The Register of Planning Applications · Éire

Sunday 30 August 2026

← Back to search

19730

UNCONDITIONAL

Galway - Galway County Council

Proposed Development

for Retention of existing loft conversion at northern wing of existing house including four velux windows (northern elevation) and retention of change of use at southern wing of existing house from a multi-purpose family room to Baptist meeting room. This application includes new external boiler house, new dormer window/access door to the north side with access door to garden terrace, insertion of three new combi-velux windows (southern elevation) and upgrade of existing effluent treatment system (gross floor space 334 sqm). Previous Planning Application 13/1321

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 May 2019

  2. Decision: UNCONDITIONAL

    8 Jul 2019

  3. Decision due

    9 Jul 2019

Application Details

Location
Furbogarve Furbo ,
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Galway County Council
Site Area
0.32 ha

Timeline

Registration Date
15 May 2019
Status
APPLICATION FINALISED
Decision
UNCONDITIONAL
Decision Date
8 July 2019
Permission Expires
7 July 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

126m
191746REFUSED7 Nov 2019

to construct 9 number detached 2 storey dwellings and garages with individual treatment plants and percolation areas. The application is also to include demolition of the existing house, shed and the removal of the road access on this site close to the main road R336 and the construction of a roadway and green area as a continuation of an estate roadway from the adjoining existing housing development. The permission is to include all landscaping and associated site services including storm water drainage and public lighting. Gross floor space of proposed works: 9 and houses and 7 detached garages, 2 attached garages - Houses 1,2,3 = 235 sqm, Houses 4,5,6 = 252 sqm and houses 7,8 = 256 sqm, House 9 = 213 sqm, all detached garages = 28.1 sqm

Na Forbacha Garbha ,

127m
19578REFUSED18 Apr 2019

for the construction of a new two storey house and single storey shed, new waste water treatment system, relocation and upgrade of existing site entrance and all associated site works. The site is located within the curtilage of Carraig Mór house which is a protected structure. Gross floor space of proposed works: 160 sqm

Na Forbacha Garbha ,

143m
2660921CONDITIONAL8 Jun 2026

1) in ionad an leagain amach den bhealach isteach a ceadaíodh roimhe seo. 2) Cead chun an Corás searachas agus an limistéar síothlúcháin atá ann cheana a choinneáil ina suíomh athbhreithnithe, seachas mar a ceadaíodh sa bhunchead pleanála. 3) Cead chun na hathruithe ar aghaidh an tí a choinneáil, seachas mar a ceadaíodh sa bhunchead pleanála. 4) Cead chun spás áiléir an chéad urláir a athrú isteach ina spás chónaithe, mar aon leis na hoibreacha suímh uile a bhaineann leis sin

Na Forbacha Garbha , Na Forbacha , Co na Gaillimhe.

173m
19335REFUSED11 Mar 2019

chun teach cónaithe, córas séarachas, forbairt cheart slí ceart slí ar bhóthar rochtaine, garáiste agus oibreacha láthreán gaolmhara cuí a thógáil. Spás urláir comhlán na n-oibreacha beartaithe: 229 sqm - Teach - 211 sqm, Garáiste - 18 sqm

Forbacha Garbha ,

181m
1833N/A17 Jan 2018

chun teach nua cónaithe a thógail chomh maith garáiste nua, le córás searachais nua agus uasghradrú ar an bother isteach chuig an suíomh (gross floor area 240.7sqm & 54sqm)

Na Forbacha ,

187m
191341CONDITIONAL28 Aug 2019

for alterations to an existing bungalow with first floor inhabited roof space, the construction of a new single storey extension with roof terrace over, to the south end of the existing dwelling house, the construction of a new single storey extension to the north end of the existing dwelling house, the construction of a first floor dormer extension of the roof space to the rear of the existing dwelling house, together with all associated site services and site works. Gross floor space of proposed works: 76.7 sqm. Gross floor space of work to be retained: 337 sqm

Cnoc na Gréine ,

223m
17737CONDITIONAL25 May 2017

chun teach nua conaithe a thógail chomh maith gáraiste nua agus le córás searachais nua. (Spás urláir comhlan na n-oibreacha beartaithe: 224.4 sqm, & 54 sqm.

Cnoc na Gréine ,

224m
24265REFUSED12 Sept 2024

chun síneadh a thógáil ag an teach conaithe atá ann, chomh maith le hathruithe suímh gaolmhara agus le córas séarachais nua. Spás urláir comhlán na n-oibreacha beartaithe: 152.00 sqm

Coisméig Mór , Na Forbacha , Co. Na Gaillimhe

279m
25334REFUSED5 Dec 2025

for change of use from part of an existing dwelling house to a physio room including all associated site works

Coisméig Mór , Furbo , Co Galway

326m
2561237CONDITIONAL3 Sept 2025

for a new dwelling house, storage shed, and installation of a new wastewater treatment system and associated polishing filter bed. Existing agricultural access to be upgraded to serve dwelling, and all associated site services and landscaping works

Cnoc na Greine , Furbo , Co Galway

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?