The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

1964

UNCONDITIONAL

Galway - Galway County Council

Proposed Development

Permission to construct (1) A single storey crematorium building including reflection room, ceremony room, cremator and other ancillary rooms/services, (2) Memorial garden which includes memorial wall, manmade ponds and walkways at Garbally Demesne, Ballinasloe, Co Galway: Previous PL Ref: 13/9015 and PL37.242683

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Jan 2019

  2. Decision: UNCONDITIONAL

    11 Mar 2019

  3. Decision due

    14 Mar 2019

Application Details

Location
Garbally Demesne ,
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Galway County Council
Site Area
4.14 ha

Timeline

Registration Date
18 January 2019
Status
APPLICATION FINALISED
Decision
UNCONDITIONAL
Decision Date
11 March 2019
Permission Expires
10 March 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

156m
21273CONDITIONAL2 Mar 2021

for development consisting of alteration and additions to an existing dwelling house including: 1. the removal of the existing rear extension and the construction of a new rear extension 2. the removal of the existing sheds and the construction of a new garage and garden shed in the location of one of the existing sheds 3. the provision of 2 No. new bay windows to the front elevation.

Mackney ,

162m
17610CONDITIONAL2 May 2017

for (a) Demolition of existing dwelling house and out buildings. (b) permission sought for dwelling house, domestic garage and associated services. (Gross floor space for demolition works: old dwelling house 122 sqm., + sheds 30 sqm; Gross floor space of proposed works: house 237 sqm, + garage 41.25 sqm.)

Mackney ,

482m
2361CONDITIONAL23 Feb 2023

for the construction of a domestic garage and all associated site works. Gross floor space of proposed works: 53.88 sqm

Garbally Demesne , Mackney , Ballinasloe

533m
2561304CONDITIONAL11 Sept 2025

for Site A involving lands to the north east of Junction 15 on the M6 (east of Garbally Roundabout) and site B involving lands to the east of the R446, at an existing service station (Mackney, Ballinasloe). The proposed development will consist of: Site A (3.98ha) Provision of new electric vehicle charging hub for 36 vehicles (all under canopy measuring 3.22m high and including solar panels over) along with 4 no. EV HGV charging spaces (no canopy). Construction of single storey service station building (1,018.66sq.m) including net retail area of 100sq.m (excluding off-licence), 2 no. food offers, seating area, drive-thru hatch for one of the food offers, coffee dock, toilets, back of house area, along with external storage yard, outdoor play area and outdoor seating area. The maximum height is 11.08m high. All ancillary development including fuel pumps under canopy (5.6m high), underground tanks, vent pipes, HGV fuel pumps (6.7m high), new vehicular entrance off Garbally roundabout, new roundabout junction which will also facilitate future access to the lands to the north, car parking (83 – including staff, family and accessible spaces), cycle parking (16 no. spaces), HGV/Bus parking (13 no. – including 4 no. EV parking spaces), motor cycle spaces (5 no. spaces), drainage infrastructure (including SuDs measures), boundary treatments, hard and soft landscaping (including attenuation pond and bio-retention pond), internal roads, footpaths, dedicated active travel route along the northern boundary of the site from the east to west of the site, outdoor exercise and areas, outdoor picnic areas, brush and jet wash, single storey car wash plant building (12.5sq.m), roof mounted solar panels, signage (free standing [including totem sign] and on-building), single storey bin store (67.5sq.m), single storey substation building (38.23sq.m) and lighting. All associated site and drainage works. Site B (0.19ha) It is proposed to demolish all structures relating to the fuel element of the existing filling station (the fuel pumps, canopy, totem sign) and underground fuel tanks. The existing buildings containing the shop and storage will remain in situ. The car wash facility will be discontinued. A Natura Impact Statement is included with the application.

Mackney Brackernagh(Clancarty) , Site A involves lands to the north east of Junction 15 on the M6 (east of Garbally Roundabout) , Site B involves lands to the east of the R446

575m
171360CONDITIONAL12 Sept 2017

for 1. Demolition of existing service station building, adjoining dwelling, part of rear boundary wall, canopy and fuel dispensing pump islands, decommission existing car wash slab, fuel tanks and associated pipework and to remove associated forecourt equipment; 2. Construction of a new single storey building (321sq.m) compromising of retail area (100sqm) with ancillary off licence use, deli food offer, seating area, toilets, cash room, and ancillary storage and food preparation area. 3. Construction of a new forecourt with canopy, 4. no. fuel dispensing pump islands and associated underground fuel storage tanks; 4. Install 1 No. main ID sign, erect canopy signage and shop fascia signage unit and; 5. Construction of ancillary site features including refuse compound, drainage, over ground fill points to fuel tanks, service bay, parking bays, line marking, directional signage, outdoor seating area and boundary treatments. Gross floor space of proposed works 321sqm., demolition 265sqm

Mackney ,

628m
212335CONDITIONAL10 Dec 2021

to construct a first floor extension (19.75 sqm) to the side of existing dwelling house & for retention permission for existing domestic garage (56 sqm). Gross floor space of proposed works: 19.75 sqm. Gross floor space to be retained: 216 sqm

Brackernagh (Clancarty) ,

646m
2560930CONDITIONAL11 Jul 2025

of an existing single storey dwellinghouse. Gross floor space of work to be retained: 112.75 sqm

Brackernagh(Clancarty) , Ballinasloe , Co. Galway

646m
2560808N/A20 Jun 2025

for an existing Single Storey Dwelling House. Gross floor space of work to be retained: 112.75 sqm

Brackernagh(Clancarty) , Ballinasloe , Co. Galway

671m
201522CONDITIONAL15 Oct 2020

to erect two detached dwelling houses and to construct all ancillary site works to facilitate same. Gross floor space of proposed works: 170.52 sqm

Brackernagh (Clancarty) ,

674m
2560856CONDITIONAL27 Jun 2025

for alterations and additions to the existing dwelling house including; 1. new side and rear extensions, 2. the widening of the existing site entrance and driveway, 3. the conversion of the existing garage & 4. alterations to the fenestration and internal layout of the existing dwelling house, along with all the associated site works. Gross floor space of proposed works 31.61 sqm(extension). Demolition: 4.8 sqm

Garbally Demesne , Ballinasloe , Co. Galway

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?