Proposed Development

construct a cottage style bungalow, septic tank & percolation area and all ancillary site development works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Sept 2019

  2. Application withdrawn

    1 Nov 2019

Application Details

Location
Forrest Upper , Mountmellick , Co. Laois
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Laois County Council
Site Area
0.83 ha

Timeline

Registration Date
27 September 2019
Status
WITHDRAWN
Decision
N/A
Withdrawn
1 November 2019

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

24m
19448N/A2 Aug 2019

construct a cottage style bungalow, septic tank and percolation area and all ancillary site development works

Forest Upper , Mountmellick , Co.Laois

509m
2078REFUSED17 Feb 2020

construct up to 8 no. wind turbines with a tip height of up to 185 metres and all associated foundations and hardstanding areas; 1 no. on-site electrical substation; 1 no. temporary construction compound; all associated underground electrical and communications cabling connecting the turbines to the proposed on-site electrical substation; provision of new site access tracks and upgrading of existing access tracks and associated drainage; erection of 1 no. permanent meteorological mast of up to 110m in heights; works to facilitate the delivery of turbines adjacent to the N80 within the townlands of Dernacart and Forest Upper to include the laying of temporary surfacing; tree felling; and all associated site development works, ancillary works and equipment. Permission is sought for a period of 10 years and an operational life of 30 years from the date of commissioning of the entire wind farm. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development.

Townlands of Dernacart Forest Upper & Forest Lower , Co. Laois

1.1km
2560627CONDITIONAL30 Sept 2025

construct log cabin with new septic tank and percolation area and for retention of existing mobile home on site for the duration of the project

Forest Lower , Mountmellick , Portlaoise

1.1km
20467CONDITIONAL16 Sept 2020

(1)construct dwelling house, detached domestic garage/shed, waste water treatment system and all associated site works; (2) remove existing foundations/substructure

Forest Lower , Mountmellick , Co. Laois

1.2km
2360127CONDITIONAL4 Apr 2023

construct new agricultural entrance and all associated site works

Forest Lower , Mountmellick , Co. Laois

1.2km
2460274CONDITIONAL21 May 2024

(A) construct a dwelling house, detached garage/shed, wastewater treatment system, new entrance and all associsted site works, (B) the relocation of an existing field entrance gate.

Forest Upper , Mountmellick , Co. Laois

1.2km
2560282REFUSED12 May 2025

retain existing Garage including Stables with new site Entrance and Planning Permission for a Proposed Dwelling House, Secondary Treatment System & soil polishing filter and to include all associated site works

Forest Lower , Mountmellick , Co. Laois

1.3km
2460191CONDITIONAL15 Apr 2024

construct a new dwelling house, entrance, on-site effluent treatment system, percolation area and all associated site works.

Forest Lower , Mountmellick , Laois

1.5km
17224N/A8 May 2017

(1) construct a cubicle shed. (2) Construct a cubicle shed adjacent to existing unroofed fed area/stand off yard. (3) Construct an extension to existing milking parlour collection yard. (4) Construct 2nd concrete aprons to be used as silage storage areas. (5) All associated site works

Lower Forest , Mountmellick , Co. Laois

1.5km
2360504N/A28 Nov 2023

Retain 2 no Cubicle sheds, Slurry Lagoon, Silage Pit and associated site works

Forest Lower , Mountmellick , Co Laois

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?