19696

CONDITIONAL

Kilkenny - Kilkenny County Council

Proposed Development

for (a) Construction of new disabled ramp at entrance, (b) painting of existing shop front fascia and pilasters, (c) replacement of existing signage with new halo/illuminated signage, and (d) minor internal modifications (a protected structure) at

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    27 Sept 2019

  2. Further information requested

    20 Nov 2019

  3. Further information received

    5 Dec 2019

  4. Decision: CONDITIONAL

    7 Jan 2020

  5. Decision due

    10 Jan 2020

  6. Grant issued

    7 Feb 2020

Application Details

Location
31 Patrick Street , Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
0.017 ha

Timeline

Registration Date
27 September 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
7 January 2020
Grant Date
7 February 2020
Permission Expires
6 February 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

20m
2460149CONDITIONAL27 Mar 2024

for alterations to the existing hotel building located in an Architectural Conservation Area. The development will consist of: (1) alterations at basement floor level to provide hotel administration offices and staff facilities in the former bar space; (2) alterations at ground floor level to convert the existing covered smoking area adjoining the bar for use as a coffee dock including provision of take out service with customer access via the existing door and gate opening onto Patrick Street, including existing smoking area shelter roof replacement by a new roof within the existing walls; (3) alterations at third floor level to convert hotel administration offices and 2 bedroom suites to 5 individual bedrooms; and (4) all associated works.

Kilkenny Hibernian Hotel , 33 Patrick Street Lower/1 Ormonde Street , Kilkenny

35m
2660501N/A10 Aug 2026

for change of use from garage/store in former carriageway to retail food outlet to include: (1) replacement of existing solid external double doors and solid panel over with new painted glazed shopfront double doors and glazed panel over, (2) hand painted signage to glazed panel over and (3) a retractable traditional canvass canopy incorporating printed signage

Berkeley House , 5 Patrick Street , Kilkenny

40m
20282CONDITIONAL7 May 2020

to erect an awning at first floor level of the street elevation of Number 2, Patrick Street, a protected structure Reg. No, 12001057

Number 2 Patrick Street , Kilkenny

41m
19354CONDITIONAL24 May 2019

Change of use of Ground Floor from retail to licensed restaurant together with 2 new connections to the adjoining property at No 2 Patrick, plus alterations to the existing shopfront to include a canopy at No 3 Patrick Street, Kilkenny which is a protected structure

No 3 Patrick Street , Kilkenny

52m
19818REFUSED31 Oct 2019

for the erection of assorted signage to both the Patrick Street and Parade elevation of the Left Bank premises, a protected structure

The Left Bank , The Parade , Kilkenny

52m
18620CONDITIONAL18 Sept 2018

for the addition of 46sq.m. deck and access lobby of 24sq.m. and associated plant works at roof level to be ancillary to 2nd floor restaurant use and the addition of stairs and to extend the lift shaft at second floor level to access the roof level of the 'Left Bank' building (no. 2 The Parade, Kilkenny which is a protected structure)

No. 2 The Parade , Kilkenny

52m
20494CONDITIONAL31 Jul 2020

for the following development. The proposed development will consist of the erection of signage of varying format to both the Patrick Street and Parade elevations of The Left Bank premises, a protected structure

The Left Bank , The Parade , Kilkenny

64m
1731CONDITIONAL26 Jan 2017

for the removal and replacement of existing corporate signage with new corporate signage on existing AIB building which is a Protected Structure (Ref:B46) and (Ref:B47), and is also in the Kilkenny City Centre Architectural Conservation Area

AIB Bank , 3-4 High Street , Kilkenny

70m
20514CONDITIONAL7 Aug 2020

at a Protected structure. The development will consist of internal alterations at Ground Floor and First Floor level to include relocation of canteen, reconfiguration of partitions, subdivision of the eastern front and rear rooms. Provision of secondary glazing to existing windows to North-North east Elevation. Removal of existing curved partitions. Replacement of existing canteen glazing with slate roof with 4 no. Velux's. Reconfiguration of first floor rooms, signage to windows to North-Northeast façade and all associated site works

No. 4 , The Parade , Kilkenny

80m
2460278CONDITIONAL14 Jun 2024

for development at the corner of Pennyfeather Lane and Pudding Lane, Kilkenny. The proposed site is within the City Centre Architectural Conservation Area and NIAH Ref No. KK019-026212 is within the application site. The development will consist of: (a) clearance works on a 0.059ha site including the demolition of the existing restaurant building; (b) the construction of a six-storey hotel with setback 4th-floor level and plant room at the 5th-floor level, comprising 67no. ensuite bedrooms, hotel foyer/ reception, bar and restaurant facilities, staff facilities, and hotel service facilities; (c) vehicle set-down areas off Pudding Lane and Pennyfeather Lane; (d) 12 no. bicycle parking spaces; and (e) landscaping, drainage works; and all associated site development works to facilitate the development

The corner of Pennyfeather Lane and Pudding Lane , Kilkenny , Co. Kilkenny