19718
CONDITIONALClare - Clare County Council
Proposed Development
to upgrade an existing agricultural entrance to a Forest Road Bellmouth to facilitate timber harvesting, haulage operations and associated site works to existing forestry lands
View the full application file on the council's planning portal →Application Timeline
Application received
12 Sept 2019
Further information requested
30 Oct 2019
Further information received
15 Nov 2019
Decision: CONDITIONAL
6 Dec 2019
Decision due
12 Dec 2019
Grant issued
16 Jan 2020
Application Details
- Location
- Tooreen , Miltown Malbay , Ennis
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Clare County Council
Timeline
- Registration Date
- 12 September 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 6 December 2019
- Grant Date
- 16 January 2020
- Permission Expires
- 15 January 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to extend and renovate the existing dwelling house along with elevation changes to the house and to construct a new wastewater treatment system along with all associated site works and services
Tooreen , Miltown Malbay , Co. Clare.
to construct a dwelling house, garage and proprietary waste water treatment system along with ancillary site works
Tooreen , Miltown Malbay , Co Clare
to alter the planning drawings granted under P22/1019 along with ancillary site works
Tooreen , Miltown Malbay , Co. Clare
for the development of a domestic garage ancillary to dwelling house granted permission under planning reference P23/617 together with ancillary site works
Ballynew , Miltown Malbay , Co Clare
the development will consist of a dwelling house with proprietary wastewater treatment system and polishing filter, new entrance at public road and upgraded access way along existing agricultural track together with ancillary site works
Ballynew , Miltown Malbay , Co Clare
for development which will consist of a dwelling house with proprietary wastewater treatment system and polishing filter together with ancillary site works
Ballynew , Miltown Malbay , Co. Clare
To RETAIN 2 No French doors and existing balcony to rear elevation and to install a new balcony to rear of dwelling.
Slievenalicka , Miltown Malbay , Co Clare
to construct an extension on the Northwest side of the existing school consisting of a G.P. Hall and ancillary site works
Slievenalicka , Miltown Malbay , Co Clare
the development will consist of the replacement of existing substandard dwelling with a new dwelling house and the replacement of existing septic tank with a proprietary wastewater treatment system and polishing filter together with ancillary works
Slievenalicka , Miltown Malbay , Co Clare
for the development of Illaunbaun Wind Farm in the townlands of Tooreen, Slievenalicka, Illaunbaun, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 5 wind turbines with a maximum overall blade tip height of 150 m. • Construction of associated turbine foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm. • Two borrow pits. • Three peat repository areas for peat & spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent & Temporary tree felling to accommodate the construction & operation. • Signages and • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes x No The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) & Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the planning authority with the application.
Tooreen , Slievenalicka Illaunbaun , Drumbaun and Lackamore Co Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?