← Back to search

No. 1 The Arches , Gas House Lane , Kilkenny

CONDITIONAL

Planning application 19712

Kilkenny - Kilkenny County Council

Proposed Development

for a material change of use of an existing retail unit to restaurant use at this site situated

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Oct 2019

  2. Further information requested

    22 Nov 2019

  3. Further information received

    22 Sept 2020

  4. Decision: CONDITIONAL

    16 Oct 2020

  5. Decision due

    19 Oct 2020

  6. Grant issued

    18 Nov 2020

Application Details

Location
No. 1 The Arches , Gas House Lane , Kilkenny
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Kilkenny County Council
Site Area
0.023 ha

Timeline

Registration Date
2 October 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
16 October 2020
Grant Date
18 November 2020
Permission Expires
17 November 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
25130REFUSED10 Dec 2025

of Planning Permission Reference P19/712

No 1 The Arches , Gas House Lane , Kilkenny

40m
20249CONDITIONAL22 Apr 2020

for 1. Change of use from office / service use to retail use, 2. Part off-licence use, and 3. Associated works to internal fit-out and external elevation, all at his premises

Unit 3 John's Gate , Castlecomer Rod , Pennefeatherslot

68m
21421CONDITIONAL17 May 2021

for alterations to the existing shopfront design to provide openable sections consisting of Bi-folding doors, 2 no recessed sections to make provision for outdoor seating, a new retractable awning, new signage and external lighting

Aran Bakery , Unit 8 The Arches , Barrack Street

69m
22507CONDITIONAL3 Aug 2022

for (i) the demolition of existing gantry, fuel dispensers and above ground tanks no 6 and 7. (ii) revision to the internal site layout to include new vehicular movement arrangements, relocated existing tank farm bund walls, access stairs/walkways, offset fill points, top and bottom loading pump systems. (iii) Construction of a new forecourt fuel area with 2no. pump dispensers, a new 5,000lt above ground Ad-Blue tank, 3no. car parking spaces, 2no. HGV/tanker parking spaces. (iv) Proposed reconfiguration of the existing office/storage building internal layout, with a new single storey building extension and external seating area to the southern side. (v) All other associated underground and overground infrastructure, drainage, lighting, landscaping and site development works.

Jones Oil , Castlecomer Road , Kilkenny

69m
2560419CONDITIONAL10 Jul 2025

for development at this site. The proposed development consists of the following: • 1no c19.5m2 Single Storey Extension for storage uses to southern face of existing single storey office and storage building. Plus internal alterations to increase existing office area from c29m2 to c78.6m2 and external alterations to existing building’s façades. • Removal and replacement of existing Main ID sign with 1no new c5.0m Main ID signage structure. • Demolition and replacement of the following: a. Existing c28m2 gantry structure removed and replaced with new forecourt canopy and PV panels, b. 4no overground tanks and part of existing bund walling and stairways removed and replaced with 2no new overground tanks and revised bund walling layout/stairways, c. 3no existing fuel dispensers removed and replaced with 2no new dispensers under new canopy, d. Existing road facing boundary fencing removed and replaced with new c2.4m high palisade fence, separate pedestrian/vehicular entrance and exit gates, and c2.1m high masonry infill wall between existing office and adjacent dwelling. • New service area with 1no car parking spaces and air/water unit. • Existing 8am-8pm Monday to Sunday trading hours changed to 7am-10pm Monday to Sunday. • All other associated underground/overground infrastructure, decommissioning, drainage, lighting, line marking, landscaping, and site development works

Certa Service Station , Castlecomer Road , Kilkenny Co. Kilkenny

73m
2460196CONDITIONAL29 Apr 2024

for the change of use from existing therapy clinic to a walk in clinic and all associated site development works

Unit 7 John's Gate , Barrack Street , Kilkenny

79m
17783REFUSED27 Nov 2017

for the change of use of ground floor vacant retail unit into recreation, sport, amusement arcade with ancillary signage centre

Unit 8 , St John's Gate , Barrack Street

79m
21724CONDITIONAL23 Aug 2021

for the change of use of ground floor vacant retail unit into recreation, sport, amusement arcade with ancillary signage

Unit 8 , St. John's Gate , Barrack Street

79m
21671N/A4 Aug 2021

for the change of use of ground floor vacant retail unit into recreation, sport, amusement arcade with ancillary signage

Unit 8 , St John's Gate , Barrack's Street

81m
17320CONDITIONAL16 May 2017

retention planning permission for continued placement of an ESB transformer in an archway under the disused railway bridge, a protected structure. (previous grant or temporary planning permission ref: 11/59). John's Green is located within the Michael St/Wolfe Tone St. Architectural Conservation Area. Former Railway Via duct, c.1865, John's Green, is a protected structure RPS Ref: Bill and listed on the NIAH Main Record (12000196)

John Green , Kilkenny

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?
No. 1 The Arches , Gas House Lane , Kilkenny - Planning Application 19712 | Permission.ie