19994
CONDITIONALClare - Clare County Council
Proposed Development
to construct logistics (warehouse and distribution) building with photo-voltaic arrays on the roof with supporting offices, signage, flag poles, HGV, car and cycle-parking, service yard, new vehicular entrance/exit, connection to existing estate sewers, ESB sub-station, landscaping, boundary treatment and all ancillary site works necessary to facilitate the proposed development
View the full application file on the council's planning portal →Application Timeline
Application received
19 Dec 2019
Decision due
21 Feb 2020
Decision: CONDITIONAL
21 Feb 2020
Grant issued
23 Mar 2020
Application Details
- Location
- East Park Shannon Free Zone , Ballycasey Beg , Smithstown Shannon
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Clare County Council
Timeline
- Registration Date
- 19 December 2019
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 21 February 2020
- Grant Date
- 23 March 2020
- Permission Expires
- 22 March 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to erect signage to logistics (warehouse and distribution) building
Shannon Free Zone , Ballycasey Beg , Smithstown Shannon
for the construction of a detached single storey garage with single storey granny flat appended, connection to existing wastewater treatment system and percolation area, and all ancillary site and landscaping works
The Orchard , Drumline , Newmarket-on-Fergus Co Clare
for an external plant compound enclosed with a security fence to include Air Conditioning Units with condensers and dedicated outdoor air system on existing roof plant area, Chillers, Thermal Storage Tanks, Pump house, Generators, Transformers, and all ancillary site works
Drumline East Park , Shannon Free Zone , Shannon Co. Clare
to retain air handling unit located to rear of building and 2 no. chiller units with shed located to side of building; and planning PERMISSION for generator located to rear of building, 5 no. chiller units with new shed to side of building, high level louvre panels to existing building and all ancillary site works
Drumline , East Park , Shannon Free Zone Shannon Co Clare
for works which shall consist of; an extension to the eastern elevation measuring 870m2 to contain new clean room and dispatch facilities, a two-storey extension to the northern elevation measuring 580m2 ground floor an 395m2 first floor to contain new staff welfare facilities, a single storey extension to the northern elevation measuring 640m2 to contain additional warehousing space, a new staff car park with 320 spaces shall be constructed to the north (rear) of the site and accessed by means of a new entrance. A separate new goods entrance shall be constructed to the front of the site to the east of the existing staff entrance. All site ancillary works including temporary relocated car park spaces and access to same
Building 2 , East Park Shannon Industrial Estate , Shannon Co Clare
for the proposed development consist of: -A two-storey manufacturing expansion 13m high with a footprint of 2168.125 m2 and an overall floor area of 4340 m2 over two floors located to the North and adjoining the existing facility. - The facility shall be clad in micro-rib external cladding to match existing and contain a single loading dock arrangement on its western elevation. - A single storey electrical room measuring 12m x 5m x 3m high constructed from block cavity construction and completed with a built up concrete flat roof shall be located on the eastern side and adjoining the new development. - A single storey metal clad steel structure to house new equipment measuring 12m x 7m x4m high and located on the northern elevation of the existing building adjoining the new development. - A new perimeter roadway extending into the existing northern fallow area. - All associated site works and temporary works.
Building 2 East Park , Shannon Industrial Estate , Shannon Co Clare V14WN80
for works to the existing facility at Building 2, East Park, Shannon Industrial Estate, Shannon, Co. Clare. The proposed development consists of: -A two-storey manufacturing expansion 13m high with a footprint of 2168.125 m2 and an overall floor area of 4340 m2 over two floors located to the North and adjoining the existing facility. - The facility shall be clad in micro-rib external cladding to match existing and contain a single loading dock arrangement on its western elevation. - A single storey electrical room measuring 12m x 5m x 3m high constructed from block cavity construction and completed with a built up concrete flat roof shall be located on the eastern side and adjoining the new development. - A single storey metal clad steel structure to house new equipment measuring 12m x 7m x4m high and located on the northern elevation of the existing building adjoining the new development. - A new perimeter roadway extending into the existing northern fallow area. - All associated site works and temporary works
Building 2 East Park Shannon Industrial Estate , Shannon , Co. Clare
for development at the existing facility at Building 2, East Park, Smithstown, Shannon, Co Clare. The development will consist of: Installation of a 13MW solar photovoltaic system on the roofs of the Zimmer Biomet premises, along with the associated fixing and mounting systems. Installation of a battery energy storage system to comprise of 2 no. inverters and 2 no. 1.04MWh Batteries. Installation of a back-up generator. Installation of 2 no. transformers. All ancillary development including the construction of supporting concrete plinths, perimeter palisade fencing, electrical cabling, on-site drainage and the relocation of an existing storage unit
Building 2 , East Park Smithstown , Shannon Co Clare
to maintain the existing 30 metre high, free standing lattice communication structure, carrying antennae and communication dishes within an existing 2.4 metre high chainlink fence compound previously granted temporary permission LPA Ref P12/282 at ESB Telecoms Ltd telecommunication compound at ESB Drumline 110 kV Substation, Drumline, Shannon
Drumline , Shannon , Co. Clare
for (a) 12 no. 2MW Hydrotreated Vegetable Oil (HVO) generators; (b) 6 no. self-bunded 69m3 HVO tanks; (c) 6no. self-bunded 6m3 AdBlu tanks; (d) a 182m2 electrical/control building: (e ) a customer electrical compound complete with a transformer; (f) an ESB compound connected to the existing adjacent 110kV ESB substation situated immediately east of the proposed development; (g) a fuel loading bay complete with a 7,700L forecourt separator; (h) on site surface soakaways; (i) task lighting columns; (j) 3m high perimeter security fencing and compound separation; (k) new road entrance off the R458; (l) all associated internal access roads, car parking, surface water collection, ducting as required to deliver the works. The proposed development will include connection to public water mains. There is no sewer connection required as foul and process waste will be collected in an underground sealed tank and emptied by a specialist waste service provider. An Appropriate Assessment Screening Report has been prepared for the site. The application relates to a development which comprises an activity requiring an industrial Emissions Directive (IED) licence.
Drumline , Co. Clare