1950911
CONDITIONALDonegal - Donegal County Council
Proposed Development
(1) RETENTION OF 2 NO. UNFINISHED SEMI-DETACHED DWELLINGS, TEMPORARY LOCATION OF MOBILE HOME AND CONNECTION TO EXISTING WASTEWATER TREATMENT SYSTEM SERVING THE APPLICANT'S PARENT'S DWELLING AND (2) ALTERATIONS TO THE STRUCTURE CURRENTLY COMPRISING 2 NO. UNFINISHED SEMI-DETACHED DWELLINGS TO PROVIDE FOR A SINGLE DWELLING AND A SEPTIC TANK AND PERCOLATION AREA TO SERVE THE PROPOSED SINGLE DWELLING ALONG WITH ALL ASSOCIATED SITE WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
14 Jun 2019
Further information requested
8 Aug 2019
Further information received
30 Aug 2019
Decision: CONDITIONAL
19 Sept 2019
Decision due
26 Sept 2019
Grant issued
23 Oct 2019
Application Details
- Location
- SOPPOG , MUFF , LIFFORD PO
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Donegal County Council
- Site Area
- 1.2 ha
- Floor Area
- 322 sq m
- Residential Units
- 2
Timeline
- Registration Date
- 14 June 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 September 2019
- Grant Date
- 23 October 2019
- Permission Expires
- 22 October 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
RETENTION OF TWO SEMI-DETACHED DWELLINGS AND TWO SEPTIC TANKS AND PERCOLATION AREAS TO SERVE BOTH DWELLINGS ALONG WITH ALL ASSOCIATED SITE WORKS
SOPPOG , MUFF , LIFFORD PO
(A) THE DEMOLITION OF TWO SEMI-DETACHED DWELLINGS AND (B) TWO PARTIALLY COMPLETED SEMI DETACHED REPLACEMENT DWELLINGS AND PLANNING PERMISSION FOR (A) AMENDMENTS TO THE DESIGN OF THE REPLACEMENT DWELLINGS AND (B) TWO SEPTIC TANKS, PUMPS AND PERCOLATION AREAS TO SERVE BOTH DWELLINGS ALONG WITH ALL ASSOCIATED SITE WORKS
SOPPOG , MUFF , LIFFORD PO
(1) RETENTION OF (A) THE DEMOLITION OF TWO SEMI-DETACHED DWELLINGS, (B) TWO PARTIALLY COMPLETED SEMI DETACHED REPLACEMENT DWELLINGS AND (C) TEMPORARY LOCATION OF A MOBILE HOME AND CONNECTION TO EXISTING WASTE WATER TREATMENT, (2) AMENDMENTS TO THE DESIGN OF THE REPLACEMENT DWELLINGS AND (3) INSTALLATION OF TWO SEPTIC TANKS, PUMPS AND PERCOLATION AREAS TO SERVE BOTH DWELLINGS ALONG WITH ALL ASSOCIATED SITE WORKS AT SOPPOG MUFF LIFFORD PO CO. DONEGAL
SOPPOG , MUFF , LIFFORD PO
(A) A SINGLE DWELLING AND (B) THE TEMPORARY LOCATION OF A MOBILE HOME AND CONNECTION TO EXISTING WASTE WATER TREATMENT AND PERMISSION FOR AMENDMENTS TO THE DESIGN OF THE SINGLE DWELLING AND (B) A SEPTIC TANK AND PERCOLATION AREA TO SERVE THE SINGLE DWELLING ALONG WITH ALL ASSOCIATED SITE WORKS
SOPPOG , MUFF , LIFFORD PO
CONSTRUCTION OF NEW SINGLE STOREY AGRICULTURAL SHED (TOTAL AREA 277M2) TO THE WEST SIDE OF A PREVIOUSLY APPROVED AGRICULTURAL SHED CURRENTLY UNDER CONSTRUCTION (PLANNING REF. 1951363), ALONG WITH CONNECTION TO EXISTING SERVICES
SOPPOG , MUFF , LIFFORD PO
CONSTRUCTION OF A NEW SINGLE STOREY AGRICULTURAL SHED WITH SLURRY TANK (TOTAL AREA 466M2) TO THE SIDE OF AN EXISTING AGRICULTURAL SHED, ALONG WITH CONNECTION TO EXISTING SERVICES
SOPPOG , MUFF , LIFFORD PO
(a) ERECTION OF NEW DRY BED AGRICULTURAL SHED ABUTTING EXISTING SHEDS AND (b) CONSTRUCTION OF NEW ROOFED AREA OVER EXISTING OPEN CATTLE CRUSH AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
SOPPOG , MUFF , LIFFORD PO
ERECTION OF A NEW DRY BED AGRICULTURAL SHED ABUTTING EXISTING SHEDS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
SOPPOG , MUFF , LIFFORD
ERECTION OF SINGLE STOREY EXTENSIONS TO SIDE AND REAR OF EXISTING DWELLING WITH CONNECTION TO EXISTING SEPTIC TANK AND ACCESS VIA EXISTING SHARED PRIVATE ACCESS ROAD AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
SOPPOG , MUFF , LIFFORD PO
REFURBISHMENT OF EXISTING DWELLING, PROPOSED EXTENSIONS TO SIDE ELEVATIONS, REAR ELEVATION, NEW FRONT PORCH, NEW ROOF, CONNECTION TO EXISTING ON SITE FOUL & STORM SERVICES AND ASSOCIATED SITE WORKS
SOPPOG , MUFF , LIFFORD P.O.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?