19601005
CONDITIONALTipperary - Tipperary County Council
Proposed Development
construction of a single storey extension to the side of existing dwelling house
View the full application file on the council's planning portal →Application Timeline
Application received
12 Sept 2019
Decision: CONDITIONAL
29 Oct 2019
Decision due
6 Nov 2019
Grant issued
3 Dec 2019
Application Details
- Location
- 6 Hillview Crescent , Farranlahassery , Cahir
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 12 September 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 29 October 2019
- Grant Date
- 3 December 2019
- Permission Expires
- 2 December 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
construction of an extension to the side of our building to form a larger bathroom and utility and all associated site works
No. 6 Butlers Court , Clonmel Road , Cahir
construct 8 no. new dwellings including all associated site development works such as entrance, roadways, footpaths, new boundary treatments and connection to underground services as well as the closing up of an existing entrance to an existing neighbouring dwelling and opening a new entrance to the proposed estate roadway as well as providing a foul connection to the same existing dwelling and the decommissioning of the existing septic tank currently serving the existing dwelling
Killeigh , Cahir , Co. Tipperary
construction of 6 no. two storey dwellings, new vehicular entrance onto public access road, connection to public services, carparking, roads, footpaths, pedestrian access, open space areas and ancillary site development works
Farranlahassery , Cahir , Co. Tipperary
construction of 6 no. two storey dwellings, new vehicular entrance onto public access road, connection to public services, carparking, roads, footpaths, pedestrian access, open space areas and ancillary site development works
Farranlahassery , Cahir , Co. Tipperary
the as constructed rear extension and storage shed, including all associated site development works
11 Butler Court , Cahir , Co. Tipperary
as constructed rear extension and storage shed including all associated site development works
11 Butler Court , Cahir , Co. Tipperary
the construction of an extension to the side of dwelling
8 Lake View , Farranlahassery , Cahir Co. Tipperary
construction of a single storey extension (with store behind) to side of our existing dwelling
9 Lakeview Drive , Farranlahassery , Cahir
installation of proposed pitch lighting and all associated site development works
Farranlahassery , Cahir , Co. Tipperary
the Dwelling & Garage as constructed (in lieu of that granted under Planning Ref 98/341) and PERMISSION to extend Dwelling (by increasing the Ground Floor area of the said Garage, conversion of same to residential use and provision of a 1st Floor over)
9 Rosemount Avenue , Cahir , Co. Tipperary
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?