The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

20104

CONDITIONAL

Limerick - Limerick County Council

Proposed Development

construction of an extension to the rear of dwelling house, amend front porch area, external insulation and fenestration changes to all elevations, remove existing chimney, reduce overhang of existing roof and re-slate, an all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    13 Feb 2020

  2. Further information requested

    2 Apr 2020

  3. Further information received

    9 Jun 2020

  4. Decision: CONDITIONAL

    23 Jun 2020

  5. Decision due

    6 Jul 2020

  6. Grant issued

    28 Jul 2020

Application Details

Location
Coonagh East , Limerick , V94YDR5
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Limerick County Council

Timeline

Registration Date
13 February 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
23 June 2020
Grant Date
28 July 2020
Permission Expires
27 July 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

50m
2660024N/A15 Jan 2026

the construction of a vehicular entrance, dwelling house, garage, domestic proprietary waste water treatment system with polishing filter together with all associated site works

Coonagh East , Coonagh , Co. Limerick

168m
2560350CONDITIONAL23 Apr 2025

prefabricated Granny Flat structure to gable of existing dwelling and planning permission to construct a link structure from the Granny Flat to the gable of existing dwelling including revised front elevational treatment to the prefabricated structure to match existing dwelling and all associated site works

3 Upper Coonagh , Coonagh West , Limerick

171m
2360061CONDITIONAL13 Feb 2023

the construction of an extension to side of existing dwelling and all associated site works

3 Upper Coonagh , Coonagh West , Limerick

205m
2560127CONDITIONAL17 Feb 2025

a greenhouse, domestic garage and stores as constructed, retention permission is also sought for a packaged wastewater unit and tertiary eco-flo filter as installed

Upper Coonagh , Coonagh , Limerick

245m
21299REFUSED12 Mar 2021

construction of a dwelling house, detached garage, entrance, waste water treatment system, percolation area and all associated site works

Coonagh East , Coonagh

279m
2560088N/A6 Feb 2025

the construction of a new vehicular entrance and driveway, re-use of existing derelict house for habitable accommodation and construction of an extension to this forming a single dwelling house, installation of proprietary domestic waste water treatment system with polishing filter together with all associated site works

Coonagh West , Coonagh , Co. Limerick

281m
2560735N/A28 Jul 2025

the development of lands at Coonagh East, Coonagh Co Limerick, comprising the construction of 2 No Stables and attached fodder store, along with the development of new access gateway and boundary wall along the entire section of the lands

Coonagh East , Coonagh , Co Limerick

283m
2560929CONDITIONAL16 Sept 2025

the construction of 2 No. Stables and attached fodder store, along with the development of new access gateway and boundary wall along the entire section of the lands which front Coonagh Road

Coonagh East , Coonagh , Co Limerick

283m
2560606CONDITIONAL25 Jun 2025

the construction of a new vehicular entrance and driveway, re-use of existing derelict house for habitable accommodation and construction of an extension to this forming a single dwelling house, installation of proprietary domestic waste water treatment system with polishing filter together with all associated site works

Coonagh West , Coonagh , Co. Limerick

346m
181198REFUSED10 Dec 2018

the construction of a dwelling house with detached garage, splayed site entrance, waste water treatment system and all ancillary site works

Coonagh West , Coonagh , Co. Limerick.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?