The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

19710

CONDITIONAL

Limerick - Limerick County Council

Proposed Development

development of a six storey building comprising of 31 student apartment units (143 student bed spaces) & all associated auxiliary rooms. Medical Centre of 366.72 sq.m. Provision of 20 car parking spaces & secure bicycle storage. Demolition of existing bungalow & public house. Modifications to front site boundary wall and entrance and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Jul 2019

  2. Further information requested

    10 Sept 2019

  3. Further information received

    14 Feb 2020

  4. Decision due

    12 Aug 2020

  5. Decision: CONDITIONAL

    12 Aug 2020

  6. Appeal submitted

    7 Sept 2020

  7. Appeal decided: CONDITIONAL

    15 Mar 2021

Application Details

Location
Hassett's Cross , Limerick.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council
Floor Area
4453.8 sq m
Residential Units
5

Timeline

Registration Date
18 July 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
12 August 2020
Permission Expires
14 March 2026

An Coimisiún Pleanála Appeal

Appeal Reference
ABP-308109-20
Decision
CONDITIONAL
Submitted
7 September 2020
Decided
15 March 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

5m
19632N/A28 Jun 2019

development of a six storey building comprising of 31 student apartment units (143 student bed spaces) & all associated auxiliary rooms. Medical Centre of 366.72 sq.m. Provision of 20 car parking spaces & secure bicycle storage. Demolition of existing bungalow & public house. Modifications to front site boundary wall and entrance and all associated site works

Hassett's Cross , Limerick.

15m
257041CONDITIONAL23 Dec 2025

Extension of Duration for Planning Ref. No. 21/1820: change of use from Medical Centre previously granted under permission ref. 19/710 to 19no. student spaces of 507.6sqm on ground floor. Provision of 12no. car parking spaces and relocated bin & bicycle storage and all associated site works

Hassett's Cross , Limerick.

17m
211820CONDITIONAL23 Dec 2021

change of use from Medical Centre previously granted under permission ref. 19/710 to 19no. student spaces of 507.6sqm on ground floor. Provision of 12no. car parking spaces and relocated bin & bicycle storage and all associated site works

Hassett's Cross , Limerick.

114m
19939REFUSED19 Sept 2019

(a) demolition and rebuilding of an existing flat roof annex to the side of existing dwelling and (b) replacement of flat roof with a pitched roof together with revisions to the front elevation including all associated site works

15 Mayorstone Crescent , Mayorstone , Limerick.

117m
19686CONDITIONAL11 Jul 2019

construction of an extension to the rear of the dwelling, dormer attic conversion with 2 no. windows to the rear elevation to create office/storage area, and all associated site works

21 Killeely Road , Limerick.

122m
18745N/A23 Jul 2018

and completion of the demolition and rebuilding of existing flat roofed annex to side of existing dwelling and the replacement of the substandard flat roof with a pitched roof structure together together with amendments to the front elevation together with all associated incidental and site works

15 Mayorstone Crescent , Limerick.

125m
228014CONDITIONAL3 Aug 2022

development works from TUS Moylish Campus to the City. Segregated cycle lanes and footpath upgrades along Cratloe Road, Sexton Street North and High Road with a number of dedicated pedestrian and cycle crossing facilities. Upgrade of the traffic signals and junction layout at Hassett's Cross, Cross Road and Belfield Court Junctions to provide a protected junction arrangement for cyclists & bus priority measures of public transport. An inbound bus lane extending along Cratloe Road from Moylish Roundabout to Hassett's Cross. Traffic calming measures on Belfield Court and Belfield Gardens such as raised table junctions and build out with cycle by-pass. Upgrade works to bus stops, side road junctions and new road surfacing. Installation of LED public lighting. Surface water drain works. Landscaping works including tree removal & tree planting and all associated site works

Cratloe Road Sexton Street North , High Road Belfield Court and Belfield Gardens , Limerick

133m
2560921CONDITIONAL15 Sept 2025

(1) the erection of a two storey modular building to provide 4no. classrooms and 2no. SEN Rooms, (2) the construction of a 100sqm soft play area with perimeter fencing and 400sqm hardstanding play yard; (3) the construction of new external ramped and stepped access routes with hard standing area, and (4) all other associated site development works, including all foul and surface water drainage works

Gaelscoil Sairseal , Shelbourne Road , Limerick

134m
22596CONDITIONAL27 May 2022

the construction of a single and two storey extensions to our existing dwelling house. This application also seeks permission for necessary demolitions, extensions at ground and first floor levels, re-modelling within existing dwelling, revisions to existing elevations, thermal upgrading, window and door replacement, services connections and all ancillary site works

13 Mayorstone Crescent , Limerick

144m
2461128CONDITIONAL15 Nov 2024

construction of a new end of terrace dwelling to the side of an existing dwelling, removal of existing front boundary wall & gates, modification & subdivision of an existing shed, sub-division of the existing site, mains sewer & water connection & all ancillary site works

14 Cregan Avenue , Killeely , Limerick

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?