19555
CONDITIONALMayo - Mayo County Council
Proposed Development
ALTERATIONS TO PREVIOUSLY APPROVED HOUSE DESIGN GRANTED UNDER P16/42
View the full application file on the council's planning portal →Application Timeline
Application received
18 Jul 2019
Further information requested
6 Sept 2019
Further information received
19 Sept 2019
Decision: CONDITIONAL
15 Oct 2019
Decision due
16 Oct 2019
Grant issued
19 Nov 2019
Application Details
- Location
- DERREEN , ARDAGH , BALLINA
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Mayo County Council
- Floor Area
- 184 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 18 July 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 15 October 2019
- Grant Date
- 19 November 2019
- Permission Expires
- 18 November 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
36m multi-user telecommunications structure carrying telecommunications equipment including antennas, dishes, together with associated exchange cabinets, fence and all associated site development works. The development will provide for strategic transmission of wireless data and broadband services
Knockanillaun , Ballina , Co. Mayo
DEMOLISH EXISTING DETACHED TWO STOREY DWELLING HOUSE, CONSTRUCT REPLACEMENT DETACHED TWO STOREY DWELLING HOUSE TOGETHER WITH ALL ASSOCIATED SITE WORKS
BALLYMANAGH TD. , KNOCKANILLAUN , BALLINA
Bord na Móna Powergen Ltd., intend to apply for permission for proposed minor temporary and permanent works to facilitate the delivery of turbine components to the permitted Oweninny Wind Farm Phase 3 (Ref. PA16.316178). The Turbine Delivery Route (TDR) will originate at the port of entry at Killybegs Harbour, Co. Donegal, runs through Co. Sligo, Co. Leitrim and terminate at the consented Oweninny Wind Farm Phase 3 site, Co. Mayo. The total length of the TDR is c.188km of which c.65km is within Co. Donegal, c.57km in Co. Sligo, and c.36km in Co. Mayo. Minor temporary and permanent works are not proposed along this entire route but only at select locations. The total area of the works proposed in Co. Mayo is 5.87 Hectares (Ha). The proposed development within Co. County Mayo comprises both temporary and permanent works located in the townlands Lecarrow, Crossmolina, Abbeytown, Knockalegan, Glebe, Gortskeddia, Ballina, Abbeyhalfquarter, Knocknalyre and Bunree. The works are required to accommodate delivery of Abnormal Indivisible Loads (AIL) and will consist of: • Laying of temporary load bearing surfaces at 6 No. locations • Temporary modification to street furniture (traffic lights, bench, junction boxes, wall and part of a bridge parapet/railing) at 1No. location • Temporary removal of street lighting, bollard and tree removal at 1No. location. • Temporary removal of a wall and gate, berm regarding, hedge trimming and temporary modification to street furniture at 1No location. • Temporary removal of wall and vegetation as well as temporary modifications to street furniture at 1No. location • Temporary entrance to be constructed at 3 No. locations • Construction of a dual-purpose permanent access and public amenity track of approx. 2.7km at Crossmolina, Co. Mayo • Construction of permanent bridge crossing of the River Deel at Crossmolina, Co. Mayo • Installation of permanent lighting along the access and amenity track at Crossmolina, Co. Mayo • Installation of permanent sustainable drainage system along the access and amenity track at Crossmolina, Co. Mayo • Installation of temporary construction compound to include site offices, welfare facilities and car parking at Crossmolina Co. Mayo. • Reinstatement of all temporary works areas to previous condition • All associated and ancillary works required for the accommodation works and construction for the TDR. Permission is sought for a period of 10 years. Separate applications wil
Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree , Lecarrow Crossmolina Abbeytown Knockalegan Glebe Gortskeddia Ballina Abbeyhalfquarter Knocknalyre and Bunree , Co. Mayo
RETENTION OF AN EXISTING DOMESTIC DWELLING HOUSE DEVELOPMENT AND ASSOCIATED SITE SERVICES AND DEVELOPMENT WORKS
BRACKLOONAGH , (DEELCASTLE) , CROSSMOLINA
retention permission for an existing domestic dwelling house development and associated site services and development works
Brackloonagh , (Deelcastle) , Crossmolina
CONSTRUCT NEW DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DETACHED DOMESTIC GARAGE INCLUDING ALL ANCILLARY SITE WORKS
BRACKLOONAGH , BALLINA , CO MAYO
RETAIN EXISTING DWELLING HOUSE AND ITS ASSOICATED SERVICES WITHIN THE SITE AREA/BOUNDARIES ALL AS DEFINED WITHIN THE RETENTION APPLICATION DOCUMENTS, TO INCLUDE RETENTION OF ALL OTHER SITE SERVICES AND DEVELOPMENT WORKS ASSOCIATED WITH THIS RETENTION PERMISSION AND PLANNING PERMISSION FOR COMPLETION OF ANY OUTSTANDING SITE SERVICES AND DEVELOPMENT WORKS.
BRACKLOONAGH , CROSSMOLINA
CONSTRUCTION OF A 4 BAY ENCLOSED LOOSE HOUSE TOGETHER WITH ALL ASSOCIATED SITE WORKS
CLOONGLASNEY , KNOCKANILLAUN , BALLINA
Planning retention as constructed for an existing 4 bay enclosed loose house and installation of a septic tank and percolation area servicing an existing dwelling along with all associated site works as previously granted by planning ref: 21/936.
Cloonglasney , Knockanillaun Ballina , Co.Mayo
Planning retention as constructed for an existing 4 bay enclosed loose house and installation of a septic tank and percolation area servicing an existing dwelling along with all associated site works as previously granted by planning ref: 21/936.
Cloonglasney , Knockanillaun Ballina , Co.Mayo
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?