The Register of Planning Applications · Éire

Monday 31 August 2026

← Back to search

201590

N/A

Tipperary - Tipperary County Council

Proposed Development

tourism visitor facility to incorporate exhibition space, associated retail, cafe and visitor services facilities, admin areas, independent office space and associated site works to incorporate children's play area, golf putting area, car parking area, waste water treatment system and associated percolation area. Proposed development proposed demolition of existing derelict buildings (Former Creamery Eircode V94RHF1) and derelict dwelling Eircorde V94 N6WH

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Dec 2020

  2. Further information requested

    18 Feb 2021

  3. Further information received

    27 Jul 2021

  4. Application withdrawn

    31 Aug 2021

Application Details

Location
Former Creamery , Birdhill , Co. Tipperary
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Tipperary County Council
Site Area
1.193 ha

Timeline

Registration Date
23 December 2020
Status
DEEMED WITHDRAWN
Decision
N/A
Withdrawn
31 August 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
211327CONDITIONAL6 Sept 2021

tourism visitor facility to incorporate exhibition space, associated retail, cafe and visitor services facilities, admin areas, independent office space and associated site works to incorporate children's play area, viewing platform, golf putting area, car parking area, waste water treatment system and associated percolation area, proposed development proposes demolition of existing derelict buildings (former Creamery (Eircode V94 RHF1) and derelict dwelling (Eircode V94 N6WH))

Former Creamery , Birdhill , Co Tipperary

174m
21883CONDITIONAL18 Jun 2021

to erect a dwellinghouse, entrance, install an effluent treatment system and percolation area and associated site works

Station Road , Birdhill , Co. Tipperary

177m
21837N/A10 Jun 2021

to erect a dwellinghouse, entrance, install an effluent treatment system and percolation area and associated site works

Station Road , Birdhill , Co. Tipperary

223m
18601427CONDITIONAL30 Nov 2018

construction of a new domestic garage

Pollagh House , Birdhill , Co. Tipperary

245m
2460035CONDITIONAL21 Jan 2024

the construction of detached single storey dwelling, detached domestic garage, onsite wastewater treatment system, connection to necessary services together with all associated site and incidental works

Birdhill , Co. Tipperary

260m
22295N/A14 Apr 2022

Portable slyle changing rooms and toilet block facilities, on site waste water treatment system, alterations to existing entrance and all ancillary works

Birdhill , Co. Tipperary

268m
2260192CONDITIONAL27 Apr 2022

portable style changing rooms and toilet block facilities, on site waste water treatment system, alterations to existing entrance and all ancillary works

Cooleen , Birdhill , Co.Tipperary

310m
2660311N/A10 Apr 2026

development which will consist of outline permission for 6 No. detached four-bedroom dwellings, and associated wastewater treatment system including tertiary treatment and percolation area. Permission is sought for a new site entrance, new boundary treatment, connection to the local main water supply, and all associated site works for service sites

Birdhill , Co. Tipperary

319m
20393CONDITIONAL17 Apr 2020

to demolish existing dwelling house and shed and replace with a new dwelling house and garage, upgrade existing waste water treatement system and construct a new entrance along with all ancillary site works

Birdhill , Co. Tipperary

319m
2360104CONDITIONAL17 Feb 2023

to demolish existing dwelling house & shed and replace with a new dwelling house & garage, upgrade existing waste water treatment system & construct a new entrance along with all ancillary site works

Birdhill , Co. Tipperary

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?