201940
CONDITIONALGalway - Galway County Council
Proposed Development
chun síneadh a chur leis an Scoil chomh maith le aon oibreacha ar an suíomh a bhaineann leis an forbairt. Spás urláir comhlán na n-oibreacha beartaithe: 44.81 sqm. Spás urláir comhlán na hoibre atá le coinneáil: 386.24 sqm + 27.8 sqm
View the full application file on the council's planning portal →Application Timeline
Application received
16 Dec 2020
Further information requested
16 Feb 2021
Further information received
15 Aug 2021
Decision: CONDITIONAL
9 Sept 2021
Decision due
11 Sept 2021
Grant issued
25 Oct 2021
Application Details
- Location
- Ros An Mhíl ,
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Galway County Council
- Site Area
- 0.36 ha
Timeline
- Registration Date
- 16 December 2020
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 9 September 2021
- Grant Date
- 25 October 2021
- Permission Expires
- 24 October 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
chun (a) síneadh a chuir as Scoil Cholmcille Ros a' Mhíl (b) ionad réamhscolaíochta a thógáil (c) uasghadú a dhéanamh ar an gcoras córas séarachais (d) oibreacha coimhdeach eile a dhéanamh. Spás urláir comhlán na n-oibreacha beartaithe: 286sqm
Ros an Mhíl ,
chun: (1) cead chun aon athruithe ar an gharáiste teaghlaigh a deonaíodh cheana faoi Uimh Pleanála 16/703 a choinneáil agus an t-athrú úsáide ar an gharáiste teaghlaigh a athrú go úsáid chónaithe, (2) pleanáil dhá lorg chun sineadh idir-nascadh a thógáil chun an teach agus an gharáiste a cheangal le aonad amháin a chruthú, (3) cead dhá lorg an bealach isteach breise chuig and suíomh a dhúnadh agus an balla a thogáil agus gach seirbhís láithreáin a bhaineann leis, ag an seoladh thuas. Spás urláir comhlán na hoibre atá le coinneáil: 128.10 sqm. Spás urláir comhlán na n-oibreacha beartaithe: 37.20 sqm
Ros An Mhíl , Bailen a hAbhainn , Co na Gaillimhe
chun: (1) aon athruithe ar an gharáiste teaghlaigh a deonaíodh cheana faoi Uimh Pleanála 16/703 a choinneáil agus an t-athrú úsáide ar an gharáiste teaghlaigh a athrú go úsáid chónaithe, (2) pleanáil dhá lorg chun sineadh idir-nascadh a thógáil chun an teach agus an gharáiste a cheangal le aonad amháin a chruthú, (3) cead dhá lorg an bealach isteach breise chuig and suíomh a dhúnadh agus an balla a thogáil agus gach seirbhís láithreáin a bhaineann leis. Spás urláir comhlán na hoibre atá le coinneáil: 128.10 sqm & 37.20 sqm
Ros An Mhíl , Baile na hAbhainn , Co na Gaillimhe
chun teach cónaithe, Córas Séarachais agus Garáiste, a thógáil Gross floor space of proposed works; 238sqm house + 60sqm Garage
Ros An Mhil ,
of pl. ref. 20741, chun teach cónaithe, córas séarachais agus garáiste, a thógáil. Gross floor space of proposed works; 238sqm house + 60sqm Garage
Rossaveal , Ballinahown , Co. Galway
chun Teach nua cónaithe a thógáil chomh maith le Garáiste nua agus Córás searachais. Gross floor space of proposed works: 218.00 sqm(H), 67.20 sqm(G)
Ros an Mhíl , Ros an Mhíl , Co na Gaillimhe
chun aonad tráchtála atá ann cheanna fhéin a athrú isteach ina teach conaithe agus na oibreacha uilig atá ag baint le sin chomh maith le cead coinneála an córas séarachais atá ann cheanna a choinneal, chomh maith le gach seirbhís láithreáin ghaolmhar
Na Doiriú Theas , Baile na hAbhainn , Co na Gaillimhe
chun athrú úsáide ó teach cónaithe go dtí teach loistín le sé seomra codladh, agus cead choinneáil le aghaidh an uasghradú atá deanta ar an gcoras searachais a bhí ann theanna fhein a choinneáil chomh maith le aon oibreacha láithreáin gaolmhara ata ag baint leis an forbairt
Na Doiriú Theas , Baile na hAbhainn , Co. na Gaillimhe
for the development consisting of the provision of 2 No. new single pole structures and refurbishment and upgrading works [including (where necessary) replacement of existing poles along the existing overhead electricity line, minor ground works e.g. replacement or installation of stays, and maintenance or improvement works]; and all associated ancillary works including the provision of temporary accessways. Replacement poles will be constructed at, or immediately adjacent to, the existing structures that they will replace. Replacement poles and the new poles will have a maximum height of 12m above ground; and be similar in appearance to existing poles. Planning permission is sought for a 10 year period. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
Aran Islands – Carraroe South , Barraderry Ballintleva Carrowroe North Derrynea and Carrowroe South in County Galway.
chun an méid seo a leanas a thógáil 1) Cead chun páirt don gharáiste atá ann cheana fein a athrú isteach ina oifig, stór seomra 'embalming', seomra taispeáint agus leithreas 2) Cead chun car chlós a thógáil le taobh an gharáiste 3) Leagan amach an bealach iontrála ata ann cheanna fein a athrú 4) Cead córas séarachas an tí a cheangal leis an gharáiste 5)Cead an comhartha atá ann cheanna féin a choinneal chomh maith le comhartha nua a chur suas, chomh maith le aon seirbhisí eile a bheadh ag baint leis an tionscnamh. Spás urláir chomhlán na n-oibreacha beartaithe 96.8sqm.
Na Doiriú Theas ,
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?