1951532
N/ADonegal - Donegal County Council
Proposed Development
CONSTRUCTION OF A LEISURE PARK WITH 26 NO. LUXURY STATIC HOLIDAY HOLMES WITH CONNECTION TO EXISTING MAINS SEWER AND PUBLIC SERVICES
View the full application file on the council's planning portal →Application Details
- Location
- SWILLY ROAD , ARDARVAN , BUNCRANA
- Applicant
- N/A
- Application Type
- OUTLINE PERMISSION
- Planning Authority
- Donegal County Council
- Site Area
- 0.97 ha
- Floor Area
- 1300 sq m
- Residential Units
- 26
Timeline
- Registration Date
- 10 October 2019
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
EXTENSION OF AN EXISTING APARTMENT BLOCK TO PROVIDE 4 NO. ADDITIONAL APARTMENTS WITH ASSOCIATED STAIRWELL AND ALL ASSOCIATED WORKS AND SITE WORKS
ARDARAVAN , BUNCRANA , LIFFORD PO
(1) ENTRY PORCH CONSTRUCTED OVER THE EXISTING ACCESS RAMP (2) 2NO. EXTERNAL SIGNS (C) SERVICE HATCH ALL LOCATED ON THE SOUTH EAST FACING ELEVATION AND PERMISSION FOR (1) REMOVAL OF THE EXISTING CONCRETE RAMP ACCESSING THE BEACH (2) CONSTRUCTION OF A TIERED BALCONY AREA WITH 2.1M HIGH PERIMETER GLAZED WIND BREAKER, RETRACTABLE AWNINGS, ACCESS FROM THE EXISTING BUILDING AND STEPPED ACCESS FROM THE FOOTPATH (3) CONSTRUCTION OF NEW STEPPED AND RAMPED ACCESS TO THE BEACH
TANK & SKINNY'S , SWILLY ROAD , ARDARAVAN
CONSTRUCTION OF A NEW STOREY AND A HALF DETACHED DWELLING, NEW VEHICULAR ENTRANCE WITH A REALIGNED BOUNDARY WALL AND NEW PARKING AREA FOR THE DEVELOPMENT ACCESSED FROM AILEACH ROAD (AT LOCATION OF EXISTING VEHICULAR ENTRANCE), WHICH WILL BE LINKED TO THE DWELLING BY MEANS OF A NEW RIGHT OF WAY
SWILLY ROAD , BUNCRANA , LIFFORD PO
MINOR ALTERATIONS TO EXISTING DWELLING COMPRISING; REVISED FRONT PORCH AND BAY WINDOW DESIGN, REAR SINGLE STOREY KITCHEN/LIVING/DINING EXTENSION, REMOVAL OF REAR CHIMNEYS, ERECTION OF 2 NO. SIDE WINDOW/DOOR ON GROUND LEVEL, REINSTATEMENT OF 1 NO REAR FIRST FLOOR WINDOW, REMOVAL OF 1 NO SIDE FIRST FLOOR WINDOW, DEMOLITION OF DETACHED SIDE BOILER ROOM AND ERECTION OF REPLACEMENT SINGLE STOREY DETACHED SIDE GARAGE AND BOILER ROOM AND PLANNING PERMISSION FOR THE REPLACEMENT OF WINDOWS AND DOORS AND ALL ASSOCIATED WORKS
SWILLY ROAD , ARDARAVAN , BUNCRANA
RETENTION AND COMPLETION OF ALTERATIONS TO EXISTING DWELLING COMPRISING; REVISED FRONT PORCH AND BAY WINDOW DESIGN, REAR SINGLE STOREY EXTENSION, ALTERATIONS TO EXTERNAL ELEVATIONS, REVISED SINGLE STOREY DETACHED SIDE GARAGE AND BOILER ROOM AND ALL ASSOCIATED SITE WORKS
SWILLY ROAD , ARDARAVAN , BUNCRANA
(A) DEMOLITON OF A SINGLE STOREY LEAN-TO AT THE REAR OF DWELLING (B) CONSTRUCTION OF A TWO-STOREY EXTENSION TO THE REAR OF DWELLING AND ALL ASSOCIATED WORKS
CUL CRANNAC , AILEACH , ARDARAVAN
A TEN YEAR DURATION FOR DEVELOPMENT CONSISTING OF THE CONSTRUCTION OF A NEW STORM WATER STORAGE TANK AND ASSOCIATED WORKS
BUNCRANA WASTEWATER TREATMENT PLANT , RAILWAY ROAD , BALLYMACARRY LOWER
(1) UPSIZING OF APPROXIMATELY 240M OF 225MM SEWER TO 450MM MINIMUM DIAMETER FROM THE JUNCTION OF CAHIR O'DOHERTY AVENUE AND CRANA ROAD TO OUTSIDE OSBORNE HOUSE ON SHORE ROAD, (2) UPSIZING OF APPROXIMATELY 150M OF 225/300MM SEWER TO 450MM MINIMUM DIAMETER FROM OUTSIDE OSBORNE HOUSE ON SHORE ROAD TO OPPOSITE REAR ENTRANCE TO SCOIL MHUIRE SECONDARY SCHOOL ON GRIANAN PARK, (3) UPSIZING OF APPROXIMATELY 375M OF 300/375MM SEWER TO 525MM MINIMUM DIAMETER FROM OPPOSITE REAR ENTRANCE TO SCOIL MHUIRE SECONDARY SCHOOL ON GRIANAN PARK TO NEAR THE JUNCTION OF AILEACH ROAD AND RAILWAY ROAD (R238), (4) UPSIZING OF APPROXIMATELY 100M OF 375MM SEWER TO 500/525MM MINIMUM DIAMETER FROM NEAR THE JUNCTION OF AILEACH ROAD AND RAILWAY ROAD (R238) TO THE SOUTHERN SIDE OF VICTORIA BRIDGE ON RAILWAY ROAD (R238). THIS SECTION INCLUDES A 500MM DUCTILE IRON PIPE CROSSING OF THE VICTORIA BRIDGE OVER THE MILL RIVER. THIS PIPELINE WILL BE SUSPENDED FROM THE UNDERSIDE OF THE EXISTING BRIDGE STRUCTURE, ADJACENT TO AND PARALLEL TO AN EXISTING PIPELINE, (5) UPSIZING OF APPROXIMATELY 155M OF 375MM SEWER TO 600MM MINIMUM DIAMETER FROM THE SOUTHERN SIDE OF VICTORIA BRIDGE ON RAILWAY ROAD (R238) TO THE WESTERN END OF THE DONEGAL COUNTY COUNCIL STORAGE COMPOUND, (6) UPSIZING OF APPROXIMATELY 15M OF 600MM SEWER TO 750MM MINIMUM DIAMETER FROM THE WESTERN END OF THE DONEGAL COUNTY COUNCIL STORAGE COMPOUND TO THE WWTP INLET, (7) ALL ASSOCIATED SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
ARDARAVAN & BALLYMACARRY LOWER , BUNCRANA , CO DONEGAL
ERECTION OF A DWELLING, CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED WORKS
RAILWAY ROAD , BUNCRANA , LIFFORD PO
CONSTRUCTION OF (1) A NEW 2023M2 TWO-STOREY SCHOOL BUILDING, CONTAINING: 2 NO. GENERAL CLASSROOMS; SPECIAL TEACHING ROOMS FOR SCIENCE, HOME ECONOMICS, AND DESIGN AND COMMUNICATION GRAPHICS; SPECIAL EDUCATION ROOMS; TOILETS; ANCILLARY SUPPORT SPACES AND 4 NO. SPECIAL NEEDS CLASSROOMS WITH ACCOMPANYING SEN SUPPORT SPACES AND SPECIAL TEACHING ROOMS FOR MULTISENSORY, PRACTICAL ACTIVITY, AND DAILY LIVING SKILLS, (2) A ROOF MOUNTED 4KW PHOTOVOLTAIC PANEL SYSTEM FOR COMPLIANCE WITH PART L OF THE BUILDING REGULATIONS AND (3) ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING NEW LANDSCAPING, PARKING AREA AND ANCILLARY WORKS
SCOIL MHUIRE BUNCRANA , ST ORAN'S ROAD , BUNCRANA
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.