The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

19600420

N/A

Tipperary - Tipperary County Council

Proposed Development

replace existing derelict garage, new building to comprise shop/commercial unit on ground floor and overhead office units and connect to existing services on site and carry out associated site works

View the full application file on the council's planning portal →

Application Details

Location
Main Street , Ballina , Co Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
25 April 2019
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

5m
2560989N/A3 Oct 2025

the alterations to the number, location and sizes of windows and doors from that permitted, and extension of premises to rear boundary and all associated site works

Main Street , Ballina , Co. Tipperary

5m
19600584CONDITIONAL30 May 2019

to demolish existing derelict garage and erect a new building, new building to comprise shop/commercial unit on ground floor and overhead office units and connect to existing services on site and carry out associated site works

Main Street , Ballina , Co Tipperary

39m
17600328N/A31 Mar 2017

alterations/refurbishmentss to existing residence, demolition of existing two-storey extension and sheds at the rear of the residence together with single storey retail unit (vacant) to the side, construction of two-storey extension (with attic accommodation) at the rear, re-align existing front boundary wall and associated site development works

Main Street , Ballina

42m
17600476N/A5 May 2017

alterations/refurbishments to existing residence, demolition of existing two storey extension and sheds at the rear of the residence together with single storey retail unit (vacant) to the side. Construction of two storey extension (with attic accommodation) at the rear, re-align existing front, boundary wall and associated site development works

Main Street , Ballina

42m
17600533CONDITIONAL12 May 2017

alterations/refurbishments to existing residence, demolition of existing two storey extension and sheds at the rear of the residence together with single storey retail unit (vacant) to the side. Construction of two storey extension (with attic accommodation) at the rear, re-align existing front boundary wall and associated site development works

Main Street , Ballina

42m
211692N/A22 Nov 2021

permanent separation of the duplex unit, previously used for guest accommodation, from the main dwelling house, this alteration constitutes a material deviation of condition 1 of permission 03/51/0191 and will provide 2 separate dwellings where previously there was one

Caherelly Close , Main Street , Ballina

42m
211796N/A13 Dec 2021

permanent separation of the duplex unit, previously used for guest accommodation from the main dwelling house. This alteration constitutes a material deviation of condition 1 of permission 03/51/0191. It will provide 2 separate dwelings, where previously there was one

Caherelly Close , Main Street , Ballina

44m
2660083N/A4 Feb 2026

the construction of three residential units, which include 2 no. 2-bedroom duplex units and 1 studio, connection to the public services and ancillary site development works, which include works to the boundaries of the neighbouring protected structure (RPS S676)

Caherelly Close , Main Street , Ballina

53m
211887CONDITIONAL23 Dec 2021

permanent separation of the duplex unit, previously used for guest accommodation, from the main dwelling house, this alteration constitutes a material deviation of condition 1 of permission 03/51/0191 and will provide 2 separate dwellings where previously there was one

Caherelly Close , Main Street , Ballina

59m
2461049CONDITIONAL6 Dec 2024

the construction of a private dwelling house, entrance from Washerwomen’s Lane, connection to the public services and ancillary site development works, which includes the demolition of a ruined shed

Caherelly Close , Main Street , Ballina

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?