19601275

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

construction of an agricultural entrance and farm roadway, including all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    14 Nov 2019

  2. Decision: CONDITIONAL

    9 Jan 2020

  3. Decision due

    17 Jan 2020

  4. Grant issued

    13 Feb 2020

Application Details

Location
Lisbunny , Nenagh , Co Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
0.263 ha

Timeline

Registration Date
14 November 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
9 January 2020
Grant Date
13 February 2020
Permission Expires
12 February 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

106m
2360573CONDITIONAL29 Jul 2023

the construction of an extension to the rear of existing cottage dwelling with all associated siteworks

Lisbunny , Nenagh , Co. Tipperary

205m
2660208CONDITIONAL6 Mar 2026

the addition of a 51m2 single storey summer house structure with ancillary patio space to the rear of the existing dwelling and adjoining an existing outbuilding

Lisbunny House , Lisbunny , Nenagh Co. Tipperary

215m
18600459CONDITIONAL17 Apr 2018

Extensions and alterations to dwelling, including: the demolition of existing two-storey extension to rear and part of existing shed; the construction of a new two-storey extension to the rear and a single storey extension to the side of the dwelling; alterations and replacement of existing windows; and the installation of a propriety wastewater treatment unit and associated percolation area

Lisbunny , Nenagh , Co. Tipperary

297m
2560195CONDITIONAL11 Mar 2025

the renovation and extension of existing house, demolition of the shed to rear and construction of a garage, and RETENTION Permission for relocation of entrance

Lisbunny , Nenagh , Co. Tipperary

502m
2660145N/A20 Feb 2026

1) the demolition of an existing shed, 2) to renovate and extend existing cottage, 3) to install new wastewater treatment system, 4) to upgrade an existing entrance and all associated site works

Lisbunny , Nenagh , Co. Tipperary

572m
19600266CONDITIONAL22 Mar 2019

alterations to dwelling to include a west side gable extension, full length front porch and pergola, revisions to east side gable and rear elevation and all ancillary works

Rathnaleen South , Nenagh , Co. Tipperary

588m
19600175N/A28 Feb 2019

alterations to dwelling to include a west side gable extension, full length front porch and pergola, revisions to east gable and rear elevation and all ancillary works

Rathnaleen North , Nenagh , Co Tipperary

696m
2360055CONDITIONAL27 Jan 2023

the renovation and extension of existing dwelling

13 Knockalton Cottages , Knockalton Upper , Nenagh Co. Tipperary

700m
2260373CONDITIONAL18 Jul 2022

(a)Refurbishment/Alterations to Existing Two storey detached dwelling, (b)New single storey extensions to Side South-West/ Rear North-East Elevations of existing dwelling, (c)Replacement of existing septic tank and percolation area with new Treatment system & percolation Area, (d)All associated site works/services

Tyone Rathmartin rd Nenagh Co. Tipperary , Nenagh , Co. Tipperary

717m
211329CONDITIONAL6 Sept 2021

demolition of elements of the industrial building and construction of extensions to adapt the existing factory unit for film production. Permission is sought for demolition of: 1. The offices located to the front of the factory building 2. Factory structure sections on the South East and North West side and other sections of the factory building extending above the general factory roofline 3. Pallet storage shed. Permission is sought for: 1. Construction of new 2-storey offices to the front of the factory building 2. 2-Storey replacement extension for actor preparation and dressing areas to the centre Northwest side of the existing factory 3. Extensions to the Northeast side of the factory accomodating 3 film sound stages 4. Advertising signage 5. Upgraded elevation treatments 6. Landscaping and boundary treatments 7. ESB Substation and switchrooms, solar panels, all associated site works 8. General site access improvements into the site from the Lisbunny Industrial Estate road including construction of footpaths and cycle paths, modified vehicular entrances to revised car park with security control cabin (entrance 1) , to actor preparation area (entrance 2) and to truck entrance and associated parking area (entrance 3)

Lisbunny Industrial Estate , Lisbunny , Nenagh Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?