The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

1968

N/A

Clare - Clare County Council

Proposed Development

for development which consists of the construction of a boat lift area to facilitate the lifting of boats from the harbour by crane and for the construction of an office and visitor welfare building ( Gross Flor Area: 85.3square metres ), as well as all ancillary works necessary to facilitate the proposed development. This application is accompanied by a Natura Impact Statement

View the full application file on the council's planning portal →

Application Details

Location
Knockyclovaun , Killaloe , Co. Clare
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council

Timeline

Registration Date
6 February 2019
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
19104CONDITIONAL14 Feb 2019

for development which consists of the construction of a boat lift area to facilitate the lifting of boats from the harbour by crane and for the construction of an office and visitor welfare building ( Gross Flor Area: 85.3square metres ), as well as all ancillary works necessary to facilitate the proposed development. This application is accompanied by a Natura Impact Statement

Knockyclovaun , Killaloe , Co. Clare

123m
18331REFUSED26 Apr 2018

for change of use from holiday home to dwelling home

36 Fisherman's Walk , Lakeview , Killaloe

181m
2660514N/A11 Aug 2026

to erect 2 dwellinghouses and entrances and connect to existing services and all associated site works

Kincora , Killaloe , Co. Clare

265m
25210CONDITIONAL27 Jun 2025

for the following development: An extension to side of existing dwelling including porch, alterations to existing elevations, removal of existing external wc and detached shed, construction of garage to rear of property and associated site works

Newtown , Killaloe , Co Clare

290m
26214N/A31 Jul 2026

to construct dwelling house, garage, wastewater treatment system, percolation area, entrance and all associated site works

Ballyvally , Killaloe , Co. Clare

307m
20159CONDITIONAL5 Mar 2020

1. to RETAIN increase in floor area of extension to existing dwelling previously permitted under planning ref 08/1111 2. Conversion of existing detached domestic garage to a self-contained granny flat, single storey extensions to front elevation of existing detached domestic garage, construction of new detached domestic garage, relocation of existing log cabin elsewhere on the application site, connection to necessary services together with all associated incidental and site works

Knockyclovaun , Killaloe , Co Clare

313m
17192CONDITIONAL16 Mar 2017

for development which will consist of the refurbishment of three existing structures on this site, Building 1, Building 2 and Building 3. The works to Building 1, the dwelling house, will consist of the construction of an extension to the side and rear. New entrance gates and piers are to be constructed together with all ancillary site works

Knockyclovaun , Killaloe , Co. Clare

318m
18988CONDITIONAL3 Dec 2018

for development comprising (a) construction of part two storey part single storey over basement dwelling house, (b) connection to existing public foul water sewer, (c) relocation of entrance gate and piers, (d) alterations to existing access road within site and (e) all ancillary site works

Newton House , Knockyclovaun , Killaloe

328m
2560123N/A12 Mar 2025

to erect a dwellinghouse with garage at basement level together with all ancillary site development works and services

Knockyclovaun , Killaloe , Co. Clare

348m
18620REFUSED31 Jul 2018

for the installation of new electronic metal security gates for vehicular traffic, including electronic pedestrian security gate at existing site entrance to Harbour Village Apartment and Marina from public road ( R463), including new raised concrete road area, new raised footpaths, new metal railings to side boundaries; new surface water connection to existing surface water drainage within the site; new entrance signage, and associated site works

Harbour Village , Killaloe , Co. Clare

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?