201302
REFUSEDWicklow - Wicklow County Council
Proposed Development
1 x one single storey, stepping down to two storey dwelling (two bedrooms), removal of existing septic tank and percolation area and installation of 2 new septic tanks and associated percolation areas and alterations to existing site contours
View the full application file on the council's planning portal →Application Timeline
Application received
21 Dec 2020
Decision: REFUSED
19 Feb 2021
Decision due
23 Feb 2021
Application Details
- Location
- Merrylands , St. Valery , Fassaroe
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Wicklow County Council
- Site Area
- 0.51 ha
- Floor Area
- 163.2 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 21 December 2020
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 19 February 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
one single storey, stepping down to two storey dwelling (two bedrooms), removal of existing septic tank and percolation area and installation of 2 new septic tanks and associated percolation areas and alterations to existing site contours
Merrylands , St Valery , Fassaroe
1 x one single storey, stepping down to two storey dwelling (two bedrooms), removal of existing septic tank and percolation area and installation of 2 new septic tanks and associated percolation areas and alterations to existing site contours
Merrylands , St. Valery , Fassaroe
2 x 1 single storey, stepping down to two storey dwellings (1 x 3 bedroom and 1 x 2 bedroom) together with 1 x new vehicular entrance driveway and 1 x extension of existing vehicular driveway, removal of existing septic tank and percolation area and installation of 3 new septic tanks and associated percolation areas and alterations to existing site contours
Merrylands , St Valery , Fassaroe
convert the existing 5 halting site units and caketaker facilities to 3 houses, with upgraded wastewater facilities and new pedestrian access
Silverbridge , Bray , Co. Wicklow
refurbishment of St Valery's House (protected structure). Works include demolition of the existing workshop building to the east of St Valery's House, change of use of the ground, first and second floor levels of St Valery's House from residential to office use, refurbishment of St Valery's House. Works to include internal modifications to the existing house including reconfiguration of existing rooms at ground and first floor level to accommodate office use and internal demolition works and reconfiguration of existing rooms at the lower ground floor level to accommodate 2 no 2 bedroom apartments. External modifications including amendments to existing fenestration and elevations. The removal of the existing non original conservatory at the rear of the St Valery's House and modifications to the rear elevation including new glazing to ground floor corridor (to replace conservatory), new railings to existing lightwell, new openings to the rear façade at lower ground floor, and new glazing to lower ground floor apartments. The provision of 20 car parking spaces to serve the proposed development. Upgrades to the existing internal access road through the site and the entrance from the Kilbride Lane, the proposed development also includes the installation of a wastewater treatment system, all ancillary site development and landscaping works
St Valery's House , Fassaroe , Bray
refurbishment of St Valery's House (protected structure). Works include demolition of the ground, first and second floor levels of St Valery's House from residential to office use, refurbishment of St Valery's House. Works to include internal modifications to the existing house including reconfiguration of existing rooms at ground and first floor level to accommodate office use and internal demolition works and reconfiguration of existing rooms at the lower ground floor level to accommodate 2 no 2 bedroom apartments. External modifications including amendments to existing fenestration and elevations. The removal of the existing non original conservatory at the rear of the St Valery's House and modifications to the rear elevation including new glazing to ground floor corridor (to replace conservatory), new railings to existing lightwell, new openings to the rear façade at lower ground floor, and new glazing to lower ground floor apartments. The provision of 20 car parking spaces to serve the proposed development. Upgrades to the existing internal access road through the site and the entrance from the Kilbride Lane, the proposed development also includes the installation of a wastewater treatment system, all ancillary site development and landscaping works
St Valery's House , Fassaroe , Bray
development at a site of c3.7 ha located at Kilbride Hill House (protected structure 26) and ancillary woodlands to the west of Kilbride Hill House. The development will consist of construction of 43 no dwellings, the extension of the existing gate lodge and the creation of a new curtilage for Kilbride Hill House which will be retained as a private residence. An existing log shed, glass house and pump house will be demolished (total area c31.61 sqm). The ancillary woodland to the west of Kilbride Hill House will remain undeveloped excepting the proposed upgrading and lighting of an existing pedestrian path located adjacent to Aston Wood and accessed from Herbert Road. The 43 no dwellings will comprise 14 no two storey 4 bed detached dwellings, 1 no two storey 3 bed detached dwelling and 28 no two storey 3 bed semi detached dwellings, an existing modern extension to the gate locate of c 14.2 sqm will be demolished and a single storey extension of c 51.1 sqm constructed to provide a 2 bed dwelling. The total number of existing and proposed dwellings will be 45 no. The proposed development will include 90 no car parking spaces to be provided on street and within curtilage, provision of public open spaces totalling c 4581 sqm (plus incidental open spaces totalling c 8973 sqm) and a childrens play area, pedestrian links to the woodland to the north west of the site, and all associated site services and site works. The existing entrance will be retained and upgraded. The completed development will be maintained by an Estate Management Company
Herbert Road , Bray , Co. Wicklow
installation of footpaths and public lighting , consisting of works as follows (a) regrading of verges, vegetation clearance and tree felling as required (b) construction of about 410m of concrete kerb and macadam footpaths varying from 1.5 - 1.8m in width (c) reducing roadway width to 6.0m on straight sections and 6.5m on curves, including widening of existing concrete footpath. Existing width on hairpin bend maintained. (d) install cable ducts, maximum 6m high lighting columns and S2 class lighting. (e) Install an advisory pedestrian crossing and ancillary warning signs on the route (f) new road surface over lay and landscaping disturbed ground at completion of other civil works
Herbert Road , Kilbride , Bray
demolition of existing outbuildings an barn to the north of the site and dwelling to the south of the site "Kibo Lodge" located at Bray Road, Cookstown, Bray, Co. Wicklow, A98 E227; The construction of 27 no. dwellings to be provided as follows; 17 no. 3 bed townhouses set out in 4 no. terraces with associated balconies, 6 no. 3 bed detached cantilever houses, 2 no. 5 bed detached houses, 1 no. 7 bed detached house, 1 no. 2 bed single storey replacement house on the footprint of the dwelling to be demolished; 31 no. of car parking spaces (including 1 no. visitor and 1 no. accessible space) will be provided to serve the proposed townhouses at the north of the site; The detached houses will be provided with car parking within the curtilage; Access to the south of the site will be served by new vehicular entrance off Bray Road (R117) via a new bridge over the Glencullen River, new pedestrian access off Bray Road (R117) also to be provided. The existing site entrance from Kilbride Lane and internal road to the north of the subject site will be retained and upgraded to accommodate the proposed residential development; The provision of a new boundary to separate the proposed residential development and St. Valery's House (Protected Structure) including landscaped screening and gates to the entrance of St. Valery's House; On site pumping station to be provided and new 80mm pvc rising main to be constructed from the proposed access on Bray Road (R117) outfalling into the public sewer n Enniskerry; All associated site development, boundary treatments, infrastructural, green roofs and landscaping works
St. Valery's , Fassaroe , Bray Co. Wicklow
two storey detached dwelling (256sq.m) with future habitable attic space (68sq.m) on a site with shared existing entrance and all associated site works
Castlefield , Fassaroe Lane , Fassaroe Bray
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?