1951427
N/ADonegal - Donegal County Council
Proposed Development
CONSTRUCTION OF A NEW DWELLING, DOMESTIC GARAGE, SEWAGE TREATMENT SYSTEM & ANCILLARY SITE WORKS
View the full application file on the council's planning portal →Application Details
- Location
- BALLYLIN , RAMELTON , LETTERKENNY PO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.282 ha
- Floor Area
- 303 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 17 September 2019
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCTION OF A NEW DWELLING, DOMESTIC GARAGE, SEWAGE TREATMENT SYSTEM & ANCILLARY SITE WORKS
BALLYLIN , RAMELTON , LETTERKENNY PO
CHANGE OF HOUSE DESIGN FOR DWELLING HOUSE PREVIOUSLY PERMITTED UNDER PLAN. REG. REF. NO. 21/52022
BALLYLIN , RAMELTON , LETTERKENNY PO
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
BALLYLIN , RAMELTON , LETTERKENNY PO
CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, SEPTIC TANK / SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE DEVELOPMENT WORKS
BALLYLIN , RAMELTON , LETTERKENNY PO
ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK AND DOMESTIC GARAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
BALLYLIN , RAMELTON , LETTERKENNY PO
CONSTRUCTION OF RURAL TOURIST ACCOMMODATION IN ACCORDANCE WITH THE DEPARTMENT OF HOUSING, PLANNING, COMMUNITY AND LOCAL GOVERNMENTS RURAL DEVELOPMENT PROGRAMME (LEADER) 2014-2020, THEME 1; COMPRISING COMMUNAL KITCHEN/DINING AREA IN CONVERTED STONE BUILDING, TIMBER FRAME COMMUNAL SHOWER/SERVICES BLOCK, 6 BEDROOM & 2 NO. 2 BEDROOM TIMBER FRAME BLOCKS, 2 BEDROOM BLOCK IN CONVERTED STONE BUILDING, 2 NO. SHEPHERD HUT ACCOMMODATION UNITS, SPA RECEPTION UNIT, STAND-ALONE HOT TUB, SAUNA BLOCK AND 4 NO. DESIGNATED SINGLE TENT CAMPING AREAS
BALLYLIN , RAMELTON , LETTERKENNY PO
ERECTION OF 260M2 OF PHOTOVOLTAIC SOLAR PANELS AT GROUND LEVEL AT THE REAR OF THE OAKWELL HOLIDAY VILLAGE SITE AND ANCILLARY SITE WORKS
BALLYLIN , RAMELTON , LETTERKENNY PO
CONSTRUCTION OF 6 ADDITIONAL TIMBER LOG CABIN STYLE ACCOMMODATION UNITS TO THE OAKWELL HOLIDAY VILLAGE, CHILDRENS PLAY AND ADULT SEATING AREAS, WASTEWATER TREATMENT PLANT, EXTENSION TO EXISTING PERCOLATION AREA AND ANCILLARY SITE SERVICES
BALLYLIN , RAMELTON , LETTERKENNY PO
(1) 6 NO. LOG CABIN STYLE UNITS AS CONSTRUCTED AND WHICH DEVIATE FROM THE AS GRANTED PERMISSION OF PLANNING REF. NO. 20/51627, (2) REED BED SYSTEM WHICH IS IN PLACE TO DEAL WITH THE EFFLUENT GENERATED ON SITE AND (3) ALL OTHER SITE DEVELOPMENT WORKS
BALLYLIN , RAMELTON , LETTERKENNY PO
(1) 6 NO. LOG CABIN STYLE UNITS AS CONSTRUCTED WHICH DEVIATE FROM THE AS GRANTED PERMISSION OF REF. NO. 20/51627, (2) REED BED SYSTEM WHICH IS IN PLACE TO DEAL WITH THE EFFLUENT GENERATED ON SITE AND (3) ALL OTHER SITE DEVELOPMENT WORKS
BALLYLIN , RAMELTON , LETTERKENNY PO
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?