1988
CONDITIONALMayo - Mayo County Council
Proposed Development
CARRY OUT ALTERATIONS TO AN EXISTING SHOP AND RESIDENTIAL ACCOMMODATION, TO INCLUDE A NEW PITCHED ROOF AND A PEDESTRIAN ACCESS ONTO JAMES STREET CAR PARK
View the full application file on the council's planning portal →Application Timeline
Application received
14 Feb 2019
Further information requested
8 Apr 2019
Further information received
29 Apr 2019
Decision: CONDITIONAL
23 May 2019
Decision due
26 May 2019
Grant issued
27 Jun 2019
Application Details
- Location
- JAMES STREET , WESTPORT , CO. MAYO
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Mayo County Council
Timeline
- Registration Date
- 14 February 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 23 May 2019
- Grant Date
- 27 June 2019
- Permission Expires
- 26 June 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of 1) combine two ground floor retail units into a single retail unit 2) the change of use of first floor office into a 1 bed apartment 3) a rear extension providing three, 2 bed apartments and access stairwell 4) new shop front 5) new rear access gate, together with all ancillary site works.
James Street , Westport , Co. Mayo
CONVERT EXISTING ATTIC SPACE INTO MASTER BEDROOM INCLUDING MINOR ALTERATIONS TO EXISTING LAYOUT AND ALL ANCILLARY SITE WORKS
APT. NO. 2 LIME COURT , JAMES STREET , WESTPORT
RETAIN EXTENSION AND MINOR ALTERATIONS TO ORIGINAL FLOOR PLAN LAYOUT PREVIOUSLY GRANTED UNDER PD1839 INCLUDING ALL ANCILLARY SITE WORKS
RETAIL UNIT NO. 3 , LIME COURT , JAMES STREET
Renovate and extend existing 2nd floor/attic space into a two-bedroom apartment including all ancillary site works.
Apt. No. 2 Lime Court , James Street , Westport Co. Mayo
The development will consist of the demolition of the existing public house and residential building and the construction of a proposed new café restaurant including preparation of hot and cold food, a food and beverage retail outlet with dine-in and takeaway services on the ground floor and a two-bed apartment on the first floor, including new shopfront, proposed new roof lights and clerestory glazing to the rear and all associated lighting, signage, drainage and service connections.
James Street , Westport , Co Mayo
The development will consist of the demolition of the existing public house and residential building and the construction of a proposed new café restaurant including preparation of hot and cold food, a food and beverage retail outlet with dine-in and takeaway services on the ground floor and a two-bed apartment on the first floor, including new shopfront, proposed new roof lights and clerestory glazing to the rear and all associated lighting, signage, drainage and service connections.
James Street , Westport , Co Mayo
RETAIN CONVERSION OF ATTIC SPACE INTO TWO BEDROOMS INCLUDING ALTERATIONS TO ORIGINAL LAYOUT GRANTED UNDER PD1839 INCLUDING ALL ANCILLARY SITE WORKS
APT NO. 3 LIME COURT , JAMES STREET , WESTPORT
change of use of existing offices to include: (1) change from offices to private accommodation, facilitating 2 no. residential apartments and (2) further modifications to existing external elevations, including front facade, together with all associated site works
James Street , Westport , Co. Mayo
ALTERATIONS TO THE ENTRANCES OF THE HOTEL RECEPTION, BAR AND RESTAURANT COMBINED WITH ALTERATIONS TO ADJACENT FACADES, ADJUSTED FACADE SIGNAGE, ADJUSTED LIGHTING, ALTERATIONS TO SHAPE/FINISH OF EXTERNAL TERRACE, TOGETHER WITH ALL ASSOCIATED ANCILLARY SITE WORKS
CLEW BAY HOTEL , JAMES STREET , WESTPORT
Planning permission for an array of photovoltaic panels on two southwest/carparking facing pitch roof elevations, inclusive of all ancillary site works and services.
James Street , Westport
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?