The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

201390

CONDITIONAL

Tipperary - Tipperary County Council

Proposed Development

amendments to 2 no. existing dwelling houses on site no. 1 and site no. 2 as constructed under planning permission ref. 05511121 and full planning permission for the following: 1) 1 no. new dwelling house on site no. 3 and ancillary works and services, 2) construct a new foul sewer pipeline to run along the public road fronting and connecting to the proposed development, which will allow future foul sewer connections for existing residents along Killeen Lane, 3) construction of a new foul sewer pump station and rising main, which will service the entire proposed development and existing residences on Killeen Lane, which is proposed to connect to an existing public foul sewer manhole on Killeen Lane, 4) completion of all ancillary works to partially completed development, (original partially completed development previously granted under planning permission ref. 05511121)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 Nov 2020

  2. Further information requested

    25 Jan 2021

  3. Further information received

    4 May 2021

  4. Decision: CONDITIONAL

    26 May 2021

  5. Decision due

    31 May 2021

  6. Grant issued

    29 Jun 2021

Application Details

Location
Killeen , Birr , Co Tipperary
Applicant
N/A
Application Type
RETENTION
Planning Authority
Tipperary County Council
Site Area
2.227 ha
Floor Area
213 sq m
Residential Units
1

Timeline

Registration Date
24 November 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 May 2021
Grant Date
29 June 2021
Permission Expires
28 June 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

18m
201388CONDITIONAL24 Nov 2020

construction of 6 no. new dwelling houses and ancillary services within a partially completed development (original partially completed development previously granted under planning permission ref. 05511121)

Killeen , Birr , Co Tipperary

43m
201356N/A17 Nov 2020

construction of 6 no. new dwelling houses and ancillary services within a partially completed development (original partially completed development previously granted under planning permission ref. 05511121)

Killeen , Birr , Co Tipperary

46m
201353N/A17 Nov 2020

amendments to 2 no. existing dwelling houses on site no. 1 and site no.2 as constructed under planning permission ref. 05511121 and (A) full planning permission is sought for the following: 1) 1 no. new dwelling house on site no. 3 and ancillary works and services. 2) construct a new foul sewer pipeline to run along the public road fronting and connecting to the proposed development, which will allow future foul sewer connections for existing residents along Killeen Lane, 3) construction of a new foul sewer pump station and rising main, which will service the entire proposed development and existing residences on Killeen Lane, which is proposed to connect to an existing public foul sewer manhole on Killeen Lane, 4) completion of all ancillary works to partially completed development, (original partially completed development previously granted under planning permission ref. 05511121)

Killeen , Birr , Co Tipperary

289m
19601254CONDITIONAL7 Nov 2019

demolition of existing shed and conversion of existing barn into 2 no. residential units together with all associated site works

Killeen Yard , Killeen , Riverstown Birr Co. Tipperary

480m
18600174CONDITIONAL14 Feb 2018

a single storey extension to the rear and sides of the existing cottage, minor alterations and renovation of existing cottage including new and replacement windows, external insulation and all associated site works and services

Killeen Cottages , Riverstown , Birr

501m
201061CONDITIONAL18 Sept 2020

1. part demolition of existing entrance 2. proposed new single storey extension (135m2) consisting of new classroom 76m2 including ancillary toilets and wash up area, new set room, circulation area, secretary office, lobby, part M External steps and ramp, together with all associated site works

Killeen National School , Killeen , Riverstown

530m
18600055N/A23 Jan 2018

single storey extension to the rear and sides of the existing cottage, minor alterations and renovation of existing cottage including new and replacement windows, external insulation and all associated site works and services

Killeen Cottages , Riverstown , Birr

534m
19601385CONDITIONAL12 Dec 2019

removal of existing conservatory to side of existing dwelling, build new extension to side of house to replace existing conservatory and all associated site works

Killeen , Riverstown , Birr

582m
2360528N/A18 Jul 2023

a dwelling, garage, entrance, access road and waste water treatment system including associated site works

Killeen , Rathcabbin , Roscrea Co. Tipperary

584m
2460129N/A26 Feb 2024

the erection of a dwelling, garage, access road from an existing entrance to form a shared entrance and wastewater treatment system, including associated site works

Killeen , Rathcabbin , Roscrea Co. Tipperary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?