19723
CONDITIONALClare - Clare County Council
Proposed Development
to change use of apartment to office and to integrate it into existing office
View the full application file on the council's planning portal →Application Timeline
Application received
16 Sept 2019
Decision: CONDITIONAL
25 Oct 2019
Decision due
10 Nov 2019
Grant issued
25 Nov 2019
Application Details
- Location
- No.7 Springfield Court , Victoria Terrace , Ennis
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Clare County Council
- Floor Area
- 60.3 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 16 September 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 25 October 2019
- Grant Date
- 25 November 2019
- Permission Expires
- 24 November 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to change use of existing building from commercial to residential use (b) construct rear extension and carry out renovations and alterations to existing building together with all ancillary site development works and services
3 St Anthony's Terrace , Harmony Row , Ennis Co. Clare
for development at Harmony Row, Lifford, Ennis, County Clare. The site is located in an Architectural Conservation Area. The development consists of thermal and energy upgrade works to 1970s building comprising the installation of insulation and external render to the facades and PV cells and heat pumps on the roof
Harmony Row , Lifford , Ennis Co Clare
to alter and extend the Outbuildings/Mews to provide for a new ground floor storage area along with associated site works. The works involve a) replacing the front wall with a new wall having a new garage door and windows, b) constructing a new roof, c) constructing a new extension to the rear of the new front wall with external stair access. This property is in an Architectural Conservation Area
Bindon Street , Ennis , Co. Clare
to alter and extend the Outbuildings / Mews to provide for a new ground floor garage area and first floor storage area along with associated site works. The works involve a) replacing the front wall with a new wall, having a new garage door and windows. b) to construct a new roof, c) to construct a new rear extension with external stairs access. This property is within the curtilage of a Protected Structure RPS No: 721 and it is also located in an Architectural Conservation Area
No. 8 Bindon Street , Ennis , Co. Clare
for the redevelopment of two existing office building units into one building for the purpose of provision of an educational facility. The proposed development will include a) The amalgamation of the two existing buildings into one building, b) The change of use of the existing office units to educational use with ancillary office space, c) Alterations to the internal layout, installation of a platform lift within a new entrance foyer and a new door off Bindon Street, the North West building elevation, d) Alterations to the existing adjacent public footpath ( Bindon Street ) to provide 2 no. wheelchair accessible car parking spaces including the provision of level access to the proposed new entrance door, e) The installation of associated signage, f) All ancillary site works
Bindon Court , Harmony Row & I Bindon Street , Lifford Ennis
for a) the removal of 12 lighting poles and associated lighting, b) installation of 15 new poles and associated lighting and c) all associated site works
Mill Road , Cornmarket Street , Ennis
to construct a single-storey extension to the rear and side of the dwelling house
Sandfield House , Sandfield Park , Ennis Co. Clare
to extend existing dental practice at basement level into ground floor level, which will require a change of use of existing vacant offices to dental practice together with all ancillary internal works and external works required to facilitate the proposed development at No. 4 Bank Place, Ennis. This property is a Protected Structure (RPS No: 708) located within an Architectural Conservation Area.
4 Bank Place , Ennis , Co. Clare
to demolish an existing derelict dwelling, at a site West of The Rowan Tree Hostel
Harmony Row , Ennis , Co Clare
for development at this site (c. 0.54 ha) in Harmony Row / Bank Place / Bindon Lane, Ennis. The development will consist of: 1. The demolition of existing derelict house structure and walls within the site and the construction of a new three-storey (over basement) retail store with a total gross floor area of c. 3,550 sqm. including ancillary uses comprising staff area, stockroom, plant rooms and other ancillary areas. 2. A separate sub-station building of c. 22 sqm. gross floor area, loading dock, delivery yard and new heavy goods vehicular entrance off Harmony Row. 3. Alterations and re-arrangement to the existing car park area serving the Bank of Ireland (Protected Structure) off Bindon Street / Bindon Lane. 4. Construction of a new public riverside pedestrian walkway from Bank Place to the existing pedestrian bridge over the river Fergus, connecting to the existing pedestrian path from Harmony Row including new ramps and steps, modifications to the walkway of the existing pedestrian bridge including modifications and additions to the existing ramps and steps in the Abbey Street public car park and modifications to the bridge stone wall at Bank Place. 5. All associated site works including site clearance, boundary treatment, associated external / public lighting, internal pathways, storage rooms, bin stores, hard and soft landscaping. The planning application is supported by a Natura Impact Statement (NIS).
Harmony Row / Bank Place/ , Bindon Lane , Ennis Co Clare
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?