1951126

CONDITIONAL

Donegal - Donegal County Council

Proposed Development

CONSTRUCTION OF A VEHICLE ACCESS BRIDGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) FORMS PART OF THIS APPLICATION.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Jul 2019

  2. Further information requested

    5 Sept 2019

  3. Further information received

    23 Dec 2019

  4. Decision: CONDITIONAL

    20 Feb 2020

  5. Decision due

    25 Feb 2020

  6. Grant issued

    25 Mar 2020

Application Details

Location
CULOORT , MALIN HEAD , LIFFORD PO
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Donegal County Council
Site Area
0.11 ha

Timeline

Registration Date
22 July 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 February 2020
Grant Date
25 March 2020
Permission Expires
24 March 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
1750252N/A20 Feb 2017

CONSTRUCTION OF A VEHICLE ACCESS BRIDGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

CULOORT , MALIN HEAD , LIFFORD PO

362m
1950033UNCONDITIONAL16 Jan 2019

CHANGE OF HOUSE TYPE DESIGN INCORPORATING EXISTING WALLSTEADS OF AN OLD COTTAGE RUINS. THE PROPOSED DESIGN DIFFERS FROM THAT APPROVED UNDER PLANNING PERMISSION REFERENCE 09/70462 (DURATION OF PERMISSION EXTENDED UNDER REF: 14/51121)

CULOORT , MALIN HEAD , LIFFORD PO

503m
2660214CONDITIONAL17 Feb 2026

(1) RETENTION OF (A) DEMOLITION AND REBUILD OF COTTAGE, (B) EXTENSION AND MINOR ELEVATIONAL CHANGES TO EXTENSION PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 98/2874, (C) FIRST FLOOR EXTENSION, (D) PARTIAL DEMOLITION AND EXTENSION TO SHED, (E) TEMPORARY ACCOMMODATION IN SHED, (F) ENTRANCE, (G) SHED AND (2) DECOMMISSIONING OF EXISTING SEPTIC TANK AND REPLACEMENT WITH A WASTE WATER TREATMENT SYSTEM, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS

THE WHITE STRAND , CREGA , ARD MALIN AND CULOORT MALIN HEAD

662m
2350151CONDITIONAL9 Feb 2023

CONSTRUCTION OF A SINGLE-STOREY DWELLING HOUSE, AND SEPARATE GARAGE, ART STUDIO AND MUSIC STUDIO BUILDING, ALL FOR DOMESTIC AND PERSONAL USE ONLY

CULOORT , MALIN , LIFFORD PO

690m
2351408REFUSED21 Sept 2023

CONSTRUCTION OF A NEW SINGLE STOREY DETACHED DWELLING, PROPOSED NEW WASTEWATER TREATMENT PLANT AND PERCOLATION AREA, TOGETHER WITH ASSOCIATED SITEWORKS AND CONNECTION TO EXISTING SERVICES. A NATURA IMPACT ASSESSMEMT (NIS) ACCOMPANIES THIS APPLICATION

CULOORT , MALIN HEAD , LIFFORD PO

803m
2561900CONDITIONAL2 Nov 2025

FIRST FLOOR AND PERMISSION FOR DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE BUILDING MATERIALS AND ERECTION OF A REPLACEMENT DWELLING WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

CULOORT , MALIN HEAD , LIFFORD PO

810m
2350852CONDITIONAL15 Jun 2023

DEMOLITION OF EXISTING DWELLING HOUSE AND THE ERECTION OF A REPLACEMENT DWELLING HOUSE TOGETHER WITH ALL ASSOCIATED WORKS AND CONNECTION TO EXISTING SERVICES

CARNMALIN , MALIN HEAD , ARDMALIN (TD)

818m
2660738N/A27 Apr 2026

(1) CONSTRUCTION OF A SINGLE STOREY EXTENSION WITH EXTENSIVE DEMOLITION AND RENOVATIONS TO AN EXISTING SINGLE STOREY DWELLING CONSISTING OF A NEW ENTRANCE HALL WITH AN OPEN PLAN LIVING/KITCHEN/DINING TO THE GROUND FLOOR WITH A UTILITY AND 3 NO. BEDROOMS, ONE WITH EN SUITE AND BATHROOM TOGETHER WITH ASSOCIATED SITE WORKS, (2) CONSTRUCTION OF AN UPGRADED SITE ENTRANCE, LOCATED AT THE EXISTING ENTRANCE AND (3) CONSTRUCTION OF A NEW PROPRIETARY WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS NECESSARY TO FACILITATE THE DEVELOPMENT

MUCKLA , MALIN HEAD , INISHOWEN

818m
2562260N/A17 Dec 2025

(1) CONSTRUCTION OF A SINGLE STOREY EXTENSION TO AN EXISTING SINGLE STOREY DWELLING CONSISTING OF A NEW ENTRANCE HALL WITH AN OPEN PLAN LIVING/KITCHEN/DINING TO THE GROUND FLOOR WITH A UTILITY AND 3 NO. BEDROOMS, ONE WITH EN SUITE, AND BATHROOM TOGETHER WITH ASSOCIATED SITE WORKS, (2) CONSTRUCTION OF AN UPGRADED SITE ENTRANCE, LOCATED AT THE EXISTING ENTRANCE AND (3) CONSTRUCTION OF A NEW PROPRIETARY WASTE WATER TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS NECESSARY TO FACILITATE THE DEVELOPMENT

MUCKLA , MALIN HEAD , INISHOWEN

818m
2660659N/A16 Apr 2026

CONSTRUCTION OF A SINGLE STOREY EXTENSION TO AN EXISTING SINGLE STOREY DWELLING CONSISTING OF A NEW ENTRANCE HALL WITH AN OPEN PLAN LIVING/KITCHEN/DINING TO THE GROUND FLOOR WITH A UTILITY AND 3 NO. BEDROOMS, ONE WITH EN SUITE AND BATHROOM TOGETHER WITH ASSOCIATED SITE WORKS, INCLUDING THE CONSTRUCTION OF AN UPGRADED SITE ENTRANCE, LOCATED AT THE EXISTING ENTRANCE, TOGETHER WITH THE CONSTRUCTION OF A NEW PROPRIETARY WASTE WATER TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS NECESSARY TO FACILITATE THE DEVELOPMENT

MUCKLA , MALIN HEAD , INISHOWEN