The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

19718

CONDITIONAL

Clare - Clare County Council

Proposed Development

to upgrade an existing agricultural entrance to a Forest Road Bellmouth to facilitate timber harvesting, haulage operations and associated site works to existing forestry lands

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    12 Sept 2019

  2. Further information requested

    30 Oct 2019

  3. Further information received

    15 Nov 2019

  4. Decision: CONDITIONAL

    6 Dec 2019

  5. Decision due

    12 Dec 2019

  6. Grant issued

    16 Jan 2020

Application Details

Location
Tooreen , Miltown Malbay , Ennis
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Clare County Council

Timeline

Registration Date
12 September 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
6 December 2019
Grant Date
16 January 2020
Permission Expires
15 January 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

372m
2460252CONDITIONAL30 May 2024

to extend and renovate the existing dwelling house along with elevation changes to the house and to construct a new wastewater treatment system along with all associated site works and services

Tooreen , Miltown Malbay , Co. Clare.

602m
221019CONDITIONAL9 Nov 2022

to construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works

Tooreen , Miltown Malbay , Co Clare

602m
2660032CONDITIONAL26 Jan 2026

to alter the planning drawings granted under P22/1019 along with ancillary site works

Tooreen , Miltown Malbay , Co. Clare

729m
24154CONDITIONAL10 May 2024

for the development of a domestic garage ancillary to dwelling house granted permission under planning reference P23/617 together with ancillary site works

Ballynew , Miltown Malbay , Co Clare

729m
23617CONDITIONAL8 Dec 2023

the development will consist of a dwelling house with proprietary wastewater treatment system and polishing filter, new entrance at public road and upgraded access way along existing agricultural track together with ancillary site works

Ballynew , Miltown Malbay , Co Clare

742m
23566N/A10 Nov 2023

for development which will consist of a dwelling house with proprietary wastewater treatment system and polishing filter together with ancillary site works

Ballynew , Miltown Malbay , Co. Clare

839m
17415CONDITIONAL29 May 2017

To RETAIN 2 No French doors and existing balcony to rear elevation and to install a new balcony to rear of dwelling.

Slievenalicka , Miltown Malbay , Co Clare

1.0km
18521CONDITIONAL28 Jun 2018

to construct an extension on the Northwest side of the existing school consisting of a G.P. Hall and ancillary site works

Slievenalicka , Miltown Malbay , Co Clare

1.0km
20793CONDITIONAL30 Oct 2020

the development will consist of the replacement of existing substandard dwelling with a new dwelling house and the replacement of existing septic tank with a proprietary wastewater treatment system and polishing filter together with ancillary works

Slievenalicka , Miltown Malbay , Co Clare

1.0km
2560520REFUSED27 Aug 2025

for the development of Illaunbaun Wind Farm in the townlands of Tooreen, Slievenalicka, Illaunbaun, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 5 wind turbines with a maximum overall blade tip height of 150 m. • Construction of associated turbine foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm. • Two borrow pits. • Three peat repository areas for peat & spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent & Temporary tree felling to accommodate the construction & operation. • Signages and • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes x No The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) & Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the planning authority with the application.

Tooreen , Slievenalicka Illaunbaun , Drumbaun and Lackamore Co Clare