201589
CONDITIONALGalway - Galway County Council
Proposed Development
for development consisting of upgrading and improvement works at this 0.3 Ha site of an existing electrical substation including: (1) the provision of a new c. 3.2 m high fence on the eastern (rear) boundary and the extension of the existing substation compound by c. 88 sq.m.; (2) the development of a new c. 4.5 m high control module (c. 34 sq. m.) and a 4.6 m high MV module (c. 26 sq.m.); (3) the installation of new electrical plant and equipment including NER units, 4 No. transformers, Load Break Fault Make Switch (LBFM) units and a 18 m high Scada pole; (4) the associated demolition of a control building (c. 20 sq.m.); (5) the relocation of some items of plant within the site; and removal of electrical plant and equipment including a Scada pole, cubicles, transformers and other ancillary items of equipment; (6) the provision of a new c. 1.1 m high stone wall and entrance gate along the western (front) roadside boundary and ancillary site clearance and development work including the provision of site services e.g. drainage. Gross floor space of proposed works: 60 sqm. Gross floor space of any demolition: 20 sqm
View the full application file on the council's planning portal →Application Timeline
Application received
29 Oct 2020
Decision: CONDITIONAL
17 Dec 2020
Decision due
23 Dec 2020
Grant issued
8 Feb 2021
Application Details
- Location
- An Spideal Thiar ,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Galway County Council
- Site Area
- 0.3 ha
Timeline
- Registration Date
- 29 October 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 17 December 2020
- Grant Date
- 8 February 2021
- Permission Expires
- 7 February 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
of the development will comprise the following: a) A total of 15 No. residential units consisting of 4 No. – Type A – 3 Bed Semi Detached Houses, 4 No. – Type B – 3 Bed Semi Detached Houses, 7 No. – Type C – 2 Bed Semi Detached/Terraced Houses b) Pedestrian, cycle and vehicular access/egress with Baile Árd road, c) All car parking, landscaping, boundary treatments, public lighting, service connections and all associated site works. Gross floor space of proposed works 1,531.90 sq m.
Ard Na Speire , An Spidéal , Co. Na Gaillimhe
don méid seo a leanas: Cead na hoibreacha a rinneadh ar an suíomh cónaithe a deonaíodh faoi Uimhir Pl 04/3817 a choinneáil agus a chríochnú. Tá na hoibrecacha seo comhdhéanta díobh seo leanas; cead gach obair forbartha ar an suíomh a choinneáil agus cead chun an dá aonaid leathscoite atá curtha ina gcríoch a choinneal, ocht gcinn de aonaid leathscoite atá páirt-chomhlánaithe, aonad amhain scoite atá páirt-chomhlánaithe, cead ocht gcinn de aonaid leathscoite nua a thógáil chun tosaigh an tsuíomh, cead an córás cóireála searachais a chur i gcrích agus ceangail leis an corás poiblí chomh maith le oibreacha suíomh ina áirítear gach oibreacha coimhdeacha mar a deonaíodh cheana faoi Uimhir Pl 04/3817. Spás urláir comhlán na n-oibreacha: 2326.6 sqm. Spás urláir comhlán na hoibre atá le coinneáil: 1127.6 sqm
An Spideal Thiar ,
chun Teach nua cónaithe a thógáil chomh maith Garáiste nua agus le Córás searachais nua
An Spidéal Thiar , An Spideal , Co an Gaillimhe
for the demolition of an existing derelict dwelling, construction of a new dwelling house, domestic garage, new wastewater treatment and percolation system and all ancillary site works & site services. Gross floor space of proposed works: 207 sqm. Gross floor space of any demolition: 154 sqm
An Spidéal Thiar , Bóthar na hAbhainn , Contae na Gaillimhe
chun Teach nua cónaithe a thógáil, Garáiste nua, uasghradú a dheanamh ar an bóthar príobháideach isteach chuig an suiomh agus Córás searachais nua, ag an seoladh thuas. Spás urláir comhlán na n-oibreacha beartaithe: 215.40 sqm (house) & 54 sqm (garage)
An Spidéal Thiar , An Spideal Thiar , Co na Gaillimhe
chun teach nua cónaithe a thógáil, garáiste nua, uasghradú a dheanamh ar an bóthar príobháideach isteach chuig an suiomh agus córás searachais nua
An Spideal Thiar , Co na Gaillimhe
chun teach nua cónaithe a thógail chomh maith le garáiste nua agus córas séarachais nua
An Spidéal Thiar , An Spidéal , Co. Galway
chun teach nua cónaithe a thógail chomh maith le garáiste nua agus córas séarachais nua
An Spidéal Thiar , An Spidéal , Contae Na Gaillimhe
for development consisting of a new 3.3m high welfare building containing a toilet and wash-hand basin, and a new 2.5 m high kiosk housing the electrical controls to serve Spiddal Wastewater Treatment Plant - Planning Register Ref: 18/766 and An Bord Pleanála Ref: ABP-302847-18, and all associated ancillary works and other enabling works. Gross floor space of proposed works: 9.4 sqm
An Spidéal Thiar ,
for the construction of a new wastewater treatment plant (WWTP) adjacent to the existing Craft Village WWTP. The works will include the construction of new inlet works, 1 no. primary settlement tank, 4 no. RBC units, 1 no. final settlement tank, and 1 no. sludge storage tank, along with all ancillary works interconnecting pipework, and site development works. The works will also include the decommissioning of the existing wastewater treatment plant on the site. Gross floor space of proposed works 253.3 sqm. Gross floor space of work to be retained 15.5 sqm.
Spiddal ,
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?