19765
N/AGalway - Galway County Council
Proposed Development
for the construction of a cultural pursuit centre and 8 No. holiday houses, together with associated access road, parking, services connections, sewage treatment plant to replace existing, imported percolation area and all associated site works. A Natura Impact Statement has been prepared in respect of the proposed development. Gross floor space of proposed works: 2917 sqm
View the full application file on the council's planning portal →Application Timeline
Application received
20 May 2019
Further information requested
12 Jul 2019
Application withdrawn
28 Jan 2020
Application Details
- Location
- Killeany ,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Galway County Council
- Site Area
- 0.97 ha
Timeline
- Registration Date
- 20 May 2019
- Status
- DEEMED WITHDRAWN
- Decision
- N/A
- Withdrawn
- 28 January 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
of garden shed and art studio to the rear of dwelling house. Gross floor space of work to be retained: 17.25 sqm (garden shed) & 12.30 sqm (art studio)
Cill Éinne , 5 The Cottages Kilronan Inis Mor Aran Islands , Co. Galway
chun athchóiriú a dhéanamh ar Ionad Oidhreachta Árann i gCill Rónáin, Inis Mór, Co. na Gaillimhe, ar déanmhas é atá faoi chosaint (Tagairt 0774 sa Taifead ar Dhéanmhais Chosanta). Áireofar ar na hoibreacha atá beartaithe, modhnuithe inmheánacha chun oibreacha a chur i gcrích ar an gcaifé agus ar an ionad cuairteoirí, painéil fhótavoltacha a sholáthar, Córas Cóireála Fuíolluisce pacáistithe a chur in ionad an umair sheiptigh agus an scagaire snasaithe atá ann cheana, múrphictiúr a sholáthar ar an taobh thiar den fhoirgneamh agus gach obair láithreáin ghaolmhar. Tá Ráiteas Tionchair Natura (NIS) ullmhaithe agus beidh sé á chur ar aghaidh in éineacht leis an Iarratas Pleanála
Cill Éinne , Aran Heritage Centre Cill Rónain , Inis Mór
Cead le haghaidh innsealbhú 34 painéal fótavoltach gréine mar aon leis na hoibreacha a bhaineann leo ar an bhfoirgneamh ag Ionad Fiontair Chollm Ó hIaráin. Spás urláir comhlán na n-oibreacha beartaithe; 56.5sqm. Spás urláir comhlán na hoibre atá le coinneáil i 392 sqm.
Cill Rónáin , Inis Mór
of alterations to the footprint and elevations of a campsite toilet facility previously granted under application 14/1410. 2) Change of use of a campsite workshop building (previously granted under application 14/1410) to a patrons self catering kitchen facility. 3) Retention of a reception building being constructed in lieu of a self contained prefabricated reception unit and roofed barbeque area (previously granted under application 14/1410).
Kilronan ,
for a development consisting of: Loft conversion of a dining facility building on a campsite to create a self-contained staff accommodation apartment. With connection to existing services including an existing sewage treatment plant. Gross floor space of proposed works: 72 sqm
Killeany ,
of extension to existing service building/diesel generator room and storage room and new sewage pump house building for existing treatment plant all ancillary to existing campsite usage (Pl. Ref. No. 141410). Gross floor space of work to be retained: 82 sqm
Cill Éinne , Frenchman's Beach , Kilronan
for a development to consist of: demolition of an existing commercial building (bike hire) and construction of a new commercial building (bike hire). Gross floor space of proposed works 141m2., demolition 57m2
Kilronan ,
for alterations to a previously granted Planning Permission (Ref. No. 18/94) for the demolition of an existing commercial building (bike hire) and the construction of a new commercial building (bike hire). Alterations to consist of : construction of a basement store as part of the new building. Gross floor space of proposed works: 190 sqm. Gross floor space of any demolition: 57 sqm.
Kilronan ,
for development to consist of demolition of an existing commercial building (bike hire) and construction of a new commercial building (bike hire) (gross floor space proposed 441sqm, demolition 57m2)
Kilronan ,
of a covered storage area to the rear of the existing bike hire building pl. ref; (18/94). Gross floor space of work to be retained: 86.56 sqm
Cill Éinne , Inis Mór , Aran Islands
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?