATION, INCLUDING A NEW 38KV BUILDING AND COMPOUND, 38KV ESB LINE BAY, RELOCATION OF THE EXISTING 38KV CABLE MAST, UPGRADES TO THE EXISTING CUSTOMER SUBSTATION AND 38KV LINE, C. 50M OF UNDERGROUND CABLE TO THE CUSTOMER SUBSTATION, ELECTRICAL EQUIPMENT, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES, CCTV, INTERNAL ACCESS ROADS, ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFESPAN OF THE DEVELOPMENT WILL BE 35 YEARS. THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C. 0.54 HECTARES. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

CROCKAHENNY , INISHOWEN , CO. DONEGAL

337m
2660441N/A18 Mar 2026

A 10 YEAR PLANNING PERMISSION FOR A LONG DURATION ENERGY STORAGE FACILITY CONSISTING OF: INSTALLATION AND OPERATION OF 1 NO. BATTERY ENERGY STORAGE SYSTEM COMPOUND CONTAINING BATTERY ENERGY STORAGE CONTAINERS, 1 NO. ELECTRICAL SUBSTATION AND COMPOUND, CONNECTION TO THE NATIONAL GRID SYSTEM VIA 50M OF UNDERGROUND CABLE TO THE ESB CROCKAHENNY 38KV SUBSTATION, ELECTRICAL TRANSFORMERS AND INVERTER UNITS, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES, CCTV, INTERNAL ACCESS ROAD, ASSOCIATED ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFESPAN OF THE DEVELOPMENT WILL BE 35 YEARS AND THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C. 0.54 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

CROCKAHENNY , INISHOWEN , CO. DONEGAL

337m
2660496N/A24 Mar 2026

A 10 YEAR PLANNING PERMISSION FOR A LONG DURATION ENERGY STORAGE FACILITY CONSISTING OF: INSTALLATION AND OPERATION OF 1 NO. BATTERY ENERGY STORAGE SYSTEM COMPOUND CONTAINING BATTERY ENERGY STORAGE CONTAINERS, 1 NO. ELECTRICAL SUBSTATION AND COMPOUND, CONNECTION TO THE NATIONAL GRID SYSTEM VIA 50M OF UNDERGROUND CABLE TO THE ESB CROCKAHENNY 38KV SUBSTATION, ELECTRICAL TRANSFORMERS AND INVERTER UNITS, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES, CCTV, INTERNAL ACCESS ROAD, ASSOCIATED ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE OPERATIONAL LIFESPAN OF THE DEVELOPMENT WILL BE 35 YEARS AND THE SITE OF THE PROPOSED DEVELOPMENT HAS A TOTAL AREA OF C. 0.54 HECTARES. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

CROCKAHENNY , INISHOWEN , CO. DONEGAL

337m
2660373N/A10 Mar 2026

A 10 YEAR PLANNING PERMISSION WITH A 35 YEAR OPERATIONAL LIFESPAN FOR DEVELOPMENT OF THE FOLLOWING: (1) INSTALLATION AND OPERATION OF 1NO. BATTERY ENERGY STORAGE SYSTEM COMPOUND CONTAINING BATTERY ENERGY STORAGE CONTAINERS, (2) 1NO. ELECTRICAL SUBSTATION AND COMPOUND, (3) CONNECTION TO NATIONAL GRID SYSTEM VIA 50M OF UNDERGROUND CABLE TO THE ESB CROCKAHENNY 38kV SUBSTATION, (4) ELECTRICAL TRANSFORMERS AND INVERTER UNITS, UNDERGROUND CABLING AND DUCTING, BOUNDARY FENCING, SECURITY ENTRANCE GATES AND CCTV, (5) INTERNAL ACCESS ROAD, (6) ASSOCIATED ANCILLARY SITE DEVELOPMENT, LANDSCAPING AND REINSTATEMENT WORKS. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

CROCKAHENNY , INISHOWEN , CO. DONEGAL

860m
2562117CONDITIONAL2 Dec 2025

A 10-YEAR PLANNING PERMISSION FOR THE CONSTRUCTION OF TWO WIND TURBINES WITHIN THE LANDHOLDING OF THE CROCKAHENNY WINDFARM AND ALL ASSOCIATED WORKS INCLUDING TWO WIND TURBINES THAT WILL HAVE AN OVERALL BLADE TIP HEIGHT OF UP TO 135 METRES; SITE WORKS INCLUDING THE CONSTRUCTION OF WIND TURBINE FOUNDATIONS, TURBINE HARD STANDINGS AND ASSEMBLY AREAS WITH ASSOCIATED DRAINAGE; A PROPOSED 38 KV ELECTRICAL SUBSTATION TO REPLACE THE EXISTING ELECTRICAL SUBSTATION AND CONTINUED USE OF THE EXISTING ELECTRICAL COMPOUND; TWO EXTENSIONS OF EXISTING ACCESS TRACKS WITHIN THE SITE; INSTALLATION OF UNDERGROUND ELECTRICAL CABLE IN EXISTING ELECTRICAL DUCTS AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE PROPOSED WIND TURBINES WILL CONNECT TO THE PROPOSED SUBSTATION AND WILL AVAIL OF THE EXISTING TRACKS AND ENTRANCE. THE PROPOSED DEVELOPMENT WILL HAVE A 30 YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

CROCKAHENNY , LEAMACROSSAN HILL , INISHOWEN

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?