The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

201240

N/A

Tipperary - Tipperary County Council

Proposed Development

construct a covered geomembrane lined manure storage basin and associated works

View the full application file on the council's planning portal →

Application Details

Location
Kedrah , Cahir , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council

Timeline

Registration Date
21 October 2020
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

25m
201309N/A6 Nov 2020

construct a covered geomembrane lined manure storage basin and associated works

Kedrah , Cahir , Co. Tipperary

25m
201348CONDITIONAL16 Nov 2020

construction of a covered geomembrane lined manure storage basin and associated works

Kedrah , Cahir , Co. Tipperary

654m
18601027CONDITIONAL20 Aug 2018

(1) retractable gate/fence across existing site, (2) demolition of the existing canopy , (3) proposed new structure to encase existing over ground fuel tanks as well as providing canopy and store, (4) the erection of two new fuel dispensing pumps and all associated site works

Kedrah , Cahir , Co. Tipperary

678m
2560425N/A15 May 2025

extending an existing building – and all associated site development works

Kedrah , Cahir , Co. Tipperary

702m
2560442CONDITIONAL19 May 2025

extension to an existing building and all associated site development works

Kedrah , Cahir , Co. Tipperary

775m
2381CONDITIONAL29 Mar 2023

the refurbishment of existing bungalow and to erect an extension at the rear of same together with all associated site works including the provision of a new septic tank and percolation area

Shortcastle , Cahir , Co. Tipperary

813m
20253CONDITIONAL13 Mar 2020

1. construct a single storey rear extension and an enclosed front porch to front elevation, inclusive of ancillary site works 2. Retention Permission for alterations to as constructed single storey garage of previously permitted Planning (Reference P3 8711, 3. Retention Permission for alterations to as constructed single storey extension of previously permitted Planning (Reference P3 13289) 4. Retention Permission for as constructed single storey rear extension 5. Retention of re-location of septic tank and percolation from previously permitted Planning (Reference P3 8711)

Kedrah , Cahir , Co. Tipperary

818m
20208N/A6 Mar 2020

1. construct a single storey rear extension and an enclosed front porch to front elevation, inclusive of ancillary site works 2. Retention Permission for alterations to as constructed single storey garage of previously permitted Planning (Reference P3 87)), Retention Permission for alterations to as constructed single storey extension of previously permitted Planning (Reference P3 13289) 4. Retention Permission for as constructed single storey rear extension 5. Retention of re-location of septic tank and percolation from previously permitted Planning (Reference P3 8711)

Kedrah , Cahir , Co. Tipperary

880m
2460925CONDITIONAL29 Oct 2024

the construction of a dwelling, entrance, waste water treatment system and all associated site development works

Mortlestown , Cahir , Co. Tipperary

913m
19600752CONDITIONAL4 Jul 2019

demolition of the existing single storey section to the rear of existing two storey dwelling and to build new single storey extension to the same footprint but with changes to the internal layout and elevations all from that existing. And for Permission for minor alterations to the internal layout and to the rear elevation of existing two storey dwelling, all with associated site works

Kedrah , Cahir , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?