The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

19600515

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

(a) An extension to the existing waste intake shed including backlit signage, (b) A new higher roof to existing waste intake shed, (c) An open fronted shed over the WEEE area, (d) An open fronted shed to the wood picking area, (e) New concrete storage bays, (f) New 2 storey weighbridge building and weighbridge, (g) New single storey prefabricated clock in and staff locker building, (h) 2 new vehicular entrances including re-aligned hedgerows and widened roadways, (i) New staff carparking and paladin fence surround, (j) New elevated walkway, (k)Relocation of existing fuel storage tank on site, (l) Expansion of concrete yards, (m) New packaged waste water treatment system and percolation area on site, (n) New metal sheeted fence and gate, (o) New 9m high post and mesh windbreak to rear of wood-picking area AND FOR PERMISSION FOR THE INDEFINITE RETENTION OF (p) Concrete storage bays, (q) A single storey prefabricated staff welfare facility consisting of toilets, showers, canteen and meeting room

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 May 2019

  2. Decision: CONDITIONAL

    5 Jul 2019

  3. Decision due

    9 Jul 2019

  4. Grant issued

    9 Aug 2019

Application Details

Location
Lawlesstown , Clonmel , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
15 May 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
5 July 2019
Grant Date
9 August 2019
Permission Expires
8 August 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

240m
2660517N/A28 May 2026

development which will consist of: The power plant comprising the following main components; Engine Hall comprising up to 6 no. dual fuel gas/diesel IC reciprocating engines and associated generating equipment; 1 no. exhaust stack cluster; Electrical Annex Building; 1 No. 120 MW Step-up transformer; Workshop/Stores Building; Administration Building; Radiator Coolers; Bunded Tank Farm comprising: 2 x Fuel Oil Storage Tank, SCR reagent Tank, Lube Oil Storage Tank, Lube Oil Maintenance Tank, Lube Oil Disposal Tank, Pilot Oil Tank; Cycle shed; Fire pump house, Firefighting water tank; Surface Water Attenuation Tank, Raw Water Storage Tank; Fencing; Car Park; Landscape planting around perimeter of site and all ancillary services

Ard Gaoithe Technology Park , Ard Gaoithe Lawlesstown , Clonmel

288m
2660540N/A3 Jun 2026

a power plant comprising the following main components; Engine Hall comprising up to 6 no. dual fuel gas/diesel IC reciprocating engines and associated generating equipment; 1 no. exhaust stack cluster; Electrical Annex Building; 1 No. 120 MW Step-up transformer; Workshop/Stores Building; Administration Building; Radiator Coolers; Tank Farm comprising: 2 x Fuel Oil Storage Tanks, SCR reagent Tank, Lube Oil Storage Tank, Lube Oil Maintenance Tank, Lube Oil Disposal Tank, Pilot Oil Tank; Standby Generators; Cycle shed; Fire pump house, Firefighting water tank; Surface Water Attenuation Tank; Raw Water Storage Tank; Fencing; Car Park; Landscape planting around perimeter of site and all ancillary services. The plant is subject to a pollution control licence from the EPA

Ard Gaoithe Technology Park , Ard Gaoithe Lawlesstown , Clonmel

312m
22138N/A18 Feb 2022

the proposed development will consist of the construction of 3 no. warehousing/light industrial units (with a floor area of 1029sqm for building 1, a floor area of 1430 sqm for building 2 and a floor area of 1430 sqm for building 3, parking spaces and all associated services. In addition, Flamewell Limited intend to apply for a change of use for the existing cottage on the development from domestic to office use

Ard Gaoithe , Lawlesstown , Clonmel

337m
22174CONDITIONAL1 Mar 2022

the proposed development will consist of the construction of 3 no. warehousing/light industrial units (with a floor area of 1029sqm for building 1, a floor area of 1430 sqm for building 2 and a floor area of 1430 sqm for building 3, parking spaces and all associated services. In addition, Flamewell Limited is to apply for a change of use for the existing 100 square metre cottage, which is a protected structure on the development from domestic to office use. Existing outbuildings and sheds are proposed to be demolished.

Ard Gaoithe , Lawlesstown , Clonmel

342m
22113N/A11 Feb 2022

the proposed development will consist of the construction of 3 no. warehousing/light industrial units (with a floor area of 1029sqm for building 1, a floor area of 1430 sqm for building 2 and a floor area of 1430 sqm for building 3, parking spaces and all associated services. In addition, Flamewell Limited intend to apply for a change of use for the existing cottage on the development from domestic to office use

Ard Gaoithe , Lawlesstown , Clonmel

382m
22689CONDITIONAL21 Dec 2022

the construction of a light industrial Unit which will be sub-divided into 3no units each incorporating two-storey office space. The proposed development will include an access road off the existing Ard Gaoithe Business Park road, roads, yards, carpark area, site fencing, site lighting and all associated siteworks including connection to all existing site services

Ard Gaoithe Business Park , Lawlesstown , Clonmel

390m
2461039CONDITIONAL5 Dec 2024

the construction of a wholesale warehouse including all associated site development works such as yards, carparking areas, fencing, lighting, drainage and access from the existing Ard Gaoithe Business Park road

Ard Gaoithe Business Park , Lawlesstown , Clonmel

398m
2560495CONDITIONAL30 May 2025

the alterations to previously granted permission (PD. Ref: 22689), incorporating the amalgamation of units 1 and 2 and for the change of use from light industrial to warehouse and storage use, together with all associated site development works

Ard Gaoithe Business Park , Lawlesstown Clonmel , Co. Tipperary

444m
2560188CONDITIONAL10 Mar 2025

a) changes to the front, rear and side elevations of the house, b) three domestic sheds (a boiler house, a garden shed and a domestic shed) as constructed, c) the site entrance as constructed, and d) boundary treatments

Giantsgrave , Clonmel , Co. Tipperary

454m
18600783CONDITIONAL20 Jun 2018

to construct a light industrial/warehousing building subdivided internally into 6 no. individual units and all associated site development works to include roads, footpaths, boundary treatments, underground services and connection to existing foul and surface water sewers

Lawlesstown , Cashel Road , Clonmel

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?