19618
CONDITIONALGalway - Galway County Council
Proposed Development
for the installation of 3 temporary prefabricated classrooms and associated site works. Gross floor space of proposed works 153sqm.
View the full application file on the council's planning portal →Application Timeline
Application received
25 Apr 2019
Further information requested
14 Jun 2019
Further information received
17 Jun 2019
Decision: CONDITIONAL
19 Jun 2019
Decision due
14 Jul 2019
Grant issued
29 Jul 2019
Application Details
- Location
- Rindifin ,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Galway County Council
- Site Area
- 0.62 ha
Timeline
- Registration Date
- 25 April 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 June 2019
- Grant Date
- 29 July 2019
- Permission Expires
- 28 July 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
for the installation of 4 temporary prefabricated classrooms and associated site works. Gross floor space of proposed works 279 sqm.
Rindifin ,
for (1) the construction of an extension to the existing community centre and (2) alterations to the existing community centre to include additional floor area and windows. Gross floor space of proposed works: 344 sqm.
Lavally ,
for the construction of an extension to the existing community center.Gross floor space of proposed works 113.43sqm.
Rindfin & Lavally , Ennis Rd (Lavally) , Gort Co Galway
for the temporary retention of change of use from general purpose room to classrooms. Gross floor space of proposed works 190sqm.
Lavally ,
for: i. The demolition of a 29 sqm. storage shed. ii. the construction of a new carpark with new entrance onto public road, public lighting and all ancillary and associated site works.
Lavally ,
for the Refurbishment and Extension. The proposed development includes the following - i) Construction of a three-storey school extension c.5,878m2 to provide teaching spaces and school support facilities including a three classroom Special Education Unit, ii) Construction of link building connecting the existing school building with three-storey school extension at first floor level, iii) Refurbishment and extension of existing single and two storey school building including part demolition of single storey block to provide central assembly space, iv) Refurbishment and extension of the standalone single-storey building known as ‘The Covid Building’ including modifications to building elevations to provide a multi-use hall and ground floor connection to the adjacent two-storey building known as ‘The Noone Building’, v) Refurbishment and part demolition of standalone two-storey building known as ‘The Noone Building’ including modification to building elevations to provide changing facilities, fitness suite, WC’s and all associated teaching facilities and circulation, vi) Construction of new access roadway and bus set-down including new access to school grounds from Circular Road and relocated entrance to the public playground from the new access roadway, vii)Construction of 5no. multi-use ballcourts, viii) Construction of ESB Sub-Station , ix) New car parking layout to school site including provision for E.V. car parking spaces, x) Relocation of southern boundary wall to playground car parking including removal of existing access to Circular Road and revised playground car parking layout, xi) New boundary treatments to site boundaries, xii) Relocation of 3.no existing temporary accommodation units on site, xiii) Ancillary site works including the formation and landscaping of central courtyard/sensory garden, covered bicycle storage, underground attenuation tank; roof mounted photovoltaic panels; new entrance fencing and gates; hard and soft landscaping and public lighting and associated ancillary site development works. A Natura Impact Statement will be submitted to the planning authority with the application. Gross floor space of proposed works: 5878.00 sqm. Gross floor space of any demolition: 1,156.00 sqm
Rindifin , Gort Community School , Co Galway
for demolition of front porch and rear extension, construction of new two storey extension to rear and new enlarged front porch at 12 St. Colman's Terrace (Gross floor space of works to be demolished: 27.7 sqm; Gross floor space of proposed works: 52.7 sqm)
Gort ,
for development consisting of (1) a standalone building with teaching spaces and wc's providing an approx. area of 512 sqm, (2) minor revisions to existing car parking, (3) all associated ancillary site development works. Gross floor space of proposed works: 512 sqm
Rindifin ,
for development consisting of (1) a standalone building with teaching spaces and wc's providing an approx. area of 512 sqm, (2) minor revisions to existing car parking, (3) all associated ancillary site development works. Gross floor space of proposed works: 512 sqm
Gortstuckanagh ,
for the demolition of existing rear extension and the construction of a new rear two storey extension and associated works. Gross floor space of proposed works: 54.42 sqm. Gross floor space of any demolition: 22.44 sqm
14 St Coleman's Terrace , Ennis Road , Gort Co Galway
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?