20122
N/ATipperary - Tipperary County Council
Proposed Development
1.5 storey extension to rear of existing dwelling consisting of sitting room and playroom
View the full application file on the council's planning portal →Application Details
- Location
- Market Hill (Newtown) , Fethard , Co. Tipperary
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Tipperary County Council
Timeline
- Registration Date
- 12 February 2020
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
1 1/2 story extension to rear existing dwelling for sitting room and playroom
Market Hill , Fethard , Co. Tipperary
1.5 storey extension to rear of existing dwelling consisting of sitting room and playroom
Market Hill (Newtown) , Fethard , Co. Tipperary
1.5 storey extension to rear of existing dwelling consisting of sitting room and playroom
Market Hill (Newtown) , Fethard , Co. Tipperary
to construction a storey and a half split level dwelling with garage, new site entrance and associated boundary realignment. and all site development works including new effluent treatment plant and percolation area
Newtown , Fethard , Co Tipperary
a 1.5 storey dwelling, domestic garage, entrance, install septic tank including associated site works
Newtown (Ed Colman) , Fethard , Co. Tipperary
build a 1.5 storey dwelling, domestic garage, entrance, install septic tank including associated site works
Newtown , (Ed Colman) , Fethard
1. Change site boundaries from that as previously granted under 18601166, 2. Retention Planning Permission for design alterations; on-site position adjustment of as-constructed dwelling from that as previously granted under 18601166
Commons , Fethard , Co. Tipperary
construction of a 1 and 1/2 storey/bungalow dwelling, entrance onto laneway, wastewater treatment system with percolation area, connection to mains water, soakpits and all other associated site works
Commons , Fethard , Co. Tipperary
carrying out alterations to site entrance to the property including boundary set back to improve sight lines
Newtown , Fethard , Co. Tipperary
construction of a new entrance to my land, new access roadway and set back boundary fence including all associated site development works
Market Hill , Fethard , Co. Tipperary
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?